HomeMy WebLinkAboutVerraso Village Storm Drainage Calc STORM DRAINAGE CALCULATIONS FOR: • VERRASO VILLAGE Meridian, Idaho July 13, 2015 AS PREPARED BY: Intermountain Engineering 2587 SouthSide Blvd.. Melba, Idaho 83641 (208) 941-1245 oF 1 . CALCULATIONS FLOW CALCULATIONS Flow nd volume for the basin areas were calculated using the Rational Method. The"C"coefficient used in the calcul tions is based on weighted values as shown. Since historical drainage is not available, a 100-yr event is exami ed. PIPE IZING AND HYDRAULIC GRADE CALCULATIONS These calculations employ the Manning Equation.The hydraulic grade is based on calculated flow and selected pipe si e. DETE TION VOLUME CALCULATIONS Since .n outfall is not provided, detention volume is based on the rational method using the 100 year storm over the wo st case time of concentration& 1 hour 100 year storm. POND VOLUME CALCULATIONS The p• d volume calculations are based on an average of the water surface area and the pond bottom area, applie. over the design pond depth. GENE"AL NOTES Runoff ater will enter the drop inletrs after being collected and flowing in the gutter plate. Water then flows throug a sand and greese trap before entering the sepage bed.All water will be retained on site and percolate into th'- underlying soils.There will be no discharge off site. EQUATIONS USED IN CALCULATIONS RATIONAL METHOD Q=CiA where: Q=Runoff Rate, cfs C=Runoff Coefficient i=Storm Intensity, in./hr. A=Basin Area(s), acres MAN ING EQUATION V=1.49R2/3S1'2/n where: V=Velocity,fps R=Hydraulic Radius,ft. S=Channel Slope,ft./ft. n=Manning Roughness Coefficient PERC.LATION VOLUME(SCS TRIANGULAR UNIT HYDROGRAPH METHOD) V=(Area)(Perc. rate)(t)/(12)(60) where: V=Volume,cu.ft. Area=Infiltration bed area, sf Perc. rate=percolation rate, in/hr t=worst-case duration, min. ORIFI'E EQUATION Q=(Coefficient)(3.1416 x Radius2)(64.4 x Head)" where: Head=W.S.E.-Center of Orifice =81.50-78.14 =3.4' OTHE- EQUATIONS USED Q=VA where: Q=Flow, cfs V=Velocity,fps A=Cross Sectional Area,sq.ft. ... Appendix D D AN A 0 A 1~444VIA, Q. STATE OF IDAHO ,, ' , AREA CLASSIFICATION MAP 0 h•,... 1 s. A W1:fRw I ;.�, r. • W'**4 District Number q. nation _., Desi3 fr Jr'f0.7 H Ili, t Air'\,..,-/ � 7 a#4404 '4 i'!,f 0 j ..ti coal. y t..4..., el , T. 1 ) 1. ��j��V�j ' -- ` ir WTI I iEmf 411000 x60641.;n7�ow I ..: ., I 1 II 44a. 1 f4 AM�rt`Mkif 2. ® 1 a A 4..4444, ,1.�..,....,,, �.�. "'3 F d t 640.404 'x,)} :ro.s 1rr ta9;*4 I . polo "���+,J 7- `,.......0"'","*".I ' � . . ...... .,. 410.4._.. f NEwAW Figure b-I, State of Idaho Area Classification ?dap January 19 7 )t ;I t/1,.,-.+,.xrt496 r.trir d•.fSSt n. Design Manual Hydraulics Appendix B Figure B-9 Sheet l of 9 :UIH___ iIr .