HomeMy WebLinkAboutPZ - Agency Comments
March 16, 2016
Sonya Watters
City of Meridian
33 E. Broadway Avenue
Meridian, Idaho 83642
VIA EMAIL
RE: H-2016-0025 DUTCH BROS. COFFEE
The Idaho Transportation Department (ITD) has reviewed the conditional use application for Dutch
Bros. Coffee located at 37 E. Calderwood Drive east of SH-69 (S. Meridian Road). ITD has the
following comments:
1. ITD has no objection to a Dutch Bros. Coffee being constructed in this location.
2. No access is requested and none is approved with this application.
3. Applicant must apply for and receive an approved Right-of-Way use permit prior to doing any
work or activity within the highway Right-of-Way. Please have the applicant contact Shona
Tonkin at 334-8341 for this application.
4. Coffee establishments of this type have a tendency of long lines of traffic. ITD has concerns if
traffic backs up onto SH-69. How will this establishment keep traffic from backing up onto
SH-69.
5. The applicant does not indicate any landscaping to be completed within ITD right-of-way.
IDAPA 39.03.42.600.04 rules govern landscaping within ITD right-of-way.
6. Idaho Code 40-1910 does not allow advertising within the right-of-way of any State highway
system.
7. IDAPA 39.03.60 rules govern advertising along the State highway system. The applicant can
contact Dion Burch at 334-8355 for more information.
If you have any questions, you may contact Shona Tonkin at 334-8341 or me at 332-7191.
Sincerely,
James K. Morrison
Development Services Manager
jim.morrison@itd.idaho.gov
CENTRAL CENTRAL DI
STRICT HEALTH DEPARTMENT Return❑tACz
�� DISTRICT Environmental Health Division ❑ Boise
HEALTH ❑ Eagle
DEPARTMENT
❑ Garden City
❑ Kuna
Rezone # Meridian
Conditional Use # Ci Li star
Preliminary / Final /Short Plat
❑ 1, We have No Objections to this Proposal.
❑ 2. We recommend Denial of this Proposal.
❑ 3, Specific knowledge as to the exact type of use must be provided before we can comment on this Proposal.
to concerning soil conditions on this Proposal before we can comment. m the depth of:
❑ 4 We will require more data
concerning individual sewage disposal flOV? will
aeristicsore data concern g
❑ 5. Before we can comment ❑ waste
❑ high seasonal ground water ❑ other
❑ bedrock from original grade pathogens to receiving ground waters and
❑ 6.
This office may require a study to assess the impact of nutrients and
surface waters.well construction and
Ll 7. This project shall be reviewed by the Idaho Department of Water Resources concerning
water availability. rove this proposal for:
After written approval from appropriate entities are sewage system an approve
community water well
❑ $' ❑central sewage ❑community sewage sy
Ll interim sewage ❑central water
L3 individual sewage ❑individual water
roved by the Idaho Department of Environmental Quality:
❑ g, The following
plan(s) must be submitted ommu community
sewage system ❑ community water
❑ central sewage ❑ central water
L3 sewage dry lines
mend deferral until high seasonal ground water can be determined if other
L3 10. This Department would recommend
considerations indicate approval.
❑ 11. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State
cowane Requlations.
❑ 13.
❑ 14.
We will re uire p
lans be submitted for a plan review for any:
❑ swimming Pools or spas
i food establishment ❑ grocery store
beverage establishment injection wells.
Infiltration beds for storm water disposal are considered shallow inj
submitted to CDHD.
❑ child care center
An application and fee must be
Reviewed By:
Review