Loading...
April 15, 2004 P&Z MinutesMeridian Planning & Zoning Commission April 15, 2004 Page 57 of 60 Hawkins-Clark: -- in the recommendations. We only include site specific and general conditions, not special considerations. Zaremba: Okay. Hawkins-Clark: Unless you want us to. Borup: Well, no, they were eliminated anyway. Zaremba: Okay. Borup: All right. So, two and three. Zaremba: All right. Continuing with the motion. On page eight, paragraph five, subparagraph B can be deleted. Again, on page eight, paragraph six, shall be changed to read: A permanent split rail fence, as proposed by the applicant, shall be constructed by the developer on the western boundary of Wingate Lane road easement. And in reference to paragraph 11, which begins on page eight, the applicant has answered that Nampa-Meridian Irrigation District will own and maintain the irrigation system. End of motion. Moe: Second. Borup: Motion and second. All in favor? Any opposed? MOTION CARRIED: THREE AYES. ONE ABSENT. Item 14: Public Hearing: RZ 04-006 Request for a Rezone of 16.1 acres from R-4 to R-8 zone for Sutherland Farm Subdivision No. 4 by Sutherland Farm, Inc. -east of South Eagle Road and north of east Victory Road: Item 15: Public Hearing: PP 04-009 Request for Preliminary Plat approval of 79 single-family residential building lots & 8 common lots on 16.1 acres in proposed R-8 zone for Sutherland Farm Subdivision No. 4 by Sutherland Farm, Inc. -east of South Eagle Road and north of east Victory Road: Item 16: Public Hearing: CUP 04-009 Request for modification of the original Conditional Use Permit for a Planned Development to allow the elimination of five ofFce lots and the addition of 47 single-family lots in addition to the 32 residential lots previously approved for a total of 79 single-family lots for Sutherland Farm Subdivision No. 4 with request for reduction to the minimum requirements for lot size, street frontage and front yard setbacks by Sutherland Farm, Inc. -east of South Eagle Road and north of east Victory Road:. Meridian Planning & Zoning Commission April 15, 2004 Page 58 of 60 Borup: Thank you. That concludes our hearings for this evening. We do have one other -- Zaremba: Do we need to open 14, 15 and 16 and continue them? Borup: Yes. I mean that concludes the items we were going to have hearings on. Yes, we still need to address -- oh, I'm looking at the wrong page. We need to address 14, 15, and 16. The proposal was to continue that to April 29th. Two of the Commissioners were here when all of these were continued the first time, so I don't know what your feelings are. What we have is one, two, three, four subdivisions on the agenda -- four -- Imean four residential subdivisions. No. I'm sorry. Zaremba: For the 29th? Borup: Yeah. Presently on the 29th we have Jaydan Village, which is a 16-acre R-8 subdivision. We have McNellis Subdivision, which is an L-O, C-G -- a commercial -- 16 commercial lot subdivision. Newton-Huckabay: There were quite a few people that showed up for the public hearing on that one last time. Borup: Okay. That's what I was going to ask. Maybe, staff, any comments on -- is the McNellis a pretty clean application? Do we know? It is the Southwood that the people were -- Newton-Huckabay: No. The industrial park there at the Ten Mile and Ustick or -- Borup: Okay. That's McNellis. Newton-Huckabay: McNellis. Yeah. There were quite a few people here for that. Borup: Okay. So, that may -- okay. And, then, we have Rock Creek, which is a down zone from L-O to R-15. Hawkins-Clark: I do believe that Rock Creek, Chairman Borup, will probably take some time. Borup: Oh, really? Okay. Hawkins-Clark: That one had -- Moe: Try and move it to the 5th of May. Borup: And, then, Caparelli is a little two acre two lot I-L zone subdivision. The last one is Southwood, which is a L-O R-15 on South Meridian.