HomeMy WebLinkAboutTask Order 10628 a with Murray Smith and Associates for Water Master Plan 2017 Update TASK ORDER NO. 10628.a Pursuant to the MASTER AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN CITY OF MERIDIAN(OWNER) AND MURRAY, SMITH & ASSOCIATES, INC(MSA) (ENGINEER) This Task Order is made this day of March, 2016 and entered into by and between the City of Meridian, a municipal corporation organized under the laws of the State of Idaho, hereinafter referred to as "City", and accepted by (MURRAY, SMITH & ASSOCIATES, INC (MSA)), hereinafter referred to as "Engineer"pursuant to the mutual promises, covenant and conditions contained in the Master Agreement (Category 1C) between the above mentioned parties dated October 22, 2013. The Project Name for this Task Order 10628.a is as follows: CITY OF MERIDIAN WATER MASTER PLAN 2017 UPDATE - PHASE 1 PROJECT UNDERSTANDING This proposal shall be for professional engineering services to develop a Water Master Plan (Plan). This Plan will evaluate the ability of the City's existing infrastructure to meet projected demands and regulatory requirements for the next 20 years. SCOPE OF WORK Background This project will serve to provide the City with a Department of Environmental Quality (DEQ) approved Plan to specifically address the water system section 58.01.08, of the Idaho Administrative Code. This Plan will serve as an update to previous water planning efforts and in particular the 2011 Water Master Plan. The project will employ workshops to solicit staff input and develop consensus where appropriate. As part of this planning effort an additional Plan section will be included that focuses on the overall replacement of the City's distribution system. An enhanced financial section will also be included. A 20 year capital improvement plan will be generated at the conclusion of the Plan that will describe the projects in a prioritized order and provide order of magnitude costs. Task Order 10628.a Water Master Plan 2017 Update-Phase 1 Page 1 of 9 Murray,Smith&Associates,Inc The City is again experiencing very high growth rates after recovering from the recent recession. Similar to the 2011 Plan, the City's goal is to provide a detailed analysis of what is required over the next five years while also having a longer term capital improvements vision. The City is planning to proceed with this project in two phases, the first of which is described in this Task Order and will be substantively complete in the 2016 Fiscal Year. The second phase of the work will commence after October 1, 2016 and will include the remaining elements required for the development of an updated Plan. The following areas have been identified for inclusion in the Phase 1 Task Order: 1. Support for developing an updated water system GIS database that can be used to regenerate a hydraulic model that represents the GIS on a one to one basis. 2. Regenerate the hydraulic model using updated GIS data. 3. Collect billing and associated meter information required to update the overall system demands. 4. Collect field data and conduct additional calibration of the hydraulic model. 5. Discuss recent and planned development in South Meridian and how growth there may differ from COMPASS projections. 6. Collect information required to develop a long term water main replacement program. 7. Collect benchmarking information from peer utilities. SCOPE OF SERVICES Task 1 —Project Management Subtask 1.1—Kick-Off Meeting A kick-off meeting will be held, once notice to proceed has been received, to officially start the project and discuss the details of the approved scope. MSA will lead the kick- off meeting with City Staff to introduce the project team, establish project objectives, review consultant and City communication protocol, discuss the project scope and examine the project schedule. The primary focus of this meeting will be a discussion of the City's goals for the overall project and specifically Phase 1 of the work. Assumptions • Assumes up to a four (4) hour kick-off meeting with the MSA project manager and one (1) project engineer. Two (2) hours of preparation time is included for the PM and engineer. Task Order 10628.a Water Master Plan 2017 Update-Phase 1 Page 2 of 9 Murray,Smith&Associates,Inc Deliverables • Meeting notes with action items from the kick-off meeting (delivered electronically) Subtask 1.2—General Project Management and Meetings The purpose of this task is to provide management of the project team, schedule and budget. Included in this task are monthly invoicing, budget and schedule review, updates, and general administrative tasks. As project manager, David Stangel, will maintain regular communication with