HomeMy WebLinkAboutContract Amendment No 3 ClimaTech HVAC MAINTENANCE CITYWIDE FY16CVERtITU
CITY OF MERIDIAN
CONTRACT AMENDMENT No. 3
HVAC SYSTEM PREVENTATIVE MAINTENANCE — CITYWIDE FACILITIES
Cllma-Tech Corporation
CONTRACTOR NAME:
DEPARTMENT NAME:
Clima-Tech Corp
Public Works
ADDRESS:
ADDRESS:
875 McGregor Ct., Ste 180
33 E. Broadway
Boise, ID 83705
Meridian, ID 83642
CURRENT CONTRACT INFORMATION:
Contract Name: HVAC System Preventative Maintenance and Inspection— CitvWide Facilities
Previous Amendment Date: 12-1-2014 Previous Amendments: 2
Current Contract Dates: START: 10-1-2014 COMPLETION: 09-30-2015
Current Contract Amount (inclusive of Previous Amendments to Date): $69.543.08
AMENDMENT OPTIONS
AMENDMENT TO EXERCISE OPTION TO RENEW
(Check all thatApoly)
X Amendment to Contract Performance
X Amendment to Contract Dates
X Amendment to Contract Amount
_Other: (Explain)
DESCRIPTION OF REASON FOR AMENDMENT: (Attach all relevant documentation detailing amendment):
Adjustment of current pricing to new rates—(Exhibit A) and revised scope of work (Exhibit B)
All other terms and conditions of the original contract dated January 31, 2013 remain the same.
See Attached for documentation
NEW CONTRACT INFORMATION:
Amendment Date: October 6. 2015
New Contract Dates- START: 10-1-2015 COMPLETION: 09-30-2016
Amount of Amendment Change $ 24.093.00
Current Contract Amount (inclusive of Previous Amendments to Date): $93,636.08
ALL OTHER TERMS AND CONDITIONS OF THE ORIGINAL CONTRACT AND PREVIOUS
AMENDMENTS REMAIN UNCHANGED AND IN FULL FORCE AND EFFECT.
CITY OF MERIDIN
�
BY:
KEIT TTS, Purchaslsing Manager
Dated:
Contract Amendment No 3 -- Citywide HVAC Preventative Maintenance and Inspections
Clima-Tech
CLI TECH /CORP ATION
BY CI..-c� AA
Dated•to I �1 L�
DEPARTMENT APPROVAL
J N McCORMICK, Deputy PW Dlrector
Page 1 of 14
EXHIBIT A
MILESTONE / PAYMENT SCHEDULE
A. Total and complete compensation for this Contract Amendment shall not exceed
$24,093.00.
TASK
DESCRIPTION
AMOUNT
1
Meridian City Hall
$7,360.00
2
Meridian City Hall IT Server Room
$4,162.00
3
Meridian Police Department Admin
$3,580.00
4
Police K-9 Building
$461.00
5
Old City Hall — 33 E Idaho
$796.00
6
Meridian Water Division Admin
$2,402.00
7
Meridian Fire Stations (All 5 locations)
$3,780.00
8
Meridian Fire Safety Center-
$296.00-
9
Meridian Parks Maintenance Facility
$464.00
10
Meridian City Community Center
$792.00
TOTAL
$24,093.00
Contract Amendment No 3 — Citywide HVAC Preventative Maintenance and Inspections Page 2 of 15
Clima-Tech
Schedule of Services Exhibit
Meridian City Hall
BOILERS
Check Electrical Connections Oct
4hrs
Perform combustion Analysis
Check injection pump for noise, leaks
Check Inducer Motor Amp Draw -Compare to specs
Check Injection Pump Motor Amp Draw -Compare to specs
Check Boiler on -board staging and capacity controls
Check gas train for proper operation and modulation
check overall integrity of boilers for leaks, signs of damage/wear
Check digital communications to ALC controls
CHILLER
Involve Facilities Manager ALC ONSITE DAY
Check RS -485 Interface and Modbus Protocol
Review data points with Facilities Manager
Test Annunciation
Confirm Initiation alarms
Verbally Report Overall Chiller Status to Facilities Manager
Report any needed repair issues
CIRC PUMPS
Lube Loop Pumps and Audibly inspect April/Oct
3hrs
Check Head on Pumps
General Inspection of piping
Check Electrical Connections and contactors
Check VFD's
DUCTLESS SPLIT SYSTEMS
Check Electrical Connections - April
6hrs
Clean and Inspect condenser Coils
Check Foam Filters for cleanliness, damage
Check condenser fan
Check indoor section and blower for dirt, vibration, noise
