Loading...
HomeMy WebLinkAboutTask Order 10615 a with Bowen Collins for Controls Design and ProgrammingTASK ORDER NO. 10615.a Pursuant to the MASTER AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN CITY OF MERIDIAN (OWNER) AND BOWEN COLLINS & ASSOCIATES (ENGINEER) This Task Order is made this 17th day of November, 2015 and entered into by and between the City of Meridian, a municipal corporation organized under the laws of the State of Idaho, hereinafter referred to as "City", and accepted by (BOWEN COLLINS), hereinafter referred to as "Engineer" pursuant to the mutual promises, covenant and conditions contained in the Master Agreement between the above mentioned parties dated July 2, 2014. The Project Name for this Task Order 10615.a is as follows: CITY OF MERIDIAN CONTROLS DESIGN AND PROGRAMMING - PRV 11 3 & 7 Control System Upgrades SCOPE OF WORK Our scope is to provide control panel design services to replace the existing SCADA PACK PLC's at the following sites; PRV 1, 3 & 7. The control panel will be designed to utilize existing instrumentation and provide spare 1/0 for future use. Our scope also includes control panel programming services to start-up the new control panel that will be constructed and installed at PRV 1, 3 & 7 sites. Task 1 - Design Services • Site survey to identify existing 1/0. • Develop 1/0 list for current and future needs. • Provide control panel drawings suitable for construction. • Provide bid documents (specifications as needed). Deliverables • 90% review documents. • 100% Construction documents incorporating review comments. Task 2 - Bidding Services Create bid schedule • Attend kickoff meetings • Answer bidding questions Task Order 10615.a Controls Design and Programming -Well 31 control system upgrades Page 1 of 3 BOWEN COLLINS Deliverables • Bid schedule Task 3 — Construction Management Services • Review submittals for control panel hardware • Review submittals for instrumentation Deliverables • Submittal review Task 4 - Programming Services • Program PLC and HMI and provide onsite start-up for PRV 1, 3 & 7 • Program MDS radio and provide onsite start-up for PRV 1, 3 & 7 Deliverables Electronic copy of the PLC and HMI programs that are created and modified during the project. While preparing our scope of services and fee estimate, we have made the following assumptions: • On Site installation of new SCADA control panel, power quality monitoring panel, and all instrumentation will be complete before BC&A integrator is called out to verify 1/0 loop checks and deploy programming. • The remote site communication will utilize the GE MDS 900Mhz radio network. • On Site verification of the radio path study would not be required. TIME OF COMPLETION and COMPENSATION SCHEDULE The following schedule is based on a Notice to Proceed (NTP) from the City by November 2, 2015 and resulting in Final Design Documents completed January, 31, 2016 and Final Programming completed by April 30, 2416. A NTP issued on a different date will change the schedule accordingly. COMPENSATION AND COMPLETION SCHEDULE Task Description Due Date Compensation 1 Design Services ■ 1/31/2016 ■ $25,800 2 Bid Services ■ 2/28/2016 ■ $1,300 Task Order 10615.a Controls Design and Programming - Well 31 control system upgrades Page 2 of 3 BOWEN COLLINS 3 Construction Management Services ■ 3/30/15 $1,500 3 Programming Services ■ 4/30/2016 $26,000 TASK ORDER TOTAL $54,600 The Not -To -Exceed amount to complete all services listed above for this Task Order No. 10615.a is fifty four thousand six hundred dollars ($54,600). No compensation will be paid over the Not -to -Exceed amount without prior written approval by the City in the form of a Change Order. Travel and meals are excluded from this Task Order unless explicitly listed in the Scope of Services AND Payment Schedule. CITY OF MERIDIAN BOWEN COLLINS & ASSOCIATES ,, BY: BY: D\A/1.(,l.,Q aaAka , CatAd i l�ir2Slr f — Dated: 11 cