Loading...
HomeMy WebLinkAboutChange Order No. 1 to Task Order 10033.A with Granite Excavation for Ashford Greens Trunk SewerCITY OF MERIDIAN 33 EAST BROADWAY MERIDIAN, ID 83642 CONTRACT CHANGE ORDER CHANGE ORDER NO. 1 PROJECT NO. 10033,A DATE; 3/24/2016 EFFECTIVE DATE: 3/24/2016 CONTRACTOR; GRANITE EXCAVATION PROJECT; ASHFORD GREENS TRUNK SEWER The Contractor is hereby directed to make the following changes from the Contract Documents and Plans. Description: REMOVAL AND REPLACEMENT OF BACKFILL MATERIAL ON FIRST 600' OF TRENCH ON NORTH END OF PROJECT. ADDITIONAL PIT RUN, GEOGRID AND FABRIC FOR THE ROADWAY SECTION FOR STABILITY. Reason for Change Order: NATIVE BACKFILL MATERIAL LIES IN HIGH GROUNDWATER AND IS DIFFICULT TO REACH COMPACTION PER SPECIFICATION. AN ADDITION OF 22 INCHES OF PIT RUN MATERIAL IS BEING INCLUDED IN THE ROADWAY SECTION FOR A TOTAL DEPTH OF 48 INCHES FOR A WIDTH OF 24 FEET AND A LENGTH OF 1750 FEET. A LAYER OF FABRIC AND GEOGRID IS ALSO BEING ADDED BETWEEN THE BOUNDARY LAYER BETWEEN THE NATIVE BACKFILL AND ROADWAY SECTION. THIS MODIFIED ROADWAY SECTION WILL REDUCE THE CHANCE FOR DIFFERENTIAL SETTLEMENT OF THE ROADWAY AROUND THE UTILITIES. Attachments: Granite Excavation CO#1 CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price $ $ 1,073,850.56 Original Contract Times; 140 Net changes form previous Change Orders Net changes form previous Change Orders No._ to _ No._ to _ (calendar days) $ - 0 Contract Price Prior to this Change Order: Contract Times prior to this Change Order: (calendar days) $ 1,073,850.56 140 Net Increase (decrease) of this Change Order: Net Increase (decrease) of this Change Order: (calendar days) $ 143,642.87 15 Contract Price with all Approved Change Orders: Contract Times with all Approved Change Orders; (calendar days) $ 1,217,493.43 155 APPROVED: (CITY PURCHASING AGENT) ACCEPTED: (Contractor By; Keith Watts Date; Date: Z ? 2 RECOMMEND D: (Engineering Manaer) f�By; Warr Stewart Date: '-ci,-;eade, iib W, '— Dig-ghS `I"his ISIY.4ill C:.S.*: 23 Warm Lake Hwy, Cascade, ID 83611 (208) 382-4188 Change Order #1 To: CITY OF MERIDIAN From: Granite Excavation, Inc. Public Works License Number: PWC -C -16558 -Unlimited -2-4 Date: 3/21/2016 Project Name: Ashford Greens Trunk Sewer - C01 Key # Project # Prepared by: Dusty Hibbard Attn.: GARRICK NELSON Item No. Item Description 1 Excavate and replace existing soils at 8" Lifts (600' length x 20' width) (PER NEGOTIATED PRICE) 2 Install 1 Layer of T160 Grid (3 foot overlap) 3 T160 Grid Material including Tax - 1 Layer (3 foot overlap) 4 Install 8 Oz Fabric (1 Layer) 5 8 Oz Fabric Material including Tax - 1 Layer 6 22" of Pitrun including Excavation - 1729 Feet Quantity Unit Unit Price Total Price 1733 SY $7.41 $12,841.53 4200 SY $1.60 $6,709.20 4200 SY $5.20 $21,840.00 4200 SY $0.58 $2,436.00 4200 SY $1.27 $5,334.00 2851 CY $33.14 $94,482.14 TOTAL: $143,642.87 Chancre f)rrlar Nntar' Total Contract Price before this Change Order: Change Order Amount: Total Contract Price to date including this Change Order: $0.00 Total Contract Days before this Change Order: Total Contract Days added or Subtracted due to this Change Order: Total Contract Days including this Change Order: 0 Accepted: mhe above prices, specifications and conditions are satisfactory and are herel Confirmed 0lGranite Excavation, Inc.Authorized Signatu City Of Meridian Detailed Statement of Revenues and Expenditures - Rev and Exp Report - Keith - Unposted Transactions Included In Report 3590 - WW Construction Projects 60 - Enterprise Fund From 10/1/2015 Through 9/30/2016 Date: 4/13/16 03:16:26 PM Page: 1 Capital outlay 93505 Sewer Line Extensions 0596 Black Cat Pressure Sewer 0596.a South Black Cat Pressure Amendments Sewer Commissioning Design 0596.b South Black Cat Pressure Sewer Commissioning - Construction 10033 Ashford Greens Sewer 645,442.79 Pipeline 10033.a Ashford Greens Trunk Sewer 157,409.12 - Construction 10033.b Ashford Greens Trunk Sewer (5,070.00) - Special Inspections 10033.d Ashford Greens Trunk Sewer (37,114.32) - Design 10369 Franklin and Black Cat 1,384,721.50 Intersection Water 0.00 Improvements 10369.b Franklin - Black Cat to 0.00 Ten Mile Sewer and Water (15,089.50) Improvement 10374a ACHD Ten Mile Road -Cherry (24,202.71) to Ustick Utility 5,000.00 Imprvmnts-Constr 10432 ACHD Ustick Meridian Rd 0.00 Utility Improvements 10575.a ACHD Linder Road Franklin 4,557.25 Road to RR Tracks - Design (15,430.00) & Const 10614 Black Cat Trunk Sewer -. 2,347.00 Phase 5 10614.a Black Cat Trunk Sewer - (8,042.00) Phase 5 - Design 250,000.00 Total Capital Outlay 250,000.00 TOTAL EXPENDITURES Date: 4/13/16 03:16:26 PM Page: 1 Percent of Budget with Current Year Budget Budget Amendments Actual Remaining Remaining 645,442.79 0.00 645,442.79 100.009, 157,409.12 0.00 157,409.12 100.00% 0.00 5,070.00 (5,070.00) 0.0016 0.00 37,114.32 (37,114.32) 0.00% 1,385,000.00 278.50 1,384,721.50 99.981 0.00 1,073,911.76 (1,073,911.76) 0.00% 0.00 15,089.50 (15,089.50) 0.00% 0.00 24,202.71 (24,202.71) 0.009.1- .00%5,000.00 5,000.00 0.00 5,000.00 100.00% 0.00 1,956.78 (1,956.78) 0.009- .00%4,557.25 4,557.25 19,987.25 (15,430.00) (338.58)9, 9,000.00 6,653.00 2,347.00 26.089- 6.08%0.00 0.00 8,042.00 (8,042.00) 0.009- .00%250,000.00 250,000.00 0.00 250,000.00 100.00% 0.00 214,747.00 (214,747.00) 0.00% 2,456,409.16 1,407,052.82 1,049,356.34 42.721-. 2,456,409.16 1,407,052.82 1,049,356.34 42.72% Date: 4/13/16 03:16:26 PM Page: 1