� 11111_1_11 irorr rorrivrNcr ANALYSIS Sr NITNOO Of 0 _ rllo MrrMl ' � �rtrEXTR�EMZ yawl's. Arria rVMI1L iMn=� rilmrnl1111111111111M ■1■1MC �, �r rrrrr rI MIrrrrie ZONE A & 4.0 ��� Irr�rl� NMI IC N , 1 EMIR INTENSITY-DURATION--FREQUENCY 1114111.1616111111111 . ,% �1 Iii 111111111111�dOhio. , 10 Z OAS .111111111111111111MOMaihrlibitgliM... Pea 111111111111111111111011110111•11111111= Al Mruii___ ►.1�IAAi: ., .. ���r��C >. auuu r 1 ., �\` ''`►. �rrr•••— IC o., �r���rrrrrr��i~ �rrr1rr rl ��r�rr mt-.��.'� IC 111111111111.1• illialaxisli.1111r NINE C1 ���l�� uir �� .1 J +' A1t♦�rMEMNIMI. NUM MOM 1111 oftg% a� a���l•��7N,i:♦`0104. z =Ma 111111111111111111111111111111111111 11111Mm111111111 OMB IC MIN Vt: s4. 21111111111111 1111111111111111a.����1Irrrrr�ra�rr��lr►M,►-; - ,3421111111111111111111111111111111111111�Mrr�rrrr��,,M;, �r�'! �� rrrrrrirl► °� �rrr rrr � 1111111111111111 11111113 40 SOBO { * ISI i N U T E g Zs i 1I � M O U g g 0 U R AT I Q N I I M y L M M • '3AV 5021O038 N -_ - . - _ 9..9 9..9 S 5„9tillir it 1 I C . 1 l--4�•-I 5009-E t355p I.i...,• 1�- T.Ey'T/1 1 v t'91.99991 ASb 1N31DStl3 moms atend 304,61-701 ,�.. ' 1 I I Z9..B9901 lSb AN31t35tl3 4131.1 Nina 3W,S St m t � o'� me --J m t NttlM3049.9 Mirillig 1..... 5-4 1k► �9 vL s'n win I „ .ago 0 0< rr M. '1J• LI 111 3 I n '7C1‘!, + id-,._- ---u,t .. .1 • 1� I _ A _ 0 o r"4" H I o 1+ 11P `?' /N 7 t o ' II I+ P Wiz71. III ` m o 2 I� IAt. .y� _ AB rir t 1_,_ ,0 ,--,, 4.. a R1i� In w 4II'-"' 114 '.. •V w ' w CD m 1I= F F ih a 11 i It 1 o 0 Ik � fILL cr< V rl �� AI h I 0 o Mi I �'Jk '_1 [n I 'v, u Y P _ 13 4( P .m... r,\ b r 'z,N,, . r:4 0 lt, � w ' LOT LINE TO E VACATED VACATFO � @ ki . DI 11 I 'as N - MEM -]n o irr,,i, I I I 4 zUlu a n W .-7A. � 1 14Y o 16 L cn_ { i I - 9- j 1E I I Cgti $ Q§ it ry � n I m 1 Q W , o N it tt iii , h a I � 1 i ' J l. d — IivA •e .; moi, r;>✓. -..tet. �.. ,n--'0-�-.. Z :,4, . O ,11 ►,' o it $ JJ I o ■1''I o z 11 L In 1 'J I+ - • U I * ' m I 11 u^Ir- :' IIS �'I' O + 0 a * W 11j )�I J I I �_ mn � �`.)f is 11 417. : 3 WM II V 4 41 ? III I�\) II sof It 111 I I.1 v T • ......_,M1 III i ���� 4 a �"I. n0 a I. o � � u My I I II i Iii Isom � oft,- Vr ..„.. #(11 6.00' 7 C\16 ei �7T�- N a s W 4 lir, 's'71.97' 'ir./ I ' r __�_ W cn �,,;) �, 6 -.Jy��� -""-rirj /33331 t cS __��,,��II - r9G6Ai- .4 5 !31'- J J •JJJJ ' i JJJJJJJJJJ JJJJJ_ 'JJJJJJJJJJJJJJJJ J_1 J JJJJ) JJJJ -4JJJJ I 111 III ,-S _ JJJJJJJJ. �' J i,,,,,,,,,„: 1XlWlJtl!SSlJJtl IyRW WNtl:JMlN - _.- =p J N000006 w 'J- ,-1_tJJ J JJJJ) A� ` iu Ex , -il- -•--•-® 135.50' !9 •_ • I. G NO06016 W 136.05 :1 z m -y- 1- -• -4-----..