Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Task Order 0596 d with JUB Engineers for South Black Cat Lift Station Improvements
TASK ORDER NO. 0596A Pursuant to the MASTER AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN CITY OF MERIDIAN (OWNER) AND JUB ENGINEERS, INC (ENGINEER) This Task Order is made this day of March, 2016 and entered into by and between the City of Meridian, a municipal corporation organized under the laws of the State of Idaho, hereinafter referred to as "City", and accepted by (JUB ENGINEERS, INC), hereinafter referred to as "Engineer" pursuant to the mutual promises, covenant and conditions contained in the Master Agreement (Category 2C) between the above mentioned parties dated September 22, 2015. The Project Name for this Task Order 0596.d is as follows: CITY OF MERIDIAN SOUTH BLACK CAT LIFT STATION IMPROVEMENTS - DESIGN I. PROJECT UNDERSTANDING A phasing plan was developed in May of 2014 which identified improvements and timing for conveyance systems in the Black Cat sewer shed. A subsequent evaluation was completed in June 2015 which outlined specific improvements to increase pumping capacity at the South Black Cat Lift Station (SBCLS). These services implement proposed improvements as defined herein, and which include the following general elements: 1. Upgrades to the SBCLS are considered by IDEQ as a material modification to an existing facility, and therefore require preparation of a Preliminary Engineering Report (PER) for review and approval by IDEQ. 2. Upgrades to SBCLS will include the following: A. Rebuild two (2) existing pumps and retain the third pump for back up. These pumps will serve the existing 10 -inch pressure sewer. Incorporate one (1) inline grinder the suction line of one pump. B. Install two (2) new 100 Hp pumps to serve the 18 -inch pressure sewer. One or more submersible motors will be used for flood protection. C. Remove the temporary wetwell knock out wall for utilization of the new 4th pump bay. D. Reconstruct the cross-over connection between the two pressure sewers outside of the building. Incorporate the previously designed cleaning station as a bid alternate into the construction documents. E. Evaluate electrical and control systems to accommodate the two larger pumps and design upgrades accordingly. The upgrade shall include the VFDs for the two (2) existing pumps. Improvements to SCADA, stand-by power generation, primary power, etc., are assumed to not be required. SCADA programming changes are included. Task Order 0596.d South Black Cat Lift Station Improvements - Design Page 1 of 7 JUB Engineers, Inc OWNER INFORMATION RESPONSIBLITIES and PROJECT ASSUMPTIONS 1. The City will provide J -U -B with the following: A. Available SCADA information at the SBCLS to estimate peak influent flows, pumping rates and discharge pressures. B. To provide cohesiveness with the CITY's overall SCADA system, the CITY will provide all SCADA system design, RTU, and equipment. C. Provide on-going review of J -U -B's work and timely consideration of policy issues within a time acceptable to the CITY and J -U -B. D. Provide a project manager to serve as a liaison with other City departments to facilitate the project reviews and input on the Task Order deliverables. E. The CITY will provide standard templates, ID codes, etc. for the design engineers use in completing the asset management subtask. 2. Project Assumptions: A. The updates to the Sewer Master Plan are currently being completed. For the purpose of this project, ultimate flows will be based on the 2010 Sewer Master Plan results. An addendum to the PER can be issued if ultimate flows appreciably change. For scheduling purposes, the PER will be completed in parallel and submitted with the pump upgrade design and construction plans. B. The CITY has implemented recent electrical upgrades at the SBCLS. Accordingly, no electrical upgrades other than VFD's are planned for utilization of the two new refurbished pumps (751-1p). Electrical controls and instrumentation will be required for the two (2) pumps (100 Hp). C. The proposed equipment modifications and replacements are assumed to be in substantial conformance with the original building permit issued in 2002-03 and will require no substantial building modifications. Therefore, no building permit will be required and the work can be completed with applicable trade permits submitted and secured by the General Contractor or corresponding subcontractors. 11. SCOPE OF WORK J -U -B's scope of services is specifically limited to the following: Task 1 — Project Meetings and Administration 1. Kickoff Meeting: Attend a kick-off meeting with CITY staff for the purpose of discussing the project approach, deliverables, schedule, and obtaining information that may be available from the CITY. 2. Progress and Site Meetings: Attend progress meetings with the CITY staff as needed to discuss project status, provide task order status summaries, present deliverables, and receive direction from the CITY. It is anticipated that two (2) additional meetings will be necessary. 3. Project Administration and Tracking. Monitor team progress, action item lists, task deadlines, items needed from the CITY, provide documentation, permitting milestones, and critical path items as needed. Task 2 — Preliminary Engineering Report (PER) 1. The proposed modifications to the SBCLS will require preparation of a preliminary engineering report (PER) as outlined in IDAPA 58.01.16.411. As this is an existing facility, the PER will focus on flow projections, wetwell sizing and phasing, and pump phasing and selection. The narrative will summarize the existing facility's systems such as electrical controls, back-up power, odor control, etc.; however, these systems will be evaluated in Task 4 — Subconsultant Services and briefly summarized in the PER. Task Order 0596.d South Black Cat Lift Station Improvements - Design Page 2 of 7 JUB Engineers, Inc A. Design Flows: Flows will be reiterated from the Lift Station Screening Evaluation completed in June 2015, SCADA information to estimate existing flows will be provided from another task order along with existing pump data. Future flows will be estimated using the analysis completed for the 2014 South Meridian phasing plan. Committed and ultimate flows will be estimated from the 2010 Sewer Master Plan. B. Wetwell Hydraulics: Hydraulics of the wetwell will be analyzed for the target pump upgrade flows. Ultimate wetwell sizing calculations will be taken from the original facility calculations for documentation to IDEQ. C. Pump Phasing: A pump and pressure sewer phasing analysis will be prepared for the current pump upgrades and future build -out condition. D. Pump Upgrade Selection: J -U -B will prepare the necessary hydraulic calculations to develop pump operating criteria. Research on preliminary selections shall be completed on a minimum of three (3) pump manufacturers of various drywell style pumps. Pump selections will focus on installation constraints, non -ragging performance, operation and maintenance. Final pump selection will be made collaboratively with Public Works Staff. E. Draft Report: A draft report shall be prepared summarizing the tasks above and providing a narrative description on the other IDEQ requirements listed in IDAPA 58.01.16.411. A draft PER will be submitted to the CITY for review and comment in conjunction with an internal quality control (QC) review by a J -U -B senior engineer. F. Final Report: Review comments will be collected and incorporated into the final report. Depending on timing, the final PER may be submitted to IDEQ with the construction plans and specifications. If timing allows, the PER will be submitted ahead of the construction plans. Deliverables: i. Four (4) copies of the Draft and Final PER, one (1) digital pdf. Task 3 — Pump Upgrade Final Design and Construction Plans 1. Lift Station Upgrade Design (75%) and Plans A. Final Design: Finalize pump upgrade selection and design piping to accommodate the new pump