Check Compressor for proper operation
check refrigerant Charge
Check Outdoor Section for dirt, vibration, noise
Clean Foam Filters
EJECTOR PUMP
Check Electrical Connections April/Oct
2hrs
Perform Audio/Visual/Taste Inspection
EXHAUSTERS
Check Electrical Connections April
5hrs
Contract Amendment No 3 — Citywide HVAC Preventative Maintenance and Inspections Page 3 of 15
Clima-Tech
Change Belts Annually- Provided by City
Check Motor Amp Draw -Compare to specs
Check blower wheel for dirt, vibration, noise
Check Motor and unit Mounts
GENERATOR ALC ONSITE DAY
Involve Facilities Manager
Check RS -485 Interface and Modbus Protocol
Review data points with Facilities Manager
Test Annunciation
Confirm Initiation alarms
AIR HANDLERS — ROOFTOP
Check Electrical Connections April/Oct
12hirs
Check Filter Banks for loading and integrity
Check Motor Amp Draw -Compare to specs
Check blower wheel for dirt, vibration, noise
Check Actuator wiring and mounting connections
Check Motor and unit Mounts
Check VFD's for SA
Check VFD's for RA
Lubricate and Check and Stroke Return Air Dampers
Lubricate and Check and Stroke Exhaust Air Dampers
Lubricate and Check and Stroke Bypass Air Dampers
Lubricate and Check and Stroke Outdoor Air Dampers
Lubricate and Check and Stroke Supply Air Dampers
Inspect Hot water Coils
Stroke valve in Hot water Coils
Inspect Chilled water Coils
Stroke valve in Chilled water Coils
Check smoke detectors
Check interlock end switch on Outside Air Dampers (Mailroom Safety)
Check Freezestats
Check overall integrity of Air Handler including air seals
POTABLE HOT WATER
Check Electrical Connections April/Oct
15min
Inspect Pump for leaks, noise vibration
BUILDING PRESSURIZATION CONTROLS
Check Ebtron main pressure transducer/controller overall condition
Inspect tubing for leaks
Inspect wiring connections
Test A/H transducers for response and Communications to ALC
system April/ Oct
5hrs
FAN -POWERED VAVs
Check Electrical Connections April/Oct
21 hrs
Contract Amendment No 3 — Citywide HVAC Preventative Maintenance and Inspections Page 4 of 15
Clima-Tech
Inspect Heat -X Coils
Change Filter
Check Motor Amp Draw -Compare to specs
Check blower wheel for dirt, vibration, noise
Check Actuator wiring and mounting connections
Check Motor and unit Mounts
on ALC: Note actuator stroke and TD results req City Assist
WATER TREATMENT
Check Sidestream filters, change bag filters April -July -Oct -Jan
4hrs
Check Glycol Barrel for proper fill level
Draw HW loop sample -Send to Dow for chemical analysis
Draw CW loop sample -Send to Dow for chemical analysis
Draw IT Data Aire #1 loop sample -Send to Dow for chemical analysis
Draw IT Data Aire #2 loop sample -Send to Dow for chemical analysis
Test loop chemicals for glycol %
Review and post water sample results on cumulative log
Advise MCH of potential problems/repairs
This Proposal only covers sending water sample to Dow One time a Year in April
And doing Quarterly field test in July, Oct and Jan
Contract Amendment No 3 — Citywide HVAC Preventative Maintenance and Inspections Page 5 of 15
Clima-Tech
IT SERVER ROOM 3 FLOOR City Hall - MECHANICAL
Check Electrical Connections
Check Electric Heaters for proper operation
Check Humidifiers for proper operation
Check condenser Motors Amp Draw -Compare to specs
Change belts on indoor units section -Belts provided by City
Check Motor and Motor Mounts
Check for proper Air delivery at floor diffusers
Check ALC for trends, setpoints
Check temperature split at SA/RA for proper operation
Check dry cooler fan motors, blades for dirt, cracks, damage
Check Compressors for proper operation, amp draw, insulation, etc.
