HomeMy WebLinkAboutChange Order No 2 with Keller Associats for Water Treatment Facility 27CONTRACT CHANGE ORDER CONTRACTOR: Keller Associates CHANGE ORDER NO, 2 CITY OF MERIDIAN The Contractor is hereby directed to make the following changes from the Contract Documents and Plans. 33 EAST BROADWAY PROJECT NO, 10492.a MERIDIAN, ID 83642 DATE: 1/20/2016 Reason for Change Order: EFFECTIVE DATE: 1/20/2016 CONTRACT CHANGE ORDER CONTRACTOR: Keller Associates PROJECT: Water Treatment Facility, Well tP 27 The Contractor is hereby directed to make the following changes from the Contract Documents and Plans. Description: Adding Construction Services to the Task Order Reason for Change Order: The City needs the Design Engineeer to provide Construction Services during construction and Recor Drawigns at the end of construction. Attachments: Engineer Scope of Services CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price $ $ 210,000.00 Original Contract Times: 365 Net changes form previous Change Orders Net changes form previous Change Orders No. -1— to _I— No.—_ Ito_ (calendar days) $ 7,300.00 167 Contract Price Prior to this Change Order: Contract Times prior to this Change Order: (calendar days) $ 217,300.00 532 Net Increase (decrease) of this Change Order: Net Increase (decrease) of this Change Order: (calendar days) $ 57,100.00 '199 Contract Price with all Approved Change Orders: Contract Times with all Approved Change Orders: (calendar days) $ 274,400.00 731 APPROVED: (CITY PURCH SI GE ACCEPTED: (Contractor) By: Keith Watts v X 'l Date: if //u Date: ii f RECOMMENDED: (Project Manager) CouncilApprov Date u ptiL Dean Stacey i{ A ,U Dafe: 20 Jan 2016 Date: V S1: CHANGE ORDER NO. 2 TO AGREEMENT FOR WELL 27 WATER TREATMENT FACILITY between KELLER ASSOCIATES, INC. and CITY of Meridian, ID TASK ORDER NO. 10492.A KA PROJECT NO. 214094-001 INTRODUCTION This change order modifies the Scope of Work and defines compensation for Engineering Services provided under the existing contract agreement between Keller Associates ("Consultant") and the City of Meridian, ID ("City") under the original contract agreement dated October 7, 2014. Any conflicting provisions will be resolved in favor of this addendum. This change order and agreement include construction administration, start-up, and programming services throughout construction of Well 27. SCOPE OF WORK L Engineering Services The information below summarizes the engineering services to be completed as part of this change order. For budgeting purposes the contraction schedule is assumed to be 6 months from Notice to Proceed to Final Completion. TASK 11: CONSTRUCTION ADMINISTRATION The Owner will oversee the construction administration efforts for the project. The Engineer will furnish support services specifically limited to the following. A. Preconstruction Conference The Engineer will attend a pre -construction conference for the project with the Contractor, Owner, and other parties. The Owner will chair the meeting. The Engineer will provide a draft agenda for the Owner's review and prepare meeting minutes. B. Submittal Reviews The Engineer will review technical submittals in a timely manner. For budget purposes it is assumed that each contractor submittal will not require more than two reviews. C. Requests for Information The Engineer will be available during construction on an as -needed basis, as requested by the Owner, to answer questions or provide clarifications of the plans and technical specifications. This task does not include time involved due to contractor errors and/or deviations from the construction documents. Task Order 10492.a 214094-001 Change Order 2 Page 1 of 3 D. Miscellaneous Construction Support The Engineer will be available during construction, as requested by the Owner, to review contractor pay applications, field orders, proposal requests, and change orders. It is understood that the Owner will contract directly with an independent testing agency. Engineer will be available to review testing results as requested by Owner. TASK 12: CONSTRUCTION MEETINGS AND OBSERVATION E. Construction Meetings and Observation The Engineer will be available to attend construction meetings and assist the Owner in making construction observations during construction. For budget purposes six meetings (monthly construction meetings) and five site visits are assumed. TASK 13: PROGRAMMING AND STARTUP ASSISTANCE F. Programming and Startup Assistance The Engineer's sub -consultant (DC Engineering) will program the PLC and HMI to meet current city standards, check 1/0 point connectivity, test the control system, configure communications to the Well 27 site, add alarms for existing Well and new Filter Buildings, coordinate programming efforts with Filter Supplier, and test