the City and the team throughout the duration of the project, lead meeting and workshop discussions, keep the City up-to-date on any study issues or details and make sure the City's input is incorporated into the work product. The project will be managed to maintain the scope, schedule, and budget. At a minimum, updates on project schedule and budget will be provided as part of the monthly invoicing process. Assumptions • Meeting and workshop facilitation will be limited to those specifically identified in this scope of work. • The City will provide clear, concise and timely input and review on the work products produced by the consultant. • Four (4) hours per month have been budgeted for project management and meeting time for the approximate nine (9) month duration of Phase I. • Monthly project statusmeetings will be with the City. It has been assumed that on-site meetings will be held every other month and the others will be conducted as a conference call. • All draft and final project deliverables except where noted otherwise will be in electronic format. Deliverables • Monthly invoices including a listing of tasks completed each billing period. Task 2—Support Development of an Updated Water System GIS The City is currently working to improve the quality of the spatial and attribute data associated with their water system GIS data. The ultimate goal for this effort will be to enable the automated regeneration of the City's hydraulic model allowing for a one to one relationship between database elements. This task will provide time for MSA to provide support and on-call assistance to the City during the GIS update process. As part of this task MSA will review a preliminary version of the GIS and provide input on issues or additional attributes that will be required for use when generating the hydraulic model. Task Order 10628.a Water Master Plan 2017 Update-Phase 1 Page 3 of 9 Murray,Smith&Associates,Inc 1 A keyto make subsequent updating of the GIS q pd g and hydraulic model a success will be to develop and document an internal process in the form of a standard operating procedure (SOP) which can be utilized by City staff in the future. The SOP will focus on how water system information moves through the City and who has ownership of that data as it gets added to the GIS and subsequently to the hydraulic model. Currently the process involves the cooperation of the Planning Division, Inspection Division, Business Operations Division, which houses the GIS Analysts, and Engineering Division. The components involve developers providing initial plans and ultimately record drawings, inspectors providing surveyed points, the GIS department digitizing the information and the Engineering Division adding the data to the hydraulic model. However,there is not a standard SOP for the process that includes maintenance of the hydraulic model as developments are approved, constructed, and activated. The development of the SOPs will be completed by MSA, but the City will be responsible for leading the process to get input and agreement from the various Divisions. Assumptions • A nominal number of hours (40) has been included for on-call GIS development support. • The GIS is the master repository for all water system information and the hydraulic model will be updated from that information. • City GIS staff will generate a unique pipe identifier within the database. This pipe identifier may or may not be the final identifier, however must be maintained in order to support future updates of the hydraulic model. • MSA will work with the City GIS and Water Division to develop the SOP. City will provide standard SOP template/examples for MSA to ensure conformity with current SOPs. More than one SOP may be required to accurately depict the overall data ownership and processing. The City will be responsible to get input and agreement from the various divisions involved in the SOP process. Deliverables • Draft and final SOPs for updating of the GIS and water model in the future. Task 3—Regenerate Hydraulic Model Using Updated GIS Data MSA will utilize the updated water system GIS data to regenerate the hydraulic model. This will provide the City with a hydraulic model that represents the GIS data on a one to one basis. This will yield a deliverable where each segment of pipe in the hydraulic model will be the same in length, alignment and attributes as those in the GIS. There may be minor differences between the GIS and model around facilities (reservoirs, boosters, wells and PRVs) due to asset management system requirements, however the overall pipe network will be consistent. This task will also include updating scenarios, datasets, domains, queries