HomeMy WebLinkAboutTask Order 10044.b MTI Headworks Building - Geotechnical ServicesTASK ORDER NO. 10044.8
Pursuant to the
MASTER AGREEMENT FOR PROFESSIONAL SERVICES
BETWEEN
CITY OF MERIDIAN (OWNER) AND MATERIALS TESTING & INSPECTION
(ENGINEER)
This Task Order is made this day of October, 2015 and entered into by and
between the City of Meridian, a municipal corporation organized under the laws of the
State of Idaho, hereinafter referred to as "City", and accepted by (MATERIALS
TESTING & INSPECTION), hereinafter referred to as "Engineer" pursuant to the mutual
promises, covenant and conditions contained in the Master Agreement (Category 4A)
between the above mentioned parties dated October 1, 2014. The Project Name for
this Task Order 1234 is as follows:
CITY OF MERIDIAN
HEADWORKS BUILDING - GEOTECHNICAL
INVESTIGATIONS
PROJECT UNDERSTANDING
Materials Testing and Inspections will provide geotechnical investigations and
recommendations for this project..
SCOPE OF WORK
The subsurface investigation will be conducted to provide information needed in the site
development and design of the proposed project. The project is expected to consist of
construction of a new headworks facility for the waste water treatment plant. Revisions
may be required based on final design requirements.
In accordance with your request our proposed subsurface exploration will include the
following services:
• As requested by CH2M Hill, two (2) borings will be advanced to depths of 40 feet.
The borings will be located on the east and west sides of the proposed building
location. All data obtained will be recorded in the field and referenced to boring
Task Order 10044.B Headworks Building - Geotechnical Investigations Page 1 of 3
MATERIALS TESTING & INSPECTION
number. Soil will be classified in the field logs in accordance with applicable ASTM
standards and other standards, including, but not limited to, ASTM standard D2488.
The classification for final logs will be based on field information, results of laboratory
tests, and further inspection of samples in the laboratory. A chart illustrating the soil
classification criteria and the terminology and symbols used on the logs will be
provided.
• ASTM standards or other recognized standard sampling and test methods used will
be identified.
• A plot plan giving approximate locations of borings will be provided.
• Start and finish dates, soil horizon description and thickness, and, where applicable,
groundwater data and subsurface profile of rock will be provided. Location of strata
containing organic materials, wet materials, or other inconsistencies that might affect
engineering conclusions will be noted.
• A description of the existing surface conditions and a summary of the subsurface
conditions will be provided.
• All laboratory determinations of soil properties will be reported.
Exploration and recommendations will be prepared under the supervision of a
registered professional engineer and registered professional geologist. A geologist,
engineer, or qualified soils technician will perform all fieldwork. Digline services will be
contacted to locate peripheral utility lines. The owner or owner's representative will be
responsible for mark -out or identification of private utilities (lighting power, irrigation
lines, etc.). MTI will not begin exploration until released by the client — signifying mark -
out or identification has been completed. MTI cannot be held responsible for the cost of
replacement of utilities. Borings will be backfilled at completion of our exploration.
Surfaces will be left in a rough but relatively level condition. Costs can be determined,
at this time, for additional dressing if required.
TIME OF COMPLETION and COMPENSATION SCHEDULE
The following schedule is based on a Notice to Proceed (NTP) from the City by October
2015 and resulting in Final Services being completed by November 2015. A NTP
issued on a different date will change the schedule accordingly.
Task Order 10044.6 Headworks Building - Geotechnical Investigations Page 2 of 3
MATERIALS TESTING & INSPECTION
COMPENSATION AND COMPLETION SCHEDULE
Task
Description
Due Date
Compensation
1
Geotechnical Investigation Services
■ November 27, 2015
$1,280
2
Laboratory Services
■ November 27, 2015
$630
3
Soil Sampling via Boring
■ November 27, 2015
$21358
4
Miscellaneous Services
■ November 27, 2015
$132.50
TASK ORDER TOTAL: $4,400.50
Task Order 10044.6 Headworks Building - Geotechnical Investigations Page 2 of 3
MATERIALS TESTING & INSPECTION
The Not -To -Exceed amount to complete all services listed above for this Task Order
No. 10044.6 is four thousand four hundred and 50/100 dollars ($4,400.50). No
compensation will be paid over the Not -to -Exceed amount without prior written approval
by the City in the form of a Change Order. Any and all travel will only be reimbursed if
pre -approved by the Project Manager, and only per the City of Meridian Travel Policy.
Reimbursable expenses will be paid at cost and only if pre -approved by the Project
Manager. Any travel and/or reimbursables paid will be paid as part of the Not -To -
Exceed Task Order Total per the Compensation and Completion Schedule above.
CITY OF MERIDIAN
BY: ",�1jiZze lil"A
KEIT ATTS, Purchasing Manager
Dated: ' `
Department Approval
BY:
r
CLINT DOLSBY, Asst. City EI gineer
City Project Manager
Emily Skoro
MATERIALS T TING & INSPECTION
BY.
YP
Dated: �i�%•�'
Task Order 10044.13 Headworks Building - Geotechnical Investigations Page 3 of 3
MATERIALS TESTING & INSPECTION