__ 1? ) 'Y AL 1 INTERMOUNTAIN ENGINEERING 2587C Southside Blvd. Verraso ViAage Me ba,Idaho 83041 (201)941-1245 (FAX)495-2409 Meridian,Idaho DATE 7/13/2015 PRI.DEVELOPED FLOIA AND VOLUME CALCULATION(Area 1 __- FILE: Verraso PAGE The weighted runoff Coefficient for the developed site Is calculated. • C c RUNOFF COEFFICIENT(EXIBIT"B"Recommended"C"Coefficients for"Rational Method Equation"-Peak Rate of Discharge) • Cu=UNIMPROVED AREA RUNOFF COEFFICIENT =0.10 Cd=DEVELOPED SINGLE FAMILY RESIDENTIAL RUNOFF COEFFICIENT =0,50 (or use calculated(weighted)value If Ngher) _ BLDG&PAVED ACRES(0.95)+LANDSCAPED ACRES(0.10) TOTAL ACRES 0.417 •(0.95)+ 0.235 •(0.10) _--- 0.052 0.04 PRE-DEVELOPED FLOW ND VOLUME CALCULATIONS The pre-developed flow for a project site and the upstream area from the slte are calculated using the Rational Method.The t e of concentration Is based on overland flow to a point of channelization and then the travel lime in t e existing channel to the downstream end of the concerned area. The pre-developed volume I calculated using the SCS Triangular Unit Hydrograph.Pre-developed volume and flow are based•.n the 100-year storm event and site caracterlstics. Note the basin area is only ccounting for the area of the basin that we will be able to discharge from. BASIN CHARACTERISTICS BASIN AREA 000 acres OVERLAND'LOW LENGTH= 345.00 feet OVERLAND LOPE= 1.21% RUNOFF CO FFICIENT(C)= 0.10 , FLOW AND VOLUME CALOULATtON RESULTS OVERLAND IME OF CONCENTRATION • . - 100 YEARS •RM INTENSITY(i)= 31.4 min 1.57 INhr 100 YEAR Pa K FLOW(0)= 000 Ms NO DISCHARGE 100 YEAR VO UME(from SCS triangular Lend hydrograph)= - of sea TRIANOULAR UNIT HYOR00RAPR l �Vo&DEVELOPEo FLOW 09 OB O6 Z 05 e cc OJ 01 00 00 i00 000 00.0 400 500 rum 6s.5 tooev5 eco era II INTERMOUNTAIN ENGlF EERING 2507C Southside Blvd. Verraso Village Melba,Idaho 83841 (206)941-1245 (FAX)495-2469 Mandan,Idaho DATE 7/13/2015 _—._–_--_---_.--_—_—_–"_-- POST-DEVELOPED FLOW AND VOLUME CALCULATIOP Area 1 --- -------- – FILE: SECURITY PAGE flow or basin areas are also lcated using the Rational Method.The time of concent ati n la ba ed on a comb)atin offllot to street time,gutter time and applicable '— pipe.time prior to reaching the retention area.The lot time is calculated using Mar,ning's kinematic notch' (Overton and Meadows 1978).This equation Is also used for sheet flow of less than 300 feet he gutta time Is calculated using the travel length along the gutter and the gutta velocity at lb design slope. Pipe time Is calculated using the pipe travel length and an average pipe veloci calculated using manings formula. STORM RETURN PERIO =100 YEAR BASIN CHARACTERISTIC BASIN AREA 2 YEAR 24 HOUR RAINFALL(In)= 0.852 acres 1.20 In • OVER GRASS FLOW TO CURB 8 GUTTER LOT SLOPE- 100.00 feet MANNING'S q FOR GRASS= 0.01 FT/FT 0.24 VALLEY GU ER= GUTTER FL W LENGTH= GUTTER SL PE= 143.00 feet MANNING'S FOR CURB= 0.018 0'018 PIPE LENGT = PIPE DIAMET R= 24 N PIPE SLOPE 12 IN MANNING'S ri (w FOR PIPE= 0' 3 0.0113 AVERAGE PI E VELOCITY= RUNOFF CO FFICIENT(C)= 1.94 ec 0.64 (weighted) FLOW AND VOLUME CALCilLATION