Check Refrigerant for leaks
Check refrigerant charge levels on all circuits
Check Dry Cooler for leaks
Check wetside economizer pump for proper operations. Check for
leaks.
Perform overall visual and audible checks of outdoor units
Perform overall visual and audible checks of indoor units unit
Check digital communications to ALC controls
Lube indoor fan motors and bearings
Perform Complete Dry Cooler Coil Cleaning
Check Blower bearings for wear
Verbally Report Overall Indoor/Outdoor HVAC Status to Facilities
Manager
Report any needed repair issues
Contract Amendment No 3 — Citywide HVAC Preventative Maintenance and Inspections Page 6 of 15
Clima-Tech
AUTOMATED LOGIC — CLIMA-TECH SOFTWARE SUPPORT SUBSCRIPTION
Automated Controls DDC- Citywide System
We (Clime -Tech Corporation) agree to provide:
• Level 1 Subscription Services including
✓ Software upgrades as they become available, generally at least once per year
✓ Telephone technical support for instruction on routine operations of the WebCTRL software
✓ Tuition -free training for regularly scheduled classes at Clima-Tech facilities
• Level 2 on-site scheduled services by a qualified controls technician/engineer
✓ 2 days per year
• Additional services billed at our Discounted Rate for Subscription Agreement customers.
You (the customer) agree to:
• Pay billed invoices for subscription services and additional services / repairs within 30 days of the invoice date.
• Permit our personnel reasonable access in order to perform services included in this agreement.
General provisions:
Any employee or representative of customer shall be permitted to attend regularly scheduled classes held at Chma-Tech facilities.
Tuition for such classes are included in this agreement. Transportation and expenses shall be the responsibility of the customer. A toll,
free telephone number is available for telephone technical support to any employee or representative. Technical support included in this
agreement shall be for instruction on routine operations of the WebCTRL software. Repair service and extended software diagnosis of
control system failure is beyond routine operations, but will be provided at the discounted rate for subscription agreement customers.
Current discounted rate is $105/hour for software service and $90/hour for installation service. (Non -discounted rate is $125/hour and
$105/hour respectively) Rates are subject to annual change.
On-site services by a qualified controls technician / engineer will be scheduled for TWO days per year. On-site services shall include
such services as:
✓ Install new drivers and software patches (Level I)
✓ Review backup procedures /perform backups (Level II)
✓ Check firewall and virus scanning auxiliary software to ensure server security (Level II)
✓ Perform Locked Point Check and determine if locks should be removed (Level II)
✓ Review BAS schedules, correct schedules if necessary and resolve scheduling conflicts (Level II)
✓ Review and correct parameter conflicts (Level II)
✓ Revise graphics for enhancements and room identification changes (Level II)
✓ Check for errors in the database or corrupted files (Level II)
✓ Address any concerns and additional programming desired by the customer (Level II)
Installation services and additional software services not completed during the scheduled on-site service will be completed timely and
prioritized to meet the needs of the customer _
Contract Amendment No 3 — Citywide HVAC Preventative Maintenance and Inspections Page 7 of 15
Clima-Tech
MERIDIAN CITY POLICE DEPARTMENT HEADQUARTERS
Cooling Checkout
Gaspack Rooftop
Units
Units
✓
AC1
Check Electrical Connections and Contactors
✓
AC1
Check Operating and Safety Controls
HE1 Check Evaporator Fan Wheel and Motor Bearings
✓
Visually Inspect for
✓
AC1
Leaks
✓
AC1
Check Cap Tubes for Wea
✓
ACI
Check Condenser Fan Blade and Motor Bearings
✓
AC1
Check Evaporator Fan Wheel and Motor Bearings
✓
AC1
Inspect Condenser and Evaporator Coils
✓
AC1
Inspect Condensate Drain Pan - Clean If Indicated
Check Refrigerant Pressures and
✓
AC2
Temperatures
✓
FBE
Check Evaporator Fan Belt and Sheave
✓
FBI
Evaporator Fan Belt to be Changed in Fall Checkout
