Loading...
HomeMy WebLinkAboutCentral District Health CommentCENTRAL ~~ DISTRICT °IrHEALTH DEPARTMENT CENTRAL DISTRICT HEALTH DEPARTMENT Return to: Environmental Health Division~,~C,E~~~® ^ Boise '~` '.~ ~ ^ Ea le Rezone # Conditional Use # Preliminary /Final /Short Plat ~~ 0~ -~ y~ l_ ,.~,~ ~ , ~~ g ^ Garden City ~pQeridian ^ Kuna ^ ACZ ^ Star ^ 1. We have No Objections to this Proposal. ^ 2. We recommend Denial of this Proposal. ^ 3. Specific knowledge as to the exact type of use must be provided before we can comment on this Proposal. ^ 4. We will require more data concerning soil conditions on this Proposal before we can comment. ^ 5. Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of: ^ high seasonal ground water ^ waste flow characteristics ^ or bedrock from original grade ^ other ^ 6. This office will require a study to assess the impact of nutrients and pathogens to receiving ground waters and/or surface waters. ^ 7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and water availability. 8. After written approval from appropriate entities are submitted, we can approve this proposal for: ~eentral sewage ^ community sewage system ^ community water well ^ interim sewage J~sentral water ^ individual sewage ^ individual water ~9~ The following plan(s) must be submitted to and approved by the Idaho Department of Health & Welfare, Division of Environmental Quality: ~eentral sewage ^ community sewage system ^ community water ^ sewage dry lines ~tral water Run-off is not to create a mosquito breeding problem. ^ 11. This Department would recommend deferral until high seasonal ground water can be determined if other considerations indicate approval. ^ 12. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State Sewage Regulations. ^ 13. We will require plans be submitted for a plan review for any: ^ food establishment ^ swimming pools or spas ^ beverage establishment ^ grocery store ^ 15. Please see attached stormwater management recommendatations ^ child care center Date: (~ l/~~/ ley Reviewed By: ~~iGN 2~1 Review Sheet COHO srao iko CENTRAL • DISTRICT ~~1'HEALTH DEPARTMENT MAIN OFFICE • 707 N. ARMSTRONG PL • BOISE, ID 83704-0825 • (208) 375-5211 • fAR 327-8500 Ta prevent and treat disease and disability; to promote kealtAy lifestyles; and to protect and promore the kealeh and qualtry of our environment. STORM WATER MA~TAGEME~TT 1tECOiVIMEi~TDATIO~iS It is recommended-that storm water bepre-treated prior to discharge to the subsurface to prevent impact to ground water and*surface water quality. -The engineers and architects involved with the design of this project should obtain current best management practices forstorm water disposal and design a storm water management system that is preventing groundwater and sut'face water degradation. Manuals that~could be u~d forguidance are: State of Idaho Catalog of Stormwater hest Management Practices For Idaho Cities and Counties. Prepared by the Idaho Department of~nvironmental Quality, July 1997. Stormwater Best Management Practices Guideboork Prepazed by City of Boise Public Works Department,lVIay 2000. and Ada Counties $(more Boise Valley Servin ...,,,•,ow, , , , g Ada J Boise County Office Elmore County Office Valley County Offce 707 N. AnnsWrg PI. 520 f. 8th St, North 703 N. ist St. Boise. ID 83704 Mountain Home, ID 83647 P.0. Sox 1448 fndro. Health: 327-7499 EnNro. Health: 587-9225 McCall, ID 83638 Family Planning: 327-7400 family Health: 587-4407 Ph. 634-7194 Immunizations: 327-7450 WIC: 5874409 fAR: 634-2774 Senior Nutridon: 327-7460 FAR: 587-3527 wla 327a4ae FAK: 327-awD