and output relates that have been historically maintained in the City's existing hydraulic model. Task Order 10628.a Water Master Plan 2017 Update-Phase 1 Page 4 of 9 Murray,Smith&Associates,Inc task will be managed under this task order and charged to the existing Water System Modeling Support Task Order 10556. An initial task will involve verifying the operation and data collection ability of the recently updated SCADA. The City will provide a sample of the available SCADA to MSA for verification prior to conducting field testing to ensure adequate information is available. MSA will develop a proposed calibration plan for collecting pressures and flows at hydrants throughout the system. Many of these locations will be the same as those tested in 2015. MSA will include up to one day of field time to advise on the procedures used by City field crews. MSA will conduct a steady state calibration of the model using the field pressures and flows as well as boundary condition information for all facilities collected by City staff. Based on the results of the calibration, additional tests may be required to validate model results. An overall technical memorandum will be prepared that documents the location of each proposed test and the procedures used to collect the data. This document will be included as an appendix to the overall Plan update describing the field testing and calibration results. Assumptions • The City will take the lead in collecting pressures and flows in the system including providing all the required equipment. • Approximately 20 testing locations have been assumed. • One day of field time has been included for one (1) MSA staff to assist with the field testing. • The field testing may require up to one week of field time by City crews. • City staff will ensure the SCADA is recording at all equipped facilities during the field calibration effort (some PRVs will not have functioning SCADA). • The City will provide a tabular summary of all the fire flow tests that will include; date, time, location of tests and results of both the static and fire flow conditions. • The City will provide SCADA information for all facilities in an electronic format for the time of the field testing in adequate time resolution (i.e. 1 to 5 minute). • Accuracy of the calibration will be targeted at 5 psi difference for static tests and 10 psi difference for fire flows. • No additional field time for MSA has been budgeted for this subtask. Deliverables • Technical memorandum detailing the proposed field testing locations. Results of the steady state calibration and a calibrated model will be documented and provided to the City. Task Order 10628.a Water Master Plan 2017 Update-Phase 1 Page 6 of 9 Murray,Smith&Associates,Inc MSA will consult with the City prior to completing this task to identify which of these functions they wish to maintain. Assumptions • The updated water GIS will be available for use no later than June 2016 allowing for the regeneration of the model to be complete by the end of July 2016. • Demand development is included in a subsequent task. Deliverables • An updated hydraulic model network will be provided to the City at the conclusion of this task. Task 4— Update Existing Demands Utilizing the City's billing records, a link between model nodes and customer demand will be created. This will be done by linking to identifiers between billing and the meters themselves. All meters have been GPS'd and have a spatial location. The City is in the process of switching over to a new billing software and some historical data will need to be collected from the older system. Additionally, the City is working through a new SCADA system. Historical production records will be obtained for the previous three (3) years as well as any available SCADA records. Where available, customer demands will be peaked to match average (ADD), maximum (MDD) and peak(PHD) demands in the model If historical production is not available, production for MDD and PHD will be collected during the summer of 2016 and ADD may need to be finalized in Phase II after more SCADA is available to determine an ADD. This task includes a review of historical SCADA with recent SCADA information to determine the accuracy and availability of SCADA production records from the new system. Flow records for the system PRVs will be used to balance the demand in each pressure zone where available. Assumptions • City will be able to provide 3 years of historical customer billing records. • City meters have been GPS'd and have a common identifier that can serve as the link to the billing records. Deliverables • A working steady state model with existing demands will be delivered. Task 