including sizing of face piping, interconnection with discharge header, new flow meter or relocation of existing, valving and related facilities. The existing pumps that are to be refurbished with new impellers and one pump shall be equipped with a suction line grinder. Final design will include removal of the wetwell knock out wall for the additional 4th pump bay. B. Upgrade Plans: Prepare plans on 11 "x17" sheets showing the demolition, piping and pumping upgrades. Develop a by-pass pumping phasing schematic plan sheet to allow installation of the pumping and piping upgrades with minimal secondary by-pass pumping. C. Incorporate the piping interconnections of the 10 -inch and 18 -inch pressure sewer, as previously designed, in to the construction plans. D. The previously designed 18 -inch pressure sewer cleaning station shall be modified to only include a removable spool into the valve vault for future line pigging and maintenance. This will be included as an additive alternate. E. Asset Management Incorporation: The upgraded components shall be identified and labeled on the construction plans per the nomenclature standards identified in the CITY's Asset Management policy. Assets involved will include pumps, valves, flowmeters, and electrical components. An inventory shall be prepared in a table and included with the technical specifications for use by the contractor. Task Order 0596.d South Black Cat Lift Station Improvements - Design Page 3 of 7 JUB Engineers, Inc F. Specifications: Prepare a technical specifications and special provisions using the 2012 ISPWC, and the CITY's supplemental specifications and standard drawings. CSI specification format may be used as special provisions. The contractor's performance requirements regarding the CITY's asset management inventory and listings will be incorporated into the specifications. A bid schedule will be prepared to delineate major work items. G. Prepare an opinion of probable construction cost. H. A senior level engineer will review perform a QC review of the 75% design and construction plans. I. Submit plans to the CITY for review and comment along with manufacturer product information on pumping, and flow measurement equipment. A review meeting will be held to gather comments as provided under Task 1. Deliverables: L 75% Complete Plans, four (4) copies, equipment data. ii. Opinion of probable construction costs. 2. 100% Complete Design and Construction Plans (Agency Review) A. Final Design: Revise the 75% complete plans per the CITY's review comment as appropriate. Finalize lift station hydraulics, VFD pumping analysis and pump selection for the new replacement pumps. Complete upgrade design of piping, valving, pipe supports, and related facilities, and incorporate revisions and new details into the plan set. B. Construction Plans and Detailing: Prepare 90% construction plans and detailing of the lift station facility including site civil, mechanical piping, structural and incorporated electrical plans and details. Plans and necessary details shall be prepared on 11 "x17" sheets. C. Specifications: Prepare a technical specifications and special provisions using the 2012 ISPWC, and the CITY's supplemental specifications and standard drawings. CSI specification format may be used as special provisions. A bid schedule will be prepared to delineate major work items. D. Quality Control Reviews: Complete an internal QC review with a senior J -U -B engineer. E. Construction Cost Estimate: Prepare revised opinion of probable construction cost. F. Submit 100% complete package to the CITY and IDEQ for review and comment. A review meetings will be held to gather comments as provided under Task 1. G. Incorporate applicable Agency or CITY comments and publish 100% complete Bid Ready plans and project manual. Deliverables: 100% Complete (Agency Review) Plans, Project Technical specifications, Bid Schedule, two (2) copies to CITY, one (1) hard copy and (1) printable electronic copy to IDEQ and other agencies. Final