Loading...
HomeMy WebLinkAboutTask Order 10680.A with Advanced Control Systems for SCADA System UpgradesTASK ORDER NO. 10680.a Pursuant to the MASTER AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN CITY OF MERIDIAN (OWNER) AND Advanced Control Systems (ENGINEER) This Task Order is made this 5th day of April, 2016 and entered into by and between the City of Meridian, a municipal corporation organized under the laws of the State of Idaho, hereinafter referred to as "City", and accepted by (ADVANCED CONTROL SYSTEMS), hereinafter referred to as "Engineer" pursuant to the mutual promises, covenant and conditions contained in the Master Agreement (Category 7a) between the above mentioned parties dated September 24th, 2015. The Project Name for this Task Order 10680.a is as follows: CITY OF MERIDIAN SCADA System Upgrades PRV's 2, 6, 10, 14, 23 & 26 SCOPE OF WORK Our scope is to provide design, bidding and construction management services to replace the existing SCADA PACK PLC's and move controls above grade at the following sites; PRV 2, 6, 10, 14, 23 & 26. Sites 23 & 26 have 2 valves in each. All other sites have one valve each. The control panel will be designed to utilize existing instrumentation and provide spare 1/0 for future use. Our scope also includes programming services to include start-up of the new control panel and associated instruments. Task 1 - Design Services • Perform site surveys to identify unique site requirements • Perform design to include earthwork, excavation, direct bury conduit, grounding installation, auger boring, conduit installation, concrete foundations, elevations, piping, instrumentation, electrical distribution and controls schedules • Provide drawings suitable for construction • Provide bid documents (specifications as needed) • Communicate with Idaho Power to schedule electrical service and metering installation • Collaborate with ACHD in adherence to site traffic management, right of way issues and meeting erosion sediment control study requirements • Provide construction plans to ACHD • Contact HOAs where applicable to be included in discussions and decisions regarding PRV site aesthetics and construction impacts Task Order 10680.a Controls Design and Programming — PRV 2, 6, 10, 14, 23 & 26 control system upgrades Page 1 of 4 Advanced Control Systems Deliverables • 90% review documents • 100% Construction documents incorporating review comments Task 2 - Bidding Services • Create bid schedule • Attend kickoff meetings • Answer bidding questions Deliverables • Bid schedule Task 3 — Construction Support Services • Review submittals for control panel hardware • Review submittals for instrumentation Collaborate with the City in adherence to meet confined space construction requirements Coordinate with Idaho Power during installation of electrical service and metering Perform factory acceptance testing and start-up for PRV 2, 6, 10, 14, 23 & 26 control panels Deliverables • Submittal review Task 4 - Programming Services • Program PLC and HMI and provide onsite start-up for PRV 2, 6, 10, 14, 23 & 26 • Program MDS radio and provide onsite start-up for PRV 2, 6, 10, 14, 23 & 26 Deliverables • Electronic copies of the PLC and HMI programs that are created and modified during the project • One electronic and three 3 -ring bound hardcopies of operations and maintenance manuals • One electronic and three hardcopies of final as -built drawings ASSUMPTIONS While preparing our scope of services and fee estimate, we have made the following assumptions: • All site earthwork, excavation, direct bury conduit, grounding installation, auger boring, conduit installation, concrete foundations, elevations, piping, instrumentation, electrical distribution and controls with installation of new SCADA control panel, power quality monitoring panel, and all instrumentation will be complete before ACS integrator is called out to verify 1/0 loop checks and deploy programming. Task Order 10680.a Controls Design and Programming — PRV 2, 6, 10, 14, 23 & 26 control system upgrades Page 2 of 4 Advanced Control Systems • The remote site communication will utilize the GE MDS 900Mhz radio network. • On Site verification by radio path study has been performed. TIME OF COMPLETION and COMPENSATION SCHEDULE The following schedule is based on a Notice to Proceed (NTP) from the City by March 23, 2016 and resulting in Final Design Documents completed June 30, 2016 and Final Programming completed by September 30, 2016. A NTP issued on a different date will change the schedule accordingly. COMPENSATION AND COMPLETION SCHEDULE Task Description Due Date Compensation 1 Design Services ■ 5/31/2016 $46,932.00 2 Bid Services ■ 6/15/2016 $1,540.00 3 Construction Support Services ■ 7/29/2016 $7,040.00 3 Programming Services ■ 9/30/2016 $20,968.00 TASK ORDER TOTAL $76,480.00 The Not -To -Exceed amount to complete all services listed above for this Task Order No. 10615.a is seventy-six thousand, four hundred and eighty dollars ($76,480.00). No compensation will be paid over the Not -to -Exceed amount without prior written approval by the City in the form of a Change Order. Travel and meals are excluded from this Task Order unless explicitly listed in the Scope of Services AND Payment Schedule. CITY OF MERIDIAN TAMMY •_•D O• Dated: `"l -'s " I � Approved by Council EE , CITY CL Task Order 10680.a Controls Design and Advanced Control Systems Advanced Control Systems BY: ST T OMSEN, -OVVNER Dated: r '? j3 fT CI fV y mining'- f' 2 6,' 10, 14, 23 & 26 control system upgrades Page 3 of 4 Purchasing Approval BY: KEIT TTS, urchasing Manager City Project Manager DEAN STACEY S 4 Publicorks apartment Approval BY: WARREN ST WART, Engineering Manager Dated: -'34-2/1 Task Order 10680.a Controls Design and Programming — PRV 2, 6, 10, 14, 23 & 26 control system upgrades Page 4 of 4 Advanced Control Systems