remote control and alarm notifications. The Engineer will attend the startup and will assist in preparing a punchlist of outstanding contract items to be completed. The Owner will be responsible for issuing substantial and final completion. TASK 14: PROJECT CLOSEOUT G. Record Drawings and Operations and Maintenance Materials The Engineer will prepare record drawings from drawings and data received from the Contractor and Owner's staff. Operation and maintenance materials will also be reviewed by the Engineer. Upon approval of record drawings and operation and maintenance materials, Engineer will provide one full size hard copy, one set of electronic AutoCAD drawings, and one set in PDF format. The Engineer will prepare a spreadsheet of equipment identification numbers that correspond to the record drawings. Engineer will coordinate the tags with the City's Asset Management Department. Task Order 10492.a 214094-001 Change Order 2 Page 2 of 3 Compensation Tasks shall be completed on a time and materials basis based on the Consultants current title code billing rates as outlined in the original contract. While individual subtasks may be exceeded, the total time and material budget will not be exceeded without a written addendum. A breakdown of these costs is presented in Table 1. Table 1. SUMMARY of COMPENSATION All other items of the task order 10492.a for engineering services dated October 7, 2014 and change order 1 dated February 18, 2015 remain unchanged. Task Order 10492.a 214094-001 Change Order 2 Page 3 of 3 Keller — Meridian Contract Task Contract Amounts Adjustment Contract Amounts Including Change per Addendum Including Change Order #1 #2 Order #2 01 -Project Management and Administration $13,000 NA $13,000 02 - Pilot Test (City to determine if $18,000 $18,000 necessary after well remediation by NA others) 03 - Public Meeting and Zoning $4,000 NA $4,000 Requirement if necessary) 04 - Iron and Manganese Removal $15,000 NA $15,000 Equipment Procurement Package 05 - Bidding Assistance - Equipment $5,000 NA $5,000 Procurement 06 - Survey and Mapping $7,000 NA $7,000 07 - Preliminary Engineering Report $29,000 NA $29,000 08 - Final Design for 90% and 100% $107,300 NA $107,300 Submittal 09 - Bidding Assistance - Construction $14,000 NA $14,000 of the Water Treatment Facility 10 -Agency Coordination, Meetings $5,000 NA $5,000 and Permitting 11 — Construction Administration Submittals, RFI's, etc. NA $28,550 $28,550 12 — Construction Observation and NA $8,440 $8,440 Meetings 13 — Startup Assistance and Programming NA $14,880 $14,880 14 — Project Closeout (Record NA $5,230 $5,230 Drawings, O&M, etc. Total Contract Amount 1 $217,300 $57,100 $274,400 All other items of the task order 10492.a for engineering services dated October 7, 2014 and change order 1 dated February 18, 2015 remain unchanged. Task Order 10492.a 214094-001 Change Order 2 Page 3 of 3 IDSOS Viewing Business Entity Page 1 of 2 ' IDAHO SEC RTA RY OF TATE Viewing Business Entity Lawerence Denney, Secretary of State [ New Search ] [ Back to Summary ] [ Get a certificate of existence for KELLER ASSOCIATES INC. ] [ Monitor KELLER ASSOCIATES INC. business filings ] KELLER ASSOCIATES, INC. 131 SW 5TH AVE STE A MERIDIAN, ID 83642 Type of Business: CORPORATION, GENERAL BUSINESS Status: GOODSTANDING State of Origin: IDAHO Date of 02 Oct 2007 Origination/Authorization: Current Registered Agent: ROD J LINDA 131 SW 5TH AVE SUITE A MERIDIAN, ID 83642 Organizational ID / Filing C175282 Number: Number of Authorized Stock 15000 Shares: Date of Last Annual Report: 04 Sep 2015 Annual Report Due: Oct 2016 Filed 02 Oct 2007 INCORPORATION Amendment Filed 02 May ARTICLES 2008 RESTATEMENT Report for year 2015 ANNUAL REPORT [ Help Me Print/View TIFF ] View Image (PDF format) View Image (TIFF format) [ Help Me Print/View TIFF ] View Image (PDF format) View Image (TIFF format) [ Help Me Print/View TIFF ] View Document Online Report for year 2014 ANNUAL REPORT View Document Online Report for year 2013 ANNUAL REPORT View Document Online Report for year 2012 ANNUAL REPORT View Document Online Report for year 2012 CHNG View Image (PDF format) View RA/RO Image (TIFF format) Report for year 2011 ANNUAL REPORT View Document Online Report for year 2010 ANNUAL REPORT View Document Online Report for year 2009 ANNUAL REPORT View Document Online http://www.accessidaho.org/public/sos/corp/C175282.html 1/22/2016 IDSOS Viewing Business Entity Page 2 of 2 Report for year 2008 CHNG View Imaqe (PDF format) View OFF/DIR Image (TIFF format) Report for year 2008 ANNUAL REPORT View Document Online Idaho Secretary of State's Main Page State of Idaho Home Page Comments, questions or suggestions can be emailed to: sosinfoCa sos.idaho.gov http://www.accessidaho.org/public/sos/corp/C175282.html 1/22/2016