✓
ECO
Check Economizer Electrical Connections
✓
ECO
Inspect Economizer Dampers
Lubricate Economizer Ball Joints and
✓
ECO
Bearings
✓
ECO
Confirm Economizer Operation
✓
FL5
Filters to be changed by Clima-Tech - Filters to be provided by City
Coil Washing
WCC
Wash Condenser Coil
Sally port Unit Heaters
✓
AC1
Check Electrical Connections and Contactors
✓
AC1
Check Operating and Safety Controls
Visually Inspect for
✓
AC1
Leaks
Check Cap Tubes for
✓
AC1
Wear
✓
AC1
Check Condenser Fan Blade and Motor Bearings
✓
AC1
Check Evaporator Fan Wheel and Motor Bearings
✓
AC1
Inspect Condenser and Evaporator Coils
✓
AC1
Inspect Condensate Drain Pan sClean If Indicated
Rooftop Exhaust Fans
✓
EFR
Check Motor Bearings and Fan Wheel
✓
EFR
Check Belts and Sheave
✓
EFR
Lubricate Blower and Motor Bearings
Restroom Exhaust
Fans
0
EFB
Audible Check on Bathroom Exhausters
Midseason Filter
Change
Gaspack Rooftop
Units
0 FI -7 Filters to be provided and changed by City
Heating Checkout
Gaspack
Rooftop
Units
✓
HE1 Check Electrical Connections and Contactors
✓
HE1 Check Operating and Safety Controls
✓
HE1 Check Evaporator Fan Wheel and Motor Bearings
✓
HEG Inspect Heat Exchanger
✓
HEG Visually Check Combustion
Page 8 of 15
Contract Amendment No 3 — Citywide HVAC Preventative Maintenance and Inspections
Clima-Tech
✓
HEG
If Indicated Check Gas Pressure and Combustion Fan
Check Electrical Connections and Contactors
✓
Check Power Exhaust blower, sheaves and
✓
PE
belt.
✓
FBE
Check Evaporator Fan Belt and Sheave
✓
FBI
Change Fan Belt - Included in Maintenance Price
✓
FBI
Change Fan Belt- Belt provided by City
✓
PEB
Change Power Exhaust Fan Belt- belt provided by city
✓
ECO
Check Economizer Electrical Connections
✓
ECO
Inspect Economizer Dampers
Lubricate Economizer Ball Joints and
✓
ECO
Bearings
✓
ECO
Confirm Economizer Operation
✓
FL5
Filters to be changed by Clima-Tech - Filters to be provided by City
Sally port Unit Heaters Number of Units
✓
HE1
Check Electrical Connections and Contactors
✓
HE1
Check Operating and Safety Controls
✓
HE1
Check Evaporator Fan Wheel and Motor Bearings
✓
HEG
Inspect Heat Exchanger
✓
HEG
Visually Check Combustion
✓
HEG
If Indicated Check Gas Pressure and Combustion Fan
Rooftop Exhaust Fans
✓ EFR Check Motor Bearings and Fan Wheel Number of RT EF
✓ EFR Check Belts and Sheave
✓ EFR Lubricate Blower and Motor Bearings
Restroom Exhaust
Fans
0 EFB Audible Check on Bathroom Exhausters Number of RR EF
Midseason Filter
Change
Gaspack Rooftop
Units Number of Units
0 FL7 Filters to be provided and changed by City
Contract Amendment No 3 — Citywide HVAC Preventative Maintenance and Inspections Page 9 of 15
Clima-Tech
Cooling
Checkout
Heating
Checkout
MERIDIAN CITY WATER DEPARTMENT HEADQUARTERS
Sp
it Systems in Mezzanine
✓
AC1
Check Electrical Connections and Contactors
✓
ACI
Check Operating and Safety Controls
✓
Visually Inspect for
Visually Inspect for
✓
AC1
Leaks
✓
Check Cap Tubes for
Check Cap Tubes for
✓
AC1
Wear
✓
AC1
Check Condenser Fan Blade and Motor Bearings
✓
AC1
Check Evaporator Fan Wheel and Motor Bearings
✓
AC1
Inspect Condenser and Evaporator Coils
✓
AC1
Inspect Condensate Drain Pan - Clean If Indicated
FI -8
Clean foam filter
Check Refrigerant Pressures and
✓
AC2
Temperatures
F7%/
FL1
Change Filters
Ductless Split for IT Room
✓
AC1
Check Electrical Connections and Contactors
✓
ACI
Check Operating and Safety Controls
Check Operating and Safety Controls
✓
Visually Inspect for
✓
AC1
Leaks
Inspect Heat Exchanger
✓
Check Cap Tubes for
✓
AC1
Wear
✓
AC1
Check Condenser Fan Blade and Motor Bearings
✓
AC1
Check Evaporator Fan Wheel and Motor Bearings
✓
AC1
Inspect Condenser and Evaporator Coils
✓
AC1
Inspect Condensate Drain Pan - Clean If Indicated
✓
FI -8
Clean foam filter
Sp
it Systems in Mezzanine
✓
HE1
Check Electrical Connections and Contactors
✓
HE1
Check Operating and Safety Controls
✓
HE1
Check Evaporator Fan Wheel and Motor Bearings
✓
HEG
Inspect Heat Exchanger
✓
HEG
Visually Check Combustion
✓
HEG
If Indicated Check Gas Pressure and Combustion Fan
✓
FL1
Change Filters
Ductless Split for IT Room
,1 1 HE1 Check Evaporator Fan Wheel and Motor Bearings
✓ FI -8 Clean foam filter.