Opinion of Probable Construction Cost. Task 4 - Subconsultant Design Services For this task, J -U -B will retain the services of an Idaho licensed electrical engineering subconsultant to provide conceptual electrical system design for the PER and final electrical design services. The electrical design will encompass the design work necessary to incorporate the interim pump upgrade which includes two (2) new 100 Hp pumps and the one suction line grinder for the refurbished existing pump. The controls and equipment will be closely match with the existing equipment and I/C systems. Task Order 0596.d South Black Cat Lift Station Improvements - Design Page 4 of 7 JUB Engineers, Inc 1. PER Conceptual Control Plan: A. Prepare a conceptual instrumentation and control schematic plan. 2. 75% Electrical Design and Plans: Electrical preliminary design and plan preparation shall include: A. Coordinate with Idaho Power Company (IPCO) and evaluate the power transformer adequacy for the interim pump upgrade. B. Coordinate with IPCO on energy efficiency rebates for pump upgrades, VFDs and any other efficiency upgrades included in the project. C. Complete review of the existing stand-by diesel generator and ATS to accommodate the loads for the interim pump upgrade. D. Design two new pump level controllers, VFDs, PLC controllers, and other electrical controls and instrumentation systems into the existing control room. E. Design to include VO control panel for interface with the SCADA panels. F. Evaluate the existing UPS back up battery for controls and surge protection and design upgrades as necessary to accommodate the pump upgrades. G. Evaluate control room existing HVAC systems to determine if upgrades are required. H. Prepare 75% complete building electrical upgrade plans and details. 3. 100% Electrical Final Design and Construction Plans: A. Incorporate applicable CITY and J -U -B review comments and finalize design and equipment selections on electrical and control systems for the pump upgrades. B. Finalize control diagrams, one -line diagrams, and panel layouts. C. Design 1/0 control panel and related interfaces for the telemetry/SCADA systems. D. Design shall include a UPS system, surge protection, and a redundant level controller. E. Prepare CSI format specification for the special provisions. F. Meet with CITY building inspectors and operations staff to review design and resolve known code interpretations relevant to the project. G. Incorporate applicable CITY and J -U -B review comments and finalize 100% complete design and equipment selections on electrical and control systems for the lift station. 4. Energy Efficiency IPCO Incentive Coordination: The Electrical Subconsultant will coordinate with Idaho Power Company for energy efficiency grants rebates on qualifying equipment. The subconsultant shall prepare the necessary application submittal into IPCO. 5. Programming and Start-up Services: Refer to attached scope of services for programming PLC at the lift station and control software programming at the WWTP, and related start-up services. Task 5 — Bidding and Construction Services J -U -B will furnish the services specifically limited to the following at a time and materials, not to exceed basis. 1. Bidding Services: A. J -U -B's project manager/engineer shall assist the CITY in responding to technical questions that the CITY is unable to answer through review of the Contract Documents for CITY's use in preparation of addenda. J -U -B's electrical subconsultant will be available during the bidding process Task Order 0596.d South Black Cat Lift Station Improvements - Design Page 5 of 7 JUB Engineers, Inc B. If requested by the CITY, J -U -B will review the Bids and provide a recommendation for contract award. 