RESULTS , LOT TRAVEL TIME= 307 min. GUTTER TRAVEL TIME= PIPE TRAVEL IME= 2.5 min. 02 min. Method 1 Method 2 OTAL TIME uses Tc , 0 yr Tc 100 YEAR ST RM INTENSITYOF(I)=CONCENTRATION 33.4 min 1hr1080.00 min 1.50 liVhr 1.00 in/hr 100 YEAR P KFLOW(0)= 0.83 cfs 0.42 cfs 100 YEAR VO I ME(from SCS triangular unit hydrograph)= 1,883 of 2,017 cf acs TRIANGULAR UNIT HYDROORAPH a' svEtoerto naw e o.o eoo eras sss goo soo sos 70 TM(mini hero 9ne logo 1 1 I 1 INTERMOUNTAIN ENGINEERING 25/17C Southside Blvd. I Verraso Village Me'ba,Idaho 83841 (208)941-1245 (FAX)495-2469 Meridian,Idaho --- .—_— DATE 7/13/2015 DETENTION/RETURN V LUME CALCULATIONS Area 1 ------ •-__-___ -- FILE: Verraso PAGE The method calculates theIrequired detention volume by subtracting the calculated ` pro-developed volume hors1✓the post-developed SCS Triangular Unit Hydrograph.Then the volLme is increased by 15 percent to compensate for detention volume losses due to sed meet between maintenance periods. STORM RETURN PERIOC=100 YEAR UNIT HYDROGRAPH METHOD PRE-DEVE4:1PED SITE DISCHARGE= 0.00 cfs POST-DEVELOPED VOLUME= 2 017 cf (worst case design) (worst case design) SCE TRIANGULAR UNIT HYDROORApl4 —acmr.oE n_oprnrlov I as 1o ! 3 �as 0 0 250 30.0 450 50 e . aoo 2se eoa soo . .• . TINS 1.51ICC o DETENTION VOLUME REQUIRED= 15%VOLUME FOR SEDIMENT= 2017 cf TOTAL VOLUME REQUIRED= 231939 of of PONVOLUME CALCULATI [) IONS i Thep and volume calculation are based on the equasion s Also Included in this section are infiltration bed calculations.I filtration bed volume calculations are based on veld space in the drain rock and percdat on volume which occurs over the time base for the post-<eveloped SCS Triangu r Unit Hydrograph. If infiltration beds are not used,then only the pond bottom percolation is sidered. REQUIRED DETENTION= 1 2319 of I PONE VOLUME CALCULAT ON POND BOTTOM AREA= 0.00 sf POND WATER SURFACE AREA= POND TOP BK ELEV= 0.00 sf � POND WATE SURFACE ELEV= 0'00 R POND INVER1 ELEV= 0'00 R SEASONAL G OUND WATER= O.00 R I 2817.00 Testhde showed no water at 10 BELOW GROUND OND FREEBOARD= 000 R I VERT TO GROUND H2O= -2817.00 R OND DEPTH= 000)1 OND STORAGE= 0.00 of INFILTRATION BED CALCU TION INFILTRATION BED BOTTOM AREA= I - INFILTRATION ED DEPTH= 510'00 sf (entire bottom) - VOID SPACE I DRAIN ROCK= 7.400 ft PERCOLATIO RATE= 40% 8.00 in/hr VOLUME IN VOIDS= 1428.00 cf PERCOLATION VOLUME= 908 cf IFFILTRATION STORAGE= 2338 cf TOTAL DETAINED VOLUME= 2338 cf 5. 