5—Calibrate Hydraulic Model A calibration effort was conducted in 2015, however due to the lack of available SCADA information many system boundary conditions could not be identified. Per conversations with City staff it is recommended that some additional field data collection and subsequent model calibration be conducted in 2016. Additionally, funding remains available from the previous calibration /modeling support contract. Work under this Task Order 10628.a Water Master Plan 2017 Update-Phase 1 Page 5 of 9 Murray,Smith&Associates,inc Task 6—South Meridian Growth Analysis Due to recent changes in the City's growth boundary and development pressure, an initial evaluation of growth in South Meridian is included in this Task Order. The City is planning to extend transmission piping into the southern portions of the City which may have an impact on the amount of near term growth that occurs there. This growth may differ from what is provided by COMPASS. This task includes a workshop with City staff to discuss development interest and current plans to extend water service into the area. COMPASS data will be reviewed and compared with growth potential. A decision will then be made as to whether the updated Plan will utilize different growth projections for the area. If so, a short memorandum will be developed that documents where COMPASS TAZ information will be used and what information will be utilized instead. Assumptions • One workshop with City staff is included to discuss South Meridian growth potential. • After reviewing COMPASS information the City will provide MSA with direction on which source of data should be utilized for this area. • MSA will prepare a technical memorandum only if the City decides to deviate from the COMPASS data. Deliverables • A technical memorandum wilt be developed if the City decides to not utilize the COMPASS based projections. Task 7—Pipe Replacement Program The City has begun a program to replace water system piping on a regular schedule. The City has also begun to analyze the age and material of their piping and plan for how much pipe needs to be replaced and in what timeframe. This task will take the City's work and build upon it to develop a more formalized replacement program which will be included in the updated Plan and have a yearly budget associated with it. MSA will start with the information previously compiled by the City and by working with the GIS staff will update the information related to pipe age and material that has been installed through 2015. MSA will then meet with Engineering and Operations Staff and discuss findings. Two to four different scenarios will be developed relative to possible replacement frequency. An overall recommendation relative to pipe replacement will be developed and included in the Plan. The Pipe Replacement Program will constitute a stand-alone section in the updated Plan. Assumptions • The City will provide updated information on pipe age and material. Task Order 10628.a Water MasterPlan 2017 Update-Phase 1 Page 7 of 9 Murray,Smith&Associates,Inc • One workshop with City staff is included to discuss the pipe replacement program. • A 5-year, 20-year and long term replacement schedule will be identified as part of the work. • Basic planning level costs will be developed for pipe replacement. • The Pipe Replacement Program will not identify specific pipes for replacement, but instead will focus on identifying levels of funding to replace a certain number of feet of pipe per year. At least 3 different scenarios will be evaluated using different ranges of values for life cycle/replacement age and the corresponding levels of funding required by year. For each scenario, a corresponding financing schedule will be developed showing the level of funding that must be set aside to build a depreciation reserve big enough to finance the replacements (to avoid bonding). Specific plans detailing which pipes to replace in which years will be developed by City staff and is not a deliverable for this master plan. • A draft Pipe Replacement Program will be developed by MSA for inclusion as a section in the Plan. Comments on the draft section will be addressed. A final version will be included in the overall Plan in FY 2017. Deliverables • A draft Pipe Replacement Program will be developed by MSA for inclusion in the Plan. Task 8—Utility Benchmarking MSA will perform benchmarking of at least three to four other similar sized utilities on a number of O&M items such as; number of staff, size of system, yearly budget, yearly capital and replacement budget, leak detection and flushing program. This information will be summarized for later documentation in the Plan. Assumptions • MSA will contact Pocatello, Idaho Falls, Twin Falls, Lewiston, Nampa, United Water, Caldwell, Ontario, Bend, Redmond, Walla Walla and Pendleton for benchmarking data. • The actual benchmarking data will be included in the O&M section of the updated Plan that will be documented as part of the Phase 2 Task Order. Deliverables • No specific deliverables will be produced as part of this task. TIME OF COMPLETION and COMPENSATION SCHEDULE The following schedule is based on a Notice to Proceed (NTP)from the City by March 2016 and resulting in Final Updates being completed by September 2017. A NTP issued on a different date will change the schedule accordingly. Task Order 10628.a Water Master Plan 2017 Update.Phase 1 Page 8 of 9 Murray,Smith&Associates,Inc COMPENSATION AND COMPLETION SCHEDULE Task Description Due Date Compensation 1 Project Management&Meetings • Project duration $9,788 2 Support Development of an Updated Water System • September 30,2017 $20,124 GIS 3 Regenerate Hydraulic Model Using Updated GIS • September 30,2017 $9,496 Data 4 Update Existing Demands • September 30,2017 $4,396 5 Calibrate Hydraulic Model • September 30,2016 1 6 South Meridian Growth Analysis • September 30,2017 $7,832 7 Pipe Replacement Program • September 30,2016 $10,960 8 Utility Benchmarking • September 30,2017 $6,152 TASK ORDER TOTAL:$68,748 1 I o be completed as part of the Water System Modeling Support I ask Order 10bb6. The Not-To-Exceed amount to complete all services listed above for this Task Order No. 10628.a is sixty eight thousand seven hundred forty eight dollars ($68,748.00). No compensation will be paid over the Not-to-Exceed amount without prior written approval by the City in the form of a Change Order. Any and all travel will only be reimbursed if pre-approved by the Project Manager, and only per the City of Meridian Travel Policy. Reimbursable expenses will be paid at cost and only if pre-approved by the Project Manager. Any travel and/or reimbursables paid will be paid as part of the Not-To-Exceed Task Order Total per the Compensation and Completion Schedule above. CITY O MURRAY, SMITH & ASSOCIATES, INC —�►i, - BY: ' / BY: _ 1 ,_ A TAMMY de eRD, MAYOR ' cxt-)"‘L Y\y. Dated: 3/aa--71 Dated: 3/11116 Approved by Council: 3 , ,,' ' - - ��0"v"nq-� Atter ' A9-1p JA ' E $HOLMAN, C TY CL--4 , SFAL , Purchasing Approval Depa nt ' . .v fi BY: /ir/l.2�% BY: A A �� —t KEIT ATTS, Purchasing Manager WA REN STEWART, Engineering Manager Dated: 3//y//5 City Project Manager Kyle Radek Task Order 10628.a Water Master Plan 2017 Update-Phase 1 Page 9 of 9 Murray,Smith&Associates,Inc 2016 RATE SCHEDULE for MURRAY,SMITH&ASSOCIATES,INC. Billing Category Hourly Rate Principal Engineer VI $224.00 Principal Engineer V 216.00 Principal Engineer N 208.00 Principal Engineer III 199.00 Principal Engineer II 191.00 Principal Engineer I 184.00 Professional Engineer IX 176.00 Professional Engineer VIII 167.00 Professional Engineer VII 159.00 Professional Engineer VI 151.00 Professional Engineer V 142.00 Professional Engineer IV 134.00 Engineering Designer N 134.00 Professional Engineer III 126.00 Engineering Designer III 126.00 Engineering Designer II 116.00 Engineering Designer I 106.00 Technician N 129.00 Technician III 115.00 Technician II 100.00 Technician I 85.00 Administrative III 91.00 Administrative II 85.00 Administrative I 74.00 ALLOWABLE REIMBURSABLES The following reimbursable expenses will be allowed ONLY if addressed in any resulting task order. Amounts will be reimbursed at cost. Expense Rate Sub-Consultants Cost Outside Printing and Reproduction with Cost Receipt Travel See Below TRAVEL EXPENSES The City will only pay for meal,lodging and transportation expenses for official business that consists of consultants traveling to or from,outside of the Treasure Valley,and that are directly related to the specific task orders. Reimbursement will NOT exceed the limits allow under the US General Services Administration Per Diem Rates for the Boise area. These rates can be found at the following website: http://www.gsa.gov/portal/category/100120. MASTER SERVICES AGREEMENT RATE SCHEDULE Page 1 of 2 Murray,Smith&Associates,Inc. Transportation(Pre-approved by Project Manager): All travel must be by the most economical means practical. If there is interruption of travel or deviation from the direct route for the traveler's convenience,the deviation may not exceed the cost of the uninterrupted travel. Airline: Consultants will only be reimbursed for coach or economy class rates. Rental Cars: A vehicle is only allowed with prior authorization by the City Project Manager ALL OTHER EXPENSES ARE CONSIDERED INCIDENTAL AND ARE NOT REIMBURSABLE Signed and acknowledged