Loading...
HomeMy WebLinkAboutPapa Murphy's Drainage Calculations "DEERING Fir it &rr DRAINAGE CALCULATIONS FOR PAPA MURPHY'S LOT 12 BLOCK 2 JACKS PLACE SUBDIVISION PREPARED BY CK ENGINEERING, P.C. CHAD S. KINKELA, P.E. 9q1 �r471 z7f/ OV) 40 S. ENGiNEERLN .C Papa Murphy's on Lot 12 Block 2 Jacks Place Subdivision narrative for storm drain system. The building and all hardscape for the Papa Murphy's site plus 25 feet of the future asphalt for lot 11 Block 2 have been accounted for in the drainage calculations. The future building on lot 11 block 2 will need to handle the run-off from the building. The parking lot drainage has been accounted for in the design of this Papa Murphy's site. The seepage bed has been sized to treat the 100 year storm event. All other surfaces such as landscape area have been assumed to be self-contained and will not contribute to the seepage trench. A 350 gallon sand and grease trap has been sized to handle the Q1oo flow and keep the flow over the baffle below 0.50 cubic feet per second. No groundwater was encountered during construction of the other storm drain systems on this site. Groundwater will not be an issue or encountered during construction of this system. CK Engineering 130o E.State St Suite 102 Eagle,ID 83616 208.869.0590 mobile chad@ck-engineers.com June 29, 2015 PROJECT: Papa Murphy's Lot 12 Block 2 Assumptions for calculations: Intensity25= 1.4 in/hr for 1-hour storm w/Tc=22.5 minutes Intensity100= 1.9 in/hr for 1-hour storm w/Tc=22.5 minutes C = 0.90 for commercial pad 100-year Peak Flow= C * I *A ft3/sec Runoff Volume = Area of Hydrograph (0.5*Base*Height) = 0.5 * 1 hr storm(3600sec) * (Peak Flow) Drainage CB 100-yr 25-yr Runoff Area (ft2) C-value Flow(cfs) Flow(cfs) Volume Drain Area#1 7966 0.90 0.31 0.15 563 Seepage Trench#1 Drainage Area = 7966 ft2 Runoff Volume = 563 ft3 15% Sediment Storage = 76 ft3 Storage Volume Required = 639 ft3 Void Ratio = 40 Percolation Rate = 8 in/hr Trench Width = 8 ft Trench Depth = 6 ft Storage/ft= Void Ratio * Depth -1 *Width 16 ft2 Sidewall Perc/ft= Depth-1 *2/3 *2sides * Perc Rate 4.4 ft2 Endwall Perc= Sidewall Perc*Width = 35.6 ft3 Length Required - Storage Volume- Endwall Perc Storage/ft+ Sidewall Perc/ft = 30 ft Percolation Rate= 8 in/hr 90% Infiltration Time = 90% Storage Volume Trench Perc Rate*Trench Area 3.7 hours Sand & Grease Trap#1 Size = DB 350 gallon Baffle Separation = 7 in Inside Width = 42 in Throat Area = Baffle *Width = 2.041666667 ft2 Velocity= (C value * Intensity* Drainage Area)/Throat Area = 0.15 ft/sec CK ENGINEERING, P.C. • W t1 ER ZIX E o ems--' z Qoolo0LLJ Vli 4k )4 -$1.9 Q o w O - -r<. d 0 joilV ULo o , // I I o v o 0 7I \ .I � a 1] C o cn 4;6 Z j Is �� z Q I l ( I /� 4 I W( o C) o EL c a I -I/ I (I, °_,--- /I I I I I a 1� I I----- -� _ I I iv1 I ¢� �:i i----� o o i �� z I , CC -- I CO El 0 �� 0 1 \44... C3 I ' 1 Q 0