Contract Amendment No 3 — Citywide HVAC Preventative Maintenance and Inspections Page 10 of 15
Clima-Tech
Customer City of Meridian
Location Old City Hall
City Meridian, Idaho
Cooling Checkout Estimated Time for Cooling Checkout 5.5 hrs.
Furnaces
and A/C Number of Units 6 Estimated Time/Unit 40 min.
✓
AC1
Check Electrical Connections and Contactors
✓
AC1
Check Operating and Safety Controls
✓
AC1
Visually Inspect for Leaks
✓
AC1
Check Cap Tubes for Wear
✓
AC1
Check Condensor Fan Blade and Motor Bearings
✓
AC1
Check Evaporator Fan Wheel and Motor Bearings
✓
ACI
Inspect Condensor and Evaporator Coils
✓
AC1
Inspect Condensate Drain Pan - Clean If Indicated
✓
AC2
Check Refrigerant Pressures and Temperatures
✓
FL1
Change Filters
Heating Checkout Estimated Time for Heating Checkout 4 hrs.
Furnaces and A/C Number of Units 6 Estimated Time/Unit 20 min.
✓ HE1 Check Electrical Connections and Contactors
✓
HEI Check Operating and Safety Controls
✓ HE1 Check Evaporator Fan Wheel and Motor Bearings
✓ HEG Inspect Heat Exchanger
✓ HEG Visually Check Combustion
✓ HEG If Indicated Check Gas Pressure and Combustion Fan
IFL1 Change Filters
Note: City to supply filters, change filters in-between C -T maintenance,
clean condensing units, and check thermostat programming
Contract Amendment No 3 — Citywide HVAC Preventative Maintenance and Inspections Page 11 of 15
Clima-Tech
Customer City of Meridian
Location Canine Training Building
City Meridian, Idaho
Estimated Time for Cooling
Checkout 3
5 Ton Goodman Number of
Unit Units 1
Check Electrical Connections and
AC1 Contactors
AC1 Check Operating and Safety Controls
AC1 Visually Inspect for Leaks
AC1 Check Cap Tubes for Wear
AC1
Check Condensor Fan Blade and Motor Bearings
AC1
Check Evaporator Fan Wheel and Motor Bearings
✓
Inspect Condensor and Evaporator
AC1
Coils
AC1
Inspect Condensate Drain Pan - Clean If Indicated
AC2
Check Refrigerant Pressures and Temperatures
AC3
Check Reversing Valve Operation
LEM
Lubricate Evaporator Motor Bearings
Check Evaporator Fan Belt and
FBE
Sheave
BBB
Change Fan belt if so equipped- Furnished by City
Number of
Boiler and Circ. Pumps Units 1
e✓ AC1 Check Operating and Safety Controls
✓ AC1 Visually Inspect for Leaks
Estimated Time for Heating
Checkout 3
5 Ton Goodman Number of
Unit Units 1
✓ HE1 Check Evaporator Fan Wheel and Motor Bearings
✓ AC4 Visually Inspect for Leaks
✓ FBE Check Evaporator Fan Wheel and Motor Bearings
Number of
Boiler and Circ. Pumps Units 1
✓
HE1
HE1
HEG
HEG
HEG
HE7
HEP
HEP
HEP
HEP
HEP
Check Electrical Connections and
-Contactors
Check Operating and Safety Controls
Inspect Heat
Exchanger
Visually Check Combustion
If Indicated Check Gas Pressure and Combustion Fan
Check Circ Pumps and controls for operation, leakage
Excercise and Check safety pressure valve for low pressure operation and leaks
Check induction blower and differential pressure control
• -Check condensate
drain
Check Combustion and Vent Piping
Check Microprocessor for fault history
