Loading...
HomeMy WebLinkAboutLetter from Dave M. 7/1/0407i01i2004 18:10 FA% 2088888854 MERIDIAN PB:Z DEPT. ~ Clty Clerk @J 001 - .~ ~ ~~~ . EngYtneers, Inc. TO: Craig hood ~;~ ~ ~ I~~j Planner, City of Meridian • 660 E Watenower, Suite 200 JUL 0 :1 2004 Meridian, Idaho 83642 • ~ City Of Meridian ' "DATE; June 24, 2004 City Clerk Office Rk:' Mussell Corner Subdivision and Planned Development Applicatiots . Dear Craig, ~ ~ :. '. . Thank you for meeting with us earlier today to discuss the Mussell Comer PFP and PD applications with Fsic Peterson of Cole Poe Architects and Brafl Hawkins-Clazk of your office, We have revised the plat, landscape plan'and site plan in ,accordance with the ACHD deeds that were recorded in 1999, which resulted in ACRD; acquiring 48 feet of right-of--way measured from the centerline of Victory Road. ` Fortunately, t~CHD. does not intend to cbnstnlct Victory Road as a major arterial. roadway aad only 70 ft, of right-of-way is required for the build-out of the road (instead of 96 feet of right-of--way). ACRD is onl}~ requiring the consuvction ~of half of a 46-foot . street section within the existing '48' right-of-way, consequently there is room for landscaping to be constructed within ACHD's 'right-oF way behind the detached sidewalk and between the curb and std@walk along Victory.As wE discussed with Lori Den-Henbg from ACHD, a license agreement will be required for the landscaping within tberight-of- way, and the vegetation may be limited to groundcover with no,trees. Without this landscaping the land in•front of the existing buildings would not be able to be landscaped'' or else the parking would have to • be eliminated.• The landscaping within ACf1;D's property will come close to providing the minimum required landscaping buffer in front of the existing buildings adjacent to Victory. The "pond"'amenity, or the existing pond will be left in its current state within the nursery for the time being. As the propeity're-develops the pond will be retained and protected as an amenity and will be incorporated into fiitun: development. After our meeting I stopped by Joe Silva's office to discuss the need for a turnaround that , maybe required because of the ACHD requirement to close one of the access points along Victory Road. Joe. stated that if we can connect the .proposed gas station to the existing commercial use in a manner that would provide a secorida[y route of access in and out, ~a new turnaround would not be required.. We have', revised to plat to accommodate the additional cross access. 12552 W. EX£CUTIVL• DRIVE, SUITE B • BOISE, IDA[-!O 83713 • (208) 887-77G0 • FAX (208) 587-7781 JUL 01 '04 18 30 2088886854 PRGE.01 07/01/2004 18:11 FA7l 2088886854. bfERIDIAN P&Z DEPT. .+.City Clerk ~ 002 The revised plat still indicates the use o£ the ntirthemmiost existing access to SH=69 skis - access is used by ~NMID £or ditch maintenaacc and by the existing retail stone business (a - parr of Victory Greens). The proposed subdivision does not yet include the development of a Irontage/backage road to the existing access. We ask that we be allowed to continue - - touse the access,. ut additionto the new access located in the midpoint of the subdivision, until northernmost got of the subdivision is re-developed..: . • , if you have any questions please feel free to- contact me here at 887-7960 or via e-mail at, davem(a~ninnaelc-en~incers.com. . ' - Sincerely ~ • ~. Dave McIfir:non .. .: , . ; - - :. ,. .::. _ .. _- , _ ., ~-.. .: - Land Use Planner ~ - Cc -File # C036402 . . • '~ JUL 01 '04 18:30 2088886854 PRGE.02