by: J. Date: 17/J`1/6 Printed Name: David Stangel Company Name: Murray,Smith&Associates,Inc. FOR CITY USE ONLY Rate Schedule Approval: Date: Warren Stewart,Engineering Manager MASTER SERVICES AGREEMENT RATE SCHEDULE Page 2 of 2 Murray,Smith&Associates,Inc. CONTRACT/AGENDA CHECKLIST Date: 3/3/2016 REQUESTING DEPARTMENT Public Works Fund: 60 Department: 3410 GL Account: 55090 Project# 10628.a Construction: Task Order x PSA Equipment Project Name: Water Master Plan 2017 Update, Phase 1 Project Manager: Kyle Radek Department Representative: Contractor/Consultant/Design Engineer: Murray Smith &Associates Budget Available(Attach Report): yes Contract Amount: $68,748.00 Will the project cross fiscal years? Yes X No Budget Information: FY Budget: FY16 Enhancement#: Grant#: Other: Type of Grant: I C KUB I BASIS OF AWARD Low Bidder Highest Rated Master Agreement x (Bid Results Attached) (Ratings Attached) (Category) 1C Typical Award Yes No If no please state circumstances and conclusion: MSA dated 10-22-2013 Debarment Status(Grant/Federal Funded Projects Only) na (Type in date verified and the status) Date Award Posted: na 10 day protest period: na PW License# na Expiration Date na Corporation Status Goodstanding Insurance Certificates Received(Date): January 15,2015 Expiration Date: January 4,2016 Rating: A Payment and Performance Bonds Received(Date): na Rating: na Builders Risk Ins.Req'd: Yes na No nan If yes,has policy been purchased? na (Only applicabale for projects above$1,000,000) Date Submitted to Clerk for Agenda: Approval Date By: Council Purchase Order No.: Date Issued: WH5 submitted na (Only for PW Construction Projects) NTP Date: na (Only for non Public Works Project) IDSOS Viewing Business Entity Page 1 of 2 ' '1,., IDAHO SECRETARY OF STATE L` , Viewing Business Entity Lawerence Denney, Secretary of State [ New Search ] [ Back to Summary ] [ Get a certificate of existence for MURRAY, SMITH &ASSOCIATES, INC. ] [ Monitor MURRAY, SMITH & ASSOCIATES, INC. business filings ] MURRAY, SMITH & ASSOCIATES, INC. 121 SW SALMON ST STE 900 PORTLAND, OR 97204 Type of Business: CORPORATION, GENERAL BUSINESS Status: GOODSTANDING State of Origin: OREGON Date of 14 May 2007 Origination/Authorization: Initial Registered Agent: INCORPORATING SERVICES LTD 2219 N CURTIS BOISE, ID 83706 Organizational ID / Filing C173086 Number: Number of Authorized Stock Shares: Date of Last Annual Report: 22 Jun 2015 Annual Report Due: May 2016 Original Filing: [ Help Me Print/View TIFF ] Filed 14 May 2007 CERTIFICATE View Image (PDF format) OF AUTHORITY View Image (TIFF format) Annual Reports: [ Help Me Print/View TIFF ] Report for year 2015 ANNUAL REPORT View Document Online Report for year 2014 ANNUAL REPORT View Document Online Report for year 2013 ANNUAL REPORT View Document Online Report for year 2012 ANNUAL REPORT View Document Online Report for year 2011 ANNUAL REPORT View Document Online Report for year 2010 ANNUAL REPORT View Document Online Report for year 2009 ANNUAL REPORT View Document Online Report for year 2008 ANNUAL REPORT View Document Online Report for year 2008 CHNG View Image (PDF format) View RA/RO Image (TIFF format) Idaho Secretary of State's Main Page State of Idaho Home Page http://www.accessidaho.org/public/sos/corp/C173086.html 12/3/2015 IDSOS Viewing Business Entity Page 2 of 2 Comments, questions or suggestions can be emailed to: sosinfo@sos.idaho.gov http://www.accessidaho.org/public/sos/corp/C173086.html 12/3/2015 A INSURANCE 1 CERTIFICATE OF LIABILITY DATE(MMIDD/YYYY) 10/13/2015 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder In lieu of such endorsement(s). PRODUCER CONTACT Marsh Sponsored Programs NAME a division of Marsh USA Inc. PHONE 800-338-1391 FAX tom'N°' )' I(AIC,No):888-621-3173 701 Market Street, Ste. 1100 E-MAIL ADDRESS:acecclientrequest@marsh.com St. Louis MO 63101 INSURER(S)AFFORDING COVERAGE NAIC C INSURED INSURERA:Hartford Accident & Indemnity Co 22357 Murray, Smith & Assoc. Inc. INSURERB:$entinel Insurance Company Ltd 11000 121 S.W. Salmon, Ste. 900 INSURERC:Hartford Underwriters Insurance Co 30104 Portland, OR 97204 INSURER D: INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POUCIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POUCIES DESCRIBED HEREIN IS SUBJECT TO ALL TI-E TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POUCIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR ADDL SUER LTR TYPE OF INSURANCE INSR WVD POLICY NUMBER [MWLDIDYp/YEYyy)( lp EXP LIMITS A GENERAL LIABILITY Y 84SBWCG0421 11/01f2075 71101l2016 EACH OCCURRENCE 52,000,000 X COMMERCIAL GENERAL LIABILITY Prof. Liab. Excl. _MMAGE'rU RENTED PREMISES(_Eaoccurrenc 52,000,000 I CLAIMS-MADE X OCCUR - MED EXP(Any one