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
Exhaust Fan
Check
✓ electrical
✓ Check operating and safety controls
✓ Change belt - provided by City
Number of
Units
Contract Amendment No 3 — Citywide HVAC Preventative Maintenance and Inspections Page 12 of 15
Clima-Tech
MERIDIAN FIRE DEPTS
Cooling Checkout
Estimated Time for Cooling Checkout
Split System
Number of Units 4d Time/Unit
✓
✓
AC1
Check Electrical Connections and Contactors
HE1
✓
AC1
Check Operating and Safety Controls
Check Evaporator Fan Wheel and Motor Bearings
✓
AC1
Visually Inspect for Leaks
✓
✓
AC1
Check Cap Tubes for Wear
HEG
✓
AC1
Check Condenser Motor Amps
Check Combustion Motor Amps
✓
AC1
Check Condensor Fan Blade and Motor Bearings
✓
✓
AC1
Check Evaporator Motor Amps
HEG
✓
AC1
Check Evaporator Fan Wheel and Motor Bearings
Check Heat Rise
✓
AC1
Inspect Condensor and Evaporator Coils
✓
✓
AC1
Inspect Condensate Drain Pan - Clean IF Indicated
FL1
✓
AC2
Check Refrigerant Pressures and Temperatures
✓
AC2
Check Compressor Amps
✓
FL1
Change Filters ( Spplied By City)
Coil Washing Coil Washing Time/Unit
WCC Wash Condensor Coil
Rooftop Exhaust Fans Estimated Time
✓ EFR Check fvbtor Bearings and Fan Wheel Number of 2
✓ EFR Check Belts and Sheave
✓ EFR Lubricate Blow er and Motor Bearings
Heating Checkout
Estimated Time for Heating Checkout
Split System
Number of Units 4d Time/Unit
✓
HE1
Check Electrical Connections and Contactors
✓
HE1
Check Operating and Safety Controls
✓
FE1
Check Evaporator Fan Wheel and Motor Bearings
✓
HE1
Check Evaporator Motor Amps
✓
HEG
Inspect Heat Exchanger
✓
HEG
Visually Check Combustion
✓
HEG
Check Combustion Motor Amps
✓
HEG
Check Gas Pressure ( If Needed)
✓
HEG
Clean Flame Sensor ( If Equipped )
✓
HEG
Visually Check Flame Travel
✓
HEG
Check Heat Rise
✓
HEG
Check Condensate Drain ( if a 90% )
✓
HEG
Check Igni)n source
✓
FL1
Change Filters ( Supplied By City)
Contract Amendment No 3 — Citywide HVAC Preventative Maintenance and Inspections Page 13 of 15
Clima-Tech
MERIDIAN PARKS & MAINT
Cooling Checkout
Num be r of Units 2 d Tim a/Unit
Estimated Time for Cooling Checkout
Split System
Number of Units 2 d Time/Unit
Check Operating and Safety Controls
✓
AC1
Check Electrical Connections and Contactors
Check Evaporator Motor Amps
✓
AC1
Check Operating and Safety Controls
Visually Check Combustion
✓
AC1
Visually Inspect for Leaks
Check Gas Pressure ( If Needed)
✓
AC1
Check Cap Tubes for Wear
Visually Check Flame Travel
✓
AC1
Check Condenser Motor Amps
Check Condensate Drain ( if a 90% )
✓
AC1
Check Condensor Fan Blade and Motor Bearings
Change Filters ( Supplied By City)
✓
AC1
Check Evaporator Motor Amps
Check Motor Bearings and Fan Wheel Num be r of 1
✓
AC1
Check Evaporator Fan Wheel and Motor Bearings
✓
AC1
Inspect Condensor and Evaporator Coils
✓
AC1
Inspect Condensate Drain Pan - Clean If Indicated
✓
AC2
Check Refrigerant Pressures and Temperatures
✓
AC2
Check Compressor Amps
✓
FL1
Change Filters ( Spplied By City)