2. Construction Services: J -U -B's project manager/engineer will be available during construction to assist the CITY as described below or specifically requested by the CITY: A. Preconstruction Conference: J -U -B will attend the pre -construction conference with the contractor, CITY, subconsultants, and agencies. B. Construction Assistance: J -U -B's project manager/engineer will be available during construction as requested by the CITY. Items that will be included in this portion of the task may include: i. Shop Drawing and Product Data Reviews: J -U -B will review shop drawing and product data submittals for compliance with the design and contract documents. J -U -B's electrical subconsultant will be available to review related electrical submittals. ii. Construction Administration: As requested by the CITY, J -U -B will assist the CITY in review of claims, change order and work directive preparation, address questions or RFI's, and other construction administration activities. J -U -B's electrical subconsultant will consult with J -U -B as appropriate. C. Commissioning: J -U -B will prepare a summary commissioning plan summarizing, contractor/supplier/manufacture training, overall facility start-up protocols, and testing requirements for submittal to the CITY for review. The J -U -B will submit the commissioning plan to the Contractor for comment and implementation. J -U -B shall conduct a walk through with the City, Contractor, and subconsultants, and prepare a tentative punchlist to supplement the City's RPR list. J -U -B will attend the facility start up. D. Record Drawings: J -U -B will prepare record drawings from drawings received from the Contractor, CITY's inspector, subconsultants, and per the CITY'S Record Drawing Requirements. Deliverables: i. One (1) paper set of the proposed record drawings to be reviewed by the CITY prior to submitting the final as shown below. ii. One (1) set of 11 "x17" record drawings. Each sheet will be sealed by a professional engineer with J -U -B standard disclaimer. iii. Two (2) CD's: One (1) will have the complete set of drawings in PDF format for submittal to DEQ and one (1) will have the complete set of drawings in PDF and AutoCAD format for CITY use. TIME OF COMPLETION and COMPENSATION SCHEDULE The following schedule is based on a Notice to Proceed (NTP) from the City by March 2016 and resulting in the Technical Memo being completed by May 2016. Bidding and construction services will follow the Technical Memo, with completion by September 2016. A NTP issued on a different date will change the schedule accordingly. Task Order 0596.d South Black Cat Lift Station Improvements - Design Page 6 of 7 JUB Engineers, Inc COMPENSATION AND COMPLETION SCHEDULE Task Description Due Date Compensation 1 Project Meetings and Administration On-going throughout other tasks $3,766 2 Preliminary Engineering Report and • Draft PER within 30 days of 3 Final Design Services receiving all necessary data 4 and information from the City. Final PER prior to or in $46,595 concurrence with final design. • Final Design within 60 days of receiving all City review comments. 5 Bidding and Construction Assistance ■ Completed as required by CITY's bidding and contract $16,755 award schedules. TASK ORDER TOTAL: $67,116 The Not -To -Exceed amount to complete all services listed above for this Task Order No. 0596.d is sixty seven one hundred sixteen dollars ($67,116). No compensation will be paid over the Not -to -Exceed amount without prior written approval by the City in the form of a Change Order. Any and all travel will only be reimbursed if pre -approved by the Project Manager, and only per the City of Meridian Travel Policy. Reimbursable expenses will be paid at cost and only if pre - approved by the Project Manager. Any travel and/or reimbursables paid will be paid as part of the Not -To -Exceed Task Order Total per the Compensation and Completion Schedule above. CITY OF MERIDIAN JUB E INEER , I C BY: BY TAMMY de T", MAYOR Dated: "tnrC 'V-\ y� l i� Approved by Counci MAHO JAYCEE TY CLERKnE Purchasing Approval BY: KEIT ,TS, Purc asing Manager City Project Manager Garrick Nelson Depar��nt Ap�r BY:. J WAR EN STE R , Engineerin�Manag�er�� Dated:: Task Order 0596.d South Black Cat Lift Station