231 THEREFORE STORAGE ISCADEQUATE . IM-ERMOUNTAIN ENGIF EERING 25337C Southside Bbd. 1 Verreso Village Melba,Idaho 83641 (2L8)941-1245 (FAX)495-2469 Meridian,Idaho ---- DATE 7/13/2015 PRE-DEVELOPED FLO AND VOLUME CALCULATION:Area I --- — — -- FILE: SECURITY PAGE —_--`^ _---- TIME REQUIRED TO DIS'IPATE VOLUME TIME CALCULATION ASSUMES A DISCHARGE OFFSITE EQUAL TO THE CALCULATED PRE-DEVELOPED FLOW OF I CFS AND PERCOLATION OVER THE POND BOTTOM AREA 0.00 1 EQUAL TO B in./hr. TIME= 6.82 hours GUTTER FLOW CALCULATIONS POST-DEVELOPED RUNC4FF COEFFICIENT(C)= LOT TRAVEL TIME= 0.64 30.7 min f DROP INLET CAPACITIES: VERTICAL CURB= 3.25 cfs(depth at top of curb) ROLLED CURB= 3.15 cfs(depth al top of curb) Sub-Basin Areas for the different catch basins are calculated using the design drawings. Pipe sizing and hydraulic grade caculalions. Thele calculations employ the Manning Equation combined with flow entering the pipe.The hydraulic grade is based onbredetmnined flow and pipe size. Location AREA DATA SUfi-BASW SUB-BASINCURB GUTTER AVERAGE GUTTER GUTTER TOTAL CALCULATIONS <,RFA AREA TYPE LENGTH GUTTER TME CAPACITY TIME 2 100yr (V•R) R SLOPE min I Q I o 1.00 0.85 113 R °h Te Mohr ch InMr 0.40°.6 1.5 1.54 32.3 1.14 1.54 r 0.84 • 1 • INTERMOUNTAIN ENGII.EERING 25117C Southolde Blvd. Vemaso Village Melba,Idaho 83641 1 (208)941-1245 (FAX)495.2469 _-----`Medan•Idaho �`"— --- DATE 7/13/2015 SAND AND GREASE TRAfP CALCULATIONS Area 1 —" --PAGE -- _ FILE: SECURITY PAGE The sand and grease trap(t)were sized based on the post-developed flow draining to them The ---_-' thrcat width is calculated wlh this flow and a maximum velodty of 0.5 fps through the throat. SOD MENT/GREASE TRAP SIZING 1500 gal NUMBER OF TANKS - DISCHARGE`CFS) Use zero(0)1500 sag VELOCITY-MAXIMUM(FPS) 0.58 0.50 REQUIRED THROAT AREA(SF) #D1 SF) ><IVIG TANK SIZE I ( 1 5001 TANK WIDTH'(FT) 1,500 525 THROAT-WI(H(in) /DIV/01 VELOCITY-A TUAL(fps) BDIV/01 SO ENT/GREASE TRAP SIZING 1000 gal NUMBER OF TANKS 1 DISCHARGE FS) Use on.(1)1000 sag VELOCITY-M MUM(FPS) 0.40 REQUIRED ROAT AREA(SF) 050 TANK SIZE( 0 0.96 TANK DiH((FT) 1,000 MYTHTHROAT WIDTH On) 1.00 VELOCITY-ACI UAL(fps) /1 0.13 PIPE SIZING CALCULATIONS _ POS"-DEVELOPED RUNOFF COEFFICIENT(C)= 0.84 LOT TRAVEL TIME= 30. AVEFIAGE PIPE FLOW VELOCITY= 30.7 min 1.84 fUsec FLOWRATE CALCULATIONS La:atlan AREA DATA PIPE CONTRIB. ' CURB GUTTER GUTTER CALCULATIONS a AREA ( TYPE PIPE GUTTER PIPE TOTAL LENGTH SLOPE LENGTH TIME2 r RinTIME TIME AC (V,R) 8 R I O 1,-1 0.65 R 143 0.40% 24 1.1 min Tc In41f ch 02 320 1.08 0.44 PIPE SIZING CALCULATIOI r P-1 II IPE DIAMETER. IPE SLOPE 12 IN JJJTTT•••"ANNING'S N FOR PIPE. 0.0022 NR min. FLOWRATE 0.013 APICITY OF PIPE FLOWING FULL 0.44 ch 1.67 cfs PIPE SIZE IS ADEQUATE I . 1 I I 1 SII INTERMOUNTAIN ENGII,EERING 251.7C Southside Blvd. Verraso Village Melba,Idaho 83641 (201)941-1245 (FAX)495-2489 Meridian,Idaho DATE 7/13/2015 PRE-DEVELOPED FLOW FILE:AND VOLUME CALCULATION;Area 2 -- -------- __ E: VERRASO PAGE "------- The weighted runoff Coefficient for the developed site is calculated. --_ -- -- ------.