Coil Washing Coil Washing Time/Unit
WCC Wash Condensor Coil
Rooftop Exhaust Fans
✓ EFR
✓ EFR
✓ EFR
Heating Checkout
Estimated Time
Check Motor Bearings and Fan Wheel Number of 1
Check Belts and Sheave
Lubricate Blower and Motor Bearings
Estimated Time for Heating Checkout
Split System
Num be r of Units 2 d Tim a/Unit
✓ HE1
Check Electrical Connections and Contactors
✓ HE1
Check Operating and Safety Controls
✓ HE1
Check Evaporator Fan Wheel and Motor Bearings
✓ HE1
Check Evaporator Motor Amps
✓ HEG
Inspect Heat Exchanger
✓ HEG
Visually Check Combustion
✓ HEG
Check Combustion Motor Amps
✓ HEG
Check Gas Pressure ( If Needed)
✓ HEG
Clean Flame Sensor ( if Equipped )
✓ HEG
Visually Check Flame Travel
✓ HEG
Check Heat Rise
✓ HEG
Check Condensate Drain ( if a 90% )
✓ HEG
Check Ignion source
✓ FL1
Change Filters ( Supplied By City)
Rooftop Exhaust Fans
Estimated Time
�✓ EFR
Check Motor Bearings and Fan Wheel Num be r of 1
Contract Amendment No 3 — Citywide HVAC Preventative Maintenance and Inspections Page 14 of 15
Clima-Tech
MERIDIAN COMMUNITY CENTER
Cooling Checkout
HE1
HE1
HE1
HE1
HEG
HEG
HEG
HEG
HEG
HEG
HEG
HEG
HEG
HEG
HEG
HEG
FL1
Estimated Time for Cooling Checkout
Split System
Number of Units 3 d Time/Unit
✓
✓
AC1
Check Electrical Connections
✓
✓
AC1
Check Contactor for Voltage Drop
✓
✓
AC1
Check Operating and Safety Controls
✓
✓
AC1
Visually Inspect for Leaks
✓
AC1
Check Capacitors Charge and for leakage
✓
AC1
Check Condenser Motor Amps
✓
AC1
Check Condensor Fan Blade, Motor Bearings and Amps
✓
AC1
Check TD on Supply Air and Return
✓
AC1
Check Evaporator Fan Wheel, Motor Bearings and Amps
✓
AC1
Inspect Condensor and Evaporator Coils
✓
AC1
Inspect Condensate Drain Pan - Clean If Indicated
✓
AC2
Check Refrigerant Pressures and Temperatures (Per manufacture Requirements)
✓
AC2
Check Compressor Amps
✓
AC2
Clean fresh Air Screen (If Equipped w ith them)
✓
AC2
Wipe or Blow Out Electrical Compartment
✓
FBN
Replace Evaporator Fan Beft if Required - Extra Time and Materials
✓
FL1
Change Filters 1-16x25x4 2-20x25x5
Coil Washing
Coil Washing Time/Unit
WCC
Wash Condensor Coil
Heating Checkout
Estimated Time for Heating Checkout
Split System
HE1
HE1
HE1
HE1
HEG
HEG
HEG
HEG
HEG
HEG
HEG
HEG
HEG
HEG
HEG
HEG
FL1
Number of Units 3 d Time/Unit
Check Electrical Connections and Contactors
Check Operating and Safety Controls
Check Evaporator Fan Wheel and Motor Bearings and Amps
Check Capacitors charge and for leakage
Inspect Heat Exchanger
Visually Check Combustion
Check Combustion/Inducer Motor Amps
Check Gas Pressure Inlet and Outlet
Clean Flame Sensor ( If Equipped )
Visually Check Flame Travel
Check Heat Rise
Check Condensate Drain ( if a 90% )
CheckArrp Draw on Glow Coil Ignition (If Equipped)
Blow Out Burners
Check Defta T On Suppyl Air
Clean Fresh Air Screens
Change Filters 1-16x25x4 2-20x25x5
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
Contract Amendment No 3 — Citywide HVAC Preventative Maintenance and Inspections Page 15 of 15
Clima-Tech