person) _510,000 _ PERSONAL 8 ADV INJURY 52,000,000 GENERAL AGGREGATE 54,000,000 GENL AGGREGATE LIMIT APPLIES PER. PRODUCTS-COMP/OP AGG 54,000,000 POLICY 51( JPERCOT r1 LOC C AUTOMOBILE LIABILITY 5 Y 84UEGLN7493 11/01/2015 11/01/2016 COMBiNEDSINGLE UMIT X ANY AUTO (Ea accident) 51,000.000 ALL OWNED -SCHEDULED BODILY INJURY(Per person) $ AUTOS AUTOS BODILY INJURY(Per accident) $ HIRED AUTOS NON-OWNED AUTOS PROPERTY DAMAGE 5 (Per accident) 5 A X UMBRELLA LIAB X OCCUR 84SBWCG0421 11/01/2015 11/01/2016 EXCESS LIAB EACH OCCURRENCE $3,000,000 CLAIMS-MADE AGGREGATE $3,000,000 DED I X I RETENTION$10,000 B WORKERS COMPENSATION 89WBGBM8539 $ AND EMPLOYERS'LIABILITY 11/01/2015 11/01/2016I VJCSTATU- OTH- ANY PROPRIETOR/PARTNER/EXECUTIVE Y/N x TORY I IMITS I ISR .. a OFFICER/MEMBEREXCLUDED? NIA E.L.EACH ACCIDENT 5500,000 (Mandatory In NH) If yes decenbe under E.L.DISEASE•EA EMPLOYEE 5500,00 0 DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT 5500,000 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES(Attach ACORD 101,Additional Remarks Schedule,if more space is required) Re: MSA Project : City of Meridian Rester City of Meridian is named as additional insured on the above referenced policies when required by written contract. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POUCY PROVISIONS. City of Meridian AUTHORIZED REPRESENTATIVE M3 E Broadway Ave ,` Meridian ID 8Ave �/ ®1988-2010 ACORD CORPORATION. All rights reserved. ACORD 25(2010/05) The ACORD name and logo are registered marks of ACORD City of Meridian Purchasing Dept. Memo To: Jaycee L. Holman, City Clerk, From: Kathy Wanner, Buyer CC: Jacy Jones, Kyle Radek Date: 3/16/2016 Re: March 22nd City Council Meeting Agenda Item The Purchasing Department respectfully requests that the following item be placed on the March 22nd City Council Consent Agenda for Council's consideration. Approval of Task Order 10628.a to MURRAY SMITH & ASSOCIATES for the "WATER MASTER PLAN 2017 UPDATE — PHASE 1" project for a Not-To-Exceed amount of$68,748.00. Recommended Council Action: Award of Task Order 10628.A to MURRAY SMITH &ASSOCIATES for the Not-To-Exceed amount of$68,748.00. Thank you for your consideration. •Page 1 E ����� Mayor Tammy de Weerd City Council Membert' Keith Bird Public IDAHC9 Joe Borton Luhe Cavener ��T ii Genesis Milam Works Department Anne Little Roberts Ty Palmer TO: Keith Watts,Purchasing Manager FROM: Kyle Radek Assistant City Engineer DATE: February 25,2016 SUBJECT: TASK ORDER 10628.a ACCORDING TO THE MASTER AGREEMENT WITH MURRAY,SMITH&ASSOCIATES DATED OCTOBER 22,2013, FOR WATER MASTER PLAN PHASE 1,FOR AN AMOUNT NOT TO EXCEED $68,748. I. DEPARTMENT CONTACT PERSONS Kyle Radek,Assistant City Engineer 489-0343 Warren Stewart, City Engineer 489-0350 Tom Barry,PW Director 489-0372 II. DESCRIPTION A. Background The Water Master Plan is an important document that is used to examine our existing water supply and distribution system and plan for the future needs of our growing community. An updated master plan is not only a regulatory requirement, but good practice for an expanding utility. The City's last water master plan was completed in 2012. Updating our master plan every 5 years allows us to effectively make revisions to growth projections and corresponding adjustments and corrections to system plans. B. Proposed Project The proposed project is the first phase of an updated water master plan to be completed in FY 2017. This first phase will include an update of the City's hydraulic model,updated model calibration,an analysis of growth scenarios in South Meridian, and an analysis of water main replacement program needs. Page 1 of 2 Phase 2 will include additional analysis such as an update of overall population and demand projections, system capacity analysis in relation to those projections, capital improvement planning, and water supply planning. III. IMPACT A. Fiscal Impacts Project Costs and Funding: Fiscal Year 2016 Cost Water Master Plan Phase 1 $68,748 Total $68,748 Funding Fiscal Year 2016 Budget Acct Code 3410-55090 $175,000 Anticipated Future Costs and Funding Fiscal Year 2017 Estimated Cost Water Master Plan Phase 2 $60,000 Proposed Funding Fiscal Year 2017 Budget Acct Code 3410-55090 $150,000 B. Alternatives The City could delay the master plan update,however, the existing plan becomes less valuable and less suitable to satisfy regulatory requirements as it ages. Additionally,tasks such as the automated update of the model through GIS, a time and labor-saving improvement,would be cancelled or delayed as well. C. Time Constraints Approval of this item will allow Phase 1 of the task order to be completed by the end of FY 2016. Departmental Approval: 43S. 01, Page 2 of 2