--__._— C e RUNOFF COEFFICIENT(EXIBIT"B"Recommended"C"Coefficients for"Rational Method Equation'-Peak Rate of Discharge) Cu=UNIMPROVED AREA RUNOFF COEFFICIENT = 0.10 Cd=DEVELOPED SINGLE FAMILY RESIDENTIAL RUNOFF COEFFICIENT = 0.50 (or use calculated(weighted)value if higher) BLDG&PAVED ACRES(0.951 F LANDSCAPED ACRES(0.20) TOTAL ACRES —"-- ----- I 1.02 •(0.95)u 0.61 •(0.10) • . 1.63 '--"a 0.63 PRE-DEVELOPED FLOW.,ND VOLUME CALCULATIONS The Fre-developed now for tie project site and Ike upstream area from the site are calculated using the Rational Method.The 1' a of concentration Is based on overland flow to a point of chenneliaation and then the travel lime In th6 existing channel to the downstream end of the concerned area. The pre,developed volume 7 calculated using the SCS Triangular Unit Hydrograph.Pre-developed volume and flow are based on the 100-year storm event and site caracterisfics. Note the basin area is only amounting for the area of the basin that we will be able to discharge from. BASIN CHARACTERISTICS BASIN AREA 1.63 ones OVERLAND F OW LENGTH= 680.00 feet OVERLAND S OPE= 1.00% RUNOFF CO FFICIENT(C)= 0.10 i 2.00 FLOW AND VOLUME CALC��'I1LATION RESULTS OVERLAND TI c1E OF CONCENTRATION 100 YEAR ST RM INTENSITY(i)= 48.9 min 1 1.17 in/hr 100 YEAR PEAK FLOW(0)= 0.00 cls No discharge 100 YEAR VO UME(from SCS triangular unit hydrograph)= - c1 SCS lama u asEOE�Ee�reLCPy lamas ROM E 0.6 i an 8 0. . 'i 0.1 001 00 700 400 a<wry e00 1030 1700 600 ruo0 • • . INTERMOUNTAIN ENGINEERING 2587C Southside Blvd. Verraso Village Melba,Idaho 83841 I (2011)941-1245 (FAX)495-2489 Meridian.Idaho DATE 7/13/2015 POST•DEVELOPED FLOW AND VOLUME CALCULATION Area 2 _ FILE: SECURITY PAGE 4 .Posl-devdoped flow far the1basin areas are also calculated using the Rational Method.The —' time of concentration is based on a combination of lot to street time,gutter time and applicable pipe time prior to reaching the detention pond area. The lot time Is calculated using Manning's kinematic solution(Overton and Meadows 1978).This equation is also used for sheet flow of leas than 300 feel. he gutter time is calculated using the travel length along the gutter and the gutter veloc8y at thf design slope. Pipe time Is calculated using the pipe travel length and:m average pipe vetodt,calculated using manings formula. STORM RETURN PERIOD'. 100 YEAR BASIN CHARACTERISTICS BASIN AR 2 YEAR 24 H UR RAINFALL(in)= 1'83 1.20 in in LOT DISTAN E TO STREET= LOT SLOPE t0 CURB= 100.00 feet MANNING'S 4 FOR LOT= 0.01 FT/FT 0.24 CURB TYPE rob,vert)= ROLL GUTTER FLOW LENGTH= GUTTER SL(PE= 1050 feet MANNING'S FOR CURB= 0.054 0.01818 PIPE LENGT • 357 fed PIPE DIAMET R= PIPE SLOPE 12 IN MANNING'S n FOR PIPE= 0.0022 0.013 AVERAGE PI E VELOCITY= 1.94 ft/sec , RUNOFF CO FICIENT(C)= 0.83 (weighted) FLOW AND VOLUME CALC CATION RESULTS '' LOT TRAVEL{'IME. 30.7 min. '' GUTTER TRAVEL TIME= 2.8 min. PIPE TRAVEL'ME.. 3.1 min. Method 1 Method 2 OTAL TIME OF CONCENTRATION uses To iM.100 yr Tc 100 YEAR STARM INTENSITY(I)= 38.8 min 80.00 min in/hr 1.00 In/hr 100 YEAR PFLOW(q)c EA 1.44 cfs 1.03 efs 100 YEAR VOL ME(from SCS triangular unll hydrograph)= 4,229 of 4,950 M ' ---__fC$11tIANOULA,R UNIT HYOROORA►R f ra .._----.