Improvements -Design Page 7 of 7 JUB Engineers, Inc 4J rt x i +1 u 0 1, m a P, x W N Orl o � � N n \ Cf a M legal \ m i 0 O N N i „ 43 N O V N Ln ,N Pa W U N .H x I \ U w O O \ 0 N 0 0 N in i4 m W N v a w 0 }, v m +) rl u 0 ow ow as ow 34 0 0 0 0 w u 0 0 0 0 0 rl 0 0 0 0 +1 •11 o 0 (D 0 41 N rl -1 -1 -1 -1 1~ b)•ri m m m m z3 b m m rn a U � m m m m f -I W N M M M M P a Pa rl u 0 w �o �o � 34 m m m m rs m m m m El H m a; m a, w •� m m m m 0 C m m m m ✓s •� m m m m z3 b m m rn a E m m m m m M M M M a rl u 0 0 0 0 0 34 o 0 0 0 ro m m m m El H C; 0 0 0 ro m m m C + P ro U w o q H C -P m m m m � U m m m m .Ly El: M M M M U rl u 0 w kc w �o m m m m m +' 4J ,]I~ m m m m El H m m m m i H w 0 m m m C 14 ro U w o q H v >~ m m m m ✓s v m m m m .Ly El: M M M M rl u 0 u u 0 ro +3 U) +3 0 o U U) a m w �WP] a b U Q El H ro ro +U 4J -14 H q o ro -i w a i H w 0 w w +, a E -i a P4 a F ro U w o q H JUBEN-1 OP ID: NW A4U" j`" CERTIFICATE OF LIABILITY INSURANCE DATE 09(MM/ 09/14/22015015 ) THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER The Hartwell Corporation -Cal PO Box 400 Caldwell, ID 83606 Jeremy Kroll CONTACT Jeremy Kroll PHONE208-459-1678 FAx A/c No Ext : UC N.I: 208 454-1114 E-MAIL ADDRESS: INSURERS) AFFORDING COVERAGE NAIC # A INSURER A: Travelers Indemnity of CT 25682 X INSURED J -U -B Engineers, Inc. 250 S Beechwood Ave, Suite 201 Boise, ID 83709 INSURER B: Travelers Casualty and Surety 31194 INsuRERc:Travelers Indemnity Co of Am. 25658 INSURER D: XL Specialty Insurance Co. 37885 INSURER E: A1111 PREMISES Ea occurrence $ 1,000,000 PREMISES INSURER F: COVERAGES CERTIFICATE NUMBER: RF~,nclnNl nulnnrxGa• THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. ILTR TYPE OF INSURANCE ADDL SD SUBR D POLICY NUMBER POLICY EFF MM/DDNYYY POLICY EXP MM/DDNYYY LIMITS A X COMMERCIAL GENERAL LIABILITY CLAIMS -MADE OCCUR X CGD381 X X 6807769N196 08/01/2015 08/01/2016 EACH OCCURRENCE $ 1,000,000 A1111 PREMISES Ea occurrence $ 1,000,000 PREMISES MED EXP (Any one person) $ 10,000 MED PERSONAL & ADV INJURY $ 1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: POLICY X JPRO E [X] LOC GENERAL AGGREGATE $ 2,000,000 PRODUCTS - COMP/OP AGG $ 2,000,000 $ OTHER: C AUTOMOBILE X LIABILITYCOMBINEDdent ANY AUTO BA7776NO68 08/01/2015 08/01/2016 SINGLE LKIMIT Eaacci$ 1,000,000 BODILY INJURY (Per person) $ AUTOS SCHEDULED AUTOS AUTOS BODILY INJURY Per accident $ ( ) X HIRED AUTOS NON -OWNED CAT353 AUTOS PROPERTY DAMAGE Per accident $ $ UMBRELLA LIAB OCCUR EACH OCCURRENCE $ EXCESS LIAR CLAMS -MADE AGGREGATE $ DED RETENTION $ $ B B WORKERS COMPENSATIONER AND EMPLOYERS' LIABILITY ANY PROPRIEfORJPARTNERJEXECUTIVE YIN OFFICER/tdEMBER EXCLUDED? (Mandatory in NH) Ifyes, describe under NIA UB0640T603 & WA STOP GAP 08/01/2015 08/01/2015 08/01/2016 08/01/2016 _ X STATUTE EOR H E.L. EACH ACCIDENT $ 1,000,000 E.L. DISEASE- EA EMPLOYEE $ 1,000,000 E.L. DISEASE -POLICY LIMIT $ 1,000,000 DESCRIPTION OF OPERATIONS below D Profes Liability DPR9721670 04/02/2015 04/02/2016 Ea Claim 5,000,000 $200,000 Deductibl INCL POLLUTION 04/02/2015 04/02/2016 Annl Aggr 5,000,000 DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached If more space Is required) Master Agreements for the Professional Services M ERI D04 City of Meridian 33 E Broadway Ave Meridian, ID 83642 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS, AUTHORIZED REPRESENTATIVE ©1988-2014 ACORD CORPORATION. All rights reserved. ACORD 25 (2014101) The ACORD name and logo are registered marks of ACORD 002219 COMMERICAL GENERAL LIABILITY THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. BLANKET ADDITIONAL INSURED (ARCHITECTS, ENGINEERS AND SURVEYORS) This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART A. The following is added to WHO IS AN INSURED (Section II): Any person or organization that you agree in a "contract or agreement requiring insurance" to in- clude as an additional insured on this Coverage Part, but only with respect to liability for "bodily in- jury", "property damage" or "personal injury" caused, in whole or