HomeMy WebLinkAboutpressurized irrigation waiver Mayor Tammy de Weerd
City Council Members:
Elkiss:iiiimftinuf,oloro, Keith BirdJoe Gorton1
f/C/iffE Luke Cavener Genesis Milam
Ty Palmer Anne Little Roberts 1
October 15, 2015
Mr. Jeffrey Huber, VP
White-Leasure Development Co.
8385 W. Emerald Street
Boise, Idaho 83704
RE Shops at Victory Project—Waiver of Requirements under MCC 11-3A-15 to use surface 4
irrigation water for the pressurized irrigation system.
Dear Mr. Huber:
We have received your letter requesting a waiver of the requirements to use surface irrigation
water as your primary irrigation source for your Shops at Victory Subdivision project. At this
time we find that your supporting evidence does provide adequate proof that the surface water
distribution is inconsistent and not dependable for a pressurized irrigation system, and therefore
we are granting your request with the following condition:
The existing irrigation ditch crossing the property shall be relocated and piped in such a way
that it would not preclude the conversion and utilization of irrigation water in the future if better
supply becomes available. 1
This letter shall serve as our official decision and waiver of the requirements to utilize surface
irrigation water as the primary source for irrigation within the Shops at Victory Subdivision
project. By granting this waiver, we are hereby approving your use of domestic water as your
primary source for irrigation.
4
4
Sincer-ly,
,1
1
► Vt -- \____-----3.'--
J Warren Stewart, P.E.
City Engineer
f
cc. City Clerk
PW-Water Division
PW-Construction Division
Community Development Department
Public Works Department . 33 E Broadway Ave, Suite 200, Meridian, ID 83642
Phone 208-898-5500 . Fax 208-898-9551 . www.meridiancity.org
W
WHITE-LEASURE DEVELOPMENT COMPANY
January 18,2016
Meridian Public Works Department J'4N 9
Attn: Bruce Freckleton a•
33 East Broadway Ave. �—
Suite 200
Meridian, Idaho 83642
RE: Rite Aid—Eagle&Victory Road
Dear Bruce,
As per our meeting this morning White-Leasure Development Company is requesting a waiver
of the requirement for a pressurized irrigation system using water from the Nampa/Meridian
irrigation system. The reason for the waiver request is that at this particular location water
distribution is inconsistent and therefore,not dependable.
The project is a relatively small commercial development. The total square footage of proposed
landscaping has been calculated as per the attached letter from The Land Group.
Thank you for your consideration of our request. Please do not hesitate to contact me if you have
any questions.
Sincerely,
14-q4j‘- –
Je a C. Huber
Vice President/Broker
P.O. Box 1277 Boise, Idaho 83701-1277 • Telephone(208)345-1842 • FAX(208)343.3143
www.white-leasure.com
Jeff Huber
From: Jason Densmer <jason@thelandgroupinc.com>
Sent: Tuesday, December 22, 2015 2:35 PM
To: Jeff Huber
Cc: Ken Lenz; Bob Schafer
Subject: Victory Crossing - Eagle&Victory- landscape area calculations
Jeff:
We understand that you are considering supplying landscape irrigation for this project via a cross connection to the City
of Meridian's municipal water system.While this will require the City approve a variance,we are strongly supportive
since it will provide for a reliable water source to irrigate the project's landscape areas. We understand that the
available non-potable irrigation sources from the canals in the area cannot provide reliable water and would risk the
project's landscape health.
We have calculated the size of the project landscape areas as follows:
• Phase 1 developed landscape area: 40,000-sf
• Estimated future landscape to be added with development of Pad B and Pad C areas: 10,000-sf
Therefore the total estimated landscape area at complete site buildout will be 50,000-sf.
Please let me know if you have any questions.
Thanks,
principal civil engineer
jason densmer, pe
208.939.4041 p
462 e shore dr,ste 100
eagle,idaho 83616
kson(d.;theland_groupinc.com
THE LAND GROUP I the?.andgro9pinc.com
1
02/05/2016 10:31 2083441437 BOISE PROJECT PAGE 01/02
ROa PLATT OPERATING AGENCY FOR I67•tIO4
cmAIAMAN OF THE itoAP.n BOISE PROJECT BOARD OF CONTROL "`IRRIFR THE
GATIjON DISTRIcTSING
RICHARD M)RGOMO
long CHAIRMAN OH THE RonaO IFARMERLv BOISE V.R.RECLAMATION PROJECT)
TIMOTHY M.PAGE 244I5OVERLAND ROAD
PRoiECr MAN TIPR SOW!,IDAHn 037054155 NAMPA-MERIDIAN CT
BGI6E•KIINA DISTRICTTRICT
ROBERT 0.CARTER WILDER DISTRICT
ASPISTANT PRt7JecT MANAnaR NEW YORK 0 T
BIG SEND DISTRICT
APRYL GARDNER
$F.CRETARY•TREASURER
JERRI FLOYD
A3SI3TANT BECRETARY• tEL (208)34.1431
TREASURER
FAX:(208)344.1431
04 February 2016
White-Leasure Development Company
Attn.:Jeffrey C. Huber
8385 W. Emerald Street
Boise, Idaho 83704
RE: Rite Aid-Jeff Huber
SEC of S. Eagle Rd.&E. Victory Rd.
New York Irrigation District NY-578-012-00
McDonald Lateral 41+00
Sec. 28, T3N,R 1 E,B.M.
Jeffrey C.Huber:
The above-mentioned property is serviced by the United States' McDonald Lateral and is
a part of a rotation. A rotation is when there are two or more water users serviced by one
delivery point off of our system. This particular rotation has five water users on it and the
rotation manager is Mr. Bob Aldridge who is responsible for ordering the water and
setting up a schedule to accommodate the other users.
Whereas the Boise Project's water is mainly supplied from water held in storage from
Arrowrock and Anderson Ranch Reservoirs, the amount of water available varies from
year to year depending on weather conditions. Our water supply is also a finite resource
that needs to be managed by the end user to insure that they don't run out of water during
the middle of the summer months.
We strive to service our patrons in a reliable and consistent manner, however, our water
must be ordered 24 hours prior to wanting it, then used for a 24 hour block of time and
shut offs require a 24 hour notice. This is due to the fact that the Boise Project regulates
our canal systems up and down daily, depending on customer usage, to conserve this
precious water resource.
As this property is developed into a commercial center and the landscaping will be a
minimal portion of this property, the Boise Project can see where it may be more
practical to utilize city water in this case.
Local irrigation/drainage ditches that cross this property, in order to serve neighboring
properties,must remain unobstructed and protected by an appropriate easement.
02/05/2016 10:31 2083441437 BOISE PROJECT PAGE 02/02
if you have any further questions or comments regarding this matter, please do not
hesitate to contact me at(208)344-1141.
Sincerely,
Bob Carter
Assistant Project Manager BPBC
bdclbc
Cc: Clint McCormick Watermaster Div;2 BPBC
Velta Harwood Secretaryareasurer,NYI17
File