�.._..------._—._-- -oaer.oesoreo ROW ------------ A g 0 4111111111111111111111.1111.111111111.111 4'Aa A. '_--= a.O AMI ,11111. 40.0 __ KO floe Iw1M °0'0 10021 20 O ( 1 I INTERMOUNTAIN ENGINEERING 25117C Southside ONd. i Verraso Village Me ba.Idaho 83541 (209)941-1245 Meridian,Idaho (FAX)495-2469 '----------------__ __ _ DATE 7/13/2015 DETENTION/RETURN VOLUME CALCULATIONS Area 2 _ — ----- ---------- {( _ FILE VERRASO PAGE The method calculates the Fequked detention volume by subtracting the calculated pre-developed volume Rom}the post-developed SCS Triangular Unit Hydrograph.Then the volume is increased by 15 percent to compensate for detention volume losses due to sediment between maintenance periods. STORM RETURN PERIOD=100 YEAR UNIT HYDROGRAPH METHOD I PRE-DEVELOPED SITE DISCHARGE= 0.00 cfs POST-OEVELOPED VOLUME_ (worst case design) 4,950 of (worst case design) SCS TRIANGULAR UNIT HYDROGRAPH - 14 1 04 i 000]00 , )0.0 X00 \ c0.0 BOO ima i TMs 1.1dalo I DETENTION VOLUME REQUIRED= 4950 cf 15%VOLUME FOR SEDIMENT= 743 cf • TOTAL VOLUME REQUIRED= 5693 cf PON()VOLUME CALCULAT)ONS The pond volume calculationare based on the equasion s Also included in this section are infikration bed calculations.I filtration bed volume calculations are based on void space in the drain rock and percolation volume which occurs over the time base for the post-c eveloped SCS Triangular Unit Hydrograph. If infiltration beds are not used,then only the pond bottom percolation is co tsidered. REOL IRED DETENTION= i 5693 cf PONC VOLUME CALCULAT N POND BOTTO AREA= 0.00 sf . . POND WATE SURFACE AREA= 0.00 sf POND TOP B K ELEV= 0.00 1t POND WATER SURFACE ELEV= 000 R POND INVERTT��ELEV= 0ft 00 SEASONAL GFOUND WATER= 2617.00 OND FREEBOARD= 0.00 R INVERT TO GROUND H20= -2817.00 ft POND DEPTH= 000 R POND STORAGE=Vol=h/31(a*A+SQRT(a'A)) 0.00 cf INFILTRATION BED CALcutIATION INFILTRATIONIBED WIDTH= 7.00 R INFILTRATION ED LENGTH= 19000 ft INFILTRATION�ED BOTTOM AREA= 1330.00 s1 INFILTRATION ED DEPTH= (entire bottom) 8.00 R VOID SPACE IN DRAIN ROCK= PERCOLATION RATE= 40% 8.00 in/hr Table 3 4LUME IN VOIDS= 4256.00 cf PERCOLATION VOLUME= 1443 of I INFILTRATION STORAGE= 5699 of I I TOTAL DETAINED VOLUME= 5699 cf I I s 5693 of(required) THEREFORE STORAGE IS ADEQUATE .I 1 1 1 1 1 I 1 1 1 • I INTERMOUNTAIN ENGINEERING Verraso Village 2587C Southside Blvd. Melba,Idaho 83641 Meridian,Idaho (201)941-1245 (FAX)495-2469 -_�_-_ DATE 7113/2015 . PRE-DEVELOPED FLOW AND VOLUME CALCULATION:Area 2 FILE: VERRASO PAGE ---_ Imo___-__ ----- .