in part, by your acts or omis- sions or the acts or omissions of those acting on your behalf: a. In the performance of your ongoing opera- tions; b. In connection with premises owned by or rented to you; or c. In connection with "your work" and included within the "products -completed operations hazard". Such person or organization does not qualify as an additional insured for "bodily injury", "property damage" or "personal injury" for which that per- son or organization has assumed liability in a con- tract or agreement. INSURANCE (Section III) for this Coverage Part. B. The following is added to Paragraph a. of 4. Other Insurance in COMMERCIAL GENERAL LIABILITY CONDITIONS (Section IV): However, if you specifically agree in a "contract or agreement requiring insurance" that the insurance provided to an additional insured under this Cov- erage Part must apply on a primary basis, or a primary and non-contributory basis, this insurance is primary to other insurance that is available to such additional insured which covers such addi- tional insured as a named insured, and we will not share with the other insurance, provided that: (1) The "bodily injury" or "property damage" for which coverage is sought occurs; and (2) The "personal injury" for which coverage is sought arises out of an offense committed; The insurance provided to such additional insured is limited as follows: d. This insurance does not apply on any basis to any person or organization for which cover- C. age as an additional insured specifically is added by another endorsement to this Cover- age Part. e. This insurance does not apply to the render- ing of or failure to render any "professional services". f. The limits of insurance afforded to the addi- tional insured shall be the limits which you agreed in that "contract or agreement requir- ing insurance" to provide for that additional insured, or the limits shown in the Declara- tions for this Coverage Part, whichever are less. This endorsement does not increase the limits of insurance stated in the LIMITS OF after you have entered into that "contract or agreement requiring insurance". But this insur- ance still is excess over valid and collectible other insurance, whether primary, excess, contingent or on any other basis, that is available to the insured when the insured is an additional insured under any other insurance, The following is added to Paragraph 8. Transfer Of Rights Of Recovery Against Others To Us in COMMERCIAL GENERAL LIABILITY CON- DITIONS (Section IV): We waive any rights of recovery we may have against any person or organization because of payments we make for "bodily injury", "property damage" or "personal injury" arising out of "your work" performed by you, or on your behalf, under a "contract or agreement requiring insurance" with that person or organization. We waive these rights only where you have agreed to do so as part of the "contract or agreement requiring insur- ance" with such person or organization entered into by you before, and in effect when, the "bodily CG D3 81 09 07 © 2007 The Travelers Companies, Inc. Page 1 of 2 Includes the copyrighted material of Insurance Services Office, Inc., with its permission. COMMERICAL GENERAL LIABILITY injury" or "property damage" occurs, or the "per- erage Part, provided that the "bodily injury" and sonal injury" offense is committed. "property damage" occurs, and the "personal in - D. The following definition is added to DEFINITIONS jury" is caused by an offense committed: (Section V): a. After you have entered into that contract or "Contract or agreement requiring insurance" agreement; means that part of any contract or agreement un- b. While that part of the contract or agreement is der which you are required to include a person or in effect; and organization as an additional insured on this Cov- c. Before the end of the policy period. Page 2 of 2 0 2007 The Travelers Companies, Inc. CG D3 8109 07 Includes the copyrighted material of Insurance Services Office, Inc., with