--_--_--__._ TIMIE REQUIRED TO DISSIIPATE VOLUME I TIME CALCULATION ASSUMES A DISCHARGE OFFSITE I EQUAL TO THE CALCULATED PRE-DEVELOPED FLOW OF 0,00 CFS AND PERCOLATION OVER THE POND BOTTOM AREA EQUAL TO 2 in./hr. f TIME= 6.42 hours I i GUTTER FLOW CALCULATIONS POST-DEVELOPED RUNG rF COEFFICIENT(C)= 0.63 LOT TRAVEL TIME= I 30.7 min I DROP INLETICAPACITIES: VERTICAL CURB= 4.26 cfs(depth at top of curb) 1 ROLLED CURB= 3.15 cfs(depth at top o4 curb) I . • Sob-l3asih Areas for the diff Irml catch basins are calculated using the design drawings. Pipe sizing and hydraulic grade caculatlons. These calculations employ the Manning Equation combined with flow entering the pipe.The hydraulic grade Is based on itredelermined flow and pipe size. Lavation III AREA DATA CALCULATIONS SUB•BASIN SUB-BASIN I CURB GUTTER AVERAGE GUTTER GUTTER TOTAL 25yr 100yr AREA AREA .I TYPE LENGTH GUTTER TIME CAPACITY TIME 1 Q I 0 'Esic Nft.B) SLOPE min oft Tc lulu cfsinlhr cfs CB-3 0.23R 59 0.72% 0.5 2.08 31.2 1.17 0.17 157 022 C13-4 0.25,, R 80 0.40.4 0.6' 1.80 31.3 1.17 0.18 1.57 0.25 (8-5 0.25 1 R 61 0.40% 0.8 1.10 31.3 1.17 0.19 1.57 0.25 CB-6 0.25 I R 58 0.40% 0.5' 1.80 31.3 1.17 0.18 1.57 0.25 C B-7 0.15 I R 58 0.67% 0.6 2.03 31.2 1.17 0.11 157 0.15 C B-2 0.51 I R 159 0.50% 1.38 1.89 32.1 1.15 0.37 1.54 0.49 I 1 I 1 I I 1 ( 1 .1 it INTERMOUNTAIN ENGINEERING Verraso Village 2597C Southside Blvd. Meba,Idaho 83641Meridian,Idaho (208)941-1245 I(FAX)495-2489 DATE 711312015 SAND AND GREASE TRAP CALCULATIONS Area 2 FILE: VERRASO PAGE The sand and pease traps Lre sized based on the post-developed flow draining to them.The throat width is calculated with this flow and a maximum velocity of 0.5 fps through the throat. SE IMENT(GREASE TRAP SIZING-P.2 NUMBER OF KS - Us*owe(0)1500 sag DISCHARGE(FS) 1.20 VELOCITY-M IMUM(FPS) 0.50 REQUIRED TH OAT AREA(SF) *DIV/01 TANK SIZE(tot 1,500 TANK WIDTH( 5.25 THROAT-WID (In) #DIV/01 VELOCITY-A UAL(fps) #DIV/01 S DIMENT/GREASE TRAP SIZING NUMBER OF TANKS 1 Usa one(1)1000 sag DISCHARGE((IFS) 120 VELOCITY-MAXIMUM(FPS) 0.50 REQUIRED THROAT AREA(SF) 240 TANK SIZE(9a 1,000 TANK WIDTH( ) 4.00 THROAT-W1OT {) 11 VELOCITY-ACL(fps) 0.33 { PIPE SIZING CALCULATIONS POST-DEVELOPED RUNOFF COEFFICIENT(C)= 063 LOT TRAVEL TIME= 30.7 min AVERAGE PIPE FLOW VELOCITY= 1.94 ft/sec FLOINRATE CALCULATIONa LccatIon 11 AREA DATA CALCULATIONS PIPE CONTRIB. CURB GUTTER GUTTER PIPE GUTTER PIPE TOTAL 25yr i AREA TYPE LENGTH SLOPE LENGTH TIME TIME TIME I Q ac (V,R) n It It min min Tc Inmr cfs P-1 1.63 V 159 0.50% 357 0.6 3.1 34.6 1.00 1.03 PIPE SIZING CALCULATIOIII PI PI IPE DIAMETER• 12 IN PLLIPE SLOPE 0.0022 N6 MANNMG'S N FOR PIPE. 0.013 �FJ++LOWRATE 1.03 ch APICITY OF PIPE FLOWING FULL 1.07 PIPE SIZE IS ADEQUATE •