its permission, IDSOS Viewing Business Entity Page 1 of 3 IDAHO SECRETARY OF STATE Viewing Business Entity Lawerence Denney, Secretary of State [ New Search ] [ Back to Summary ] [ Get a certificate of existence for J -U -B ENGINEERS INC ] [ Monitor J -U -B ENGINEERS INC business filings ) ® r 250 S BEECHWOOD AVE STE 201 BOISE, ID 83709 Type of Business: CORPORATION, GENERAL BUSINESS Status: GOODSTANDING 21 Mar 1969 State of Origin: IDAHO Date of 21 Mar 1969 Origination/Authorization: Current Registered Agent: PAUL D. FISK 250 S BEECHWOOD AVE STE 201 BOISE, ID 83709 Organizational ID / Filing C40668 Number: Number of Authorized Stock 100000 Shares: Date of Last Annual Report: 22 Jan 2015 Annual Report Due: Mar 2016 Original Filing: [ Help Me Print/View TIFF ] Filed 21 Mar 1969 INCORPORATION View Imaqe (PDF format) View Image (TIFF format) Amendments: [ Help Me Print/View TIFF ] Amendment Filed 05 Sun STOCK View Image (PDF format) View 1973 CHANGE Image (TIFF format) Amendment Filed 23 Apr STOCK View Image (PDF format) View 1975 CHANGE Image (TIFF format) Amendment Filed 07 Sun OTHER - View Image (PDF format) View 1979 APPT OF RA Image (TIFF format) Amendment Filed 02 Sep OTHER - CHG View Image (PDF format 1980 OF RA - ARLIN View Image (TIFF format) BROSKE, BOISE Amendment Filed 08 Dec ARTICLES View Image (PDF format) 1980 RESTATEMENT View Imaqe (TIFF format) Amendment Filed 08 Dec STOCK View Image (PDF format) View 1980 CHANGE Image (TIFF format http://www.accessidaho.org/public/sos/corp/C40668.html 11/24/2015 IDSOS Viewing Business Entity Page 2 of 3 [ Help Me Print/View TIFF ] Report for year 2015 ANNUAL REPORT View Document Online Report for year 2014 ANNUAL REPORT View Document Online Report for year 2013 ANNUAL REPORT View Document Online Report for year 2012 ANNUAL REPORT View Document Online Report for year 2011 ANNUAL REPORT View Document Online Report for year 2010 ANNUAL REPORT View Document Online Report for year 2009 ANNUAL REPORT View Document Online Report for year 2008 ANNUAL View Image (PDF format) View REPORT Image (TIFF format) Report for year 2007 ANNUAL View Image (PDF format) View REPORT Image (TIFF format) Report for year 2006 ANNUAL View Image (PDF format) View REPORT Imaae (TIFF format) Report for year 2005 ANNUAL View Image (PDF formai View REPORT Imacie (TIFF format) Report for year 2004 ANNUAL View Image (PDF format) View REPORT Image (TIFF format) Report for year 2003 ANNUAL View Image (PDF format) View REPORT Image (TIFF format) Report for year 2002 ANNUAL View Image (PDF format) View REPORT Image (TIFF format) Report for year 2001 ANNUAL _View Image (PDF format) View REPORT Image (TIFF format) Report for year 1999 ANNUAL View Image (PDF format) View REPORT Imaage TIFF format) Report for year 1998 ANNUAL View Image (PDF format} View REPORT Image (TIFF format) Report for year 1997 ANNUAL View Image(PDF format) View REPORT Image(TIFF forma Report for year 1996 ANNUAL View Image (PDF format) View REPORT Image (TIFF format) Report for year 1995 ANNUAL View Image (PDF format) View REPORT Image (TIFF format) Report for year 1994 ANNUAL View Image (PDF format) View REPORT Image (TIFF format, Report for year 1993 ANNUAL View Image (PDF format) View REPORT Image (TIFF format} Report for year 1992 ANNUAL View Image (PDF format) View REPORT Image (TIFF format) Report for year 1991 ANNUAL View Image (PDF format) View REPORT Image (TIFF format) Report for year 1990 ANNUAL View Image (PDF format) View REPORT Image (TIFF format) Report for year 1989 ANNUAL View Image (PDF format) View REPORT Image(TIFF format http://www.accessidaho.org/public/sos/corp/C40668.html 11/24/2015 IDSOS Viewing Business Entity Report for year 1988 ANNUAL REPORT Report for year 1987 ANNUAL REPORT Idaho Secretary of State's Main Pao Page 3 of 3 View Image (PDF format} View Imaae (TIFF format) View Imacie (PDF format) View Ima:ie (TIFF format) Comments, questions or suggestions can be emailed to: sosin -19 http://www.accessidaho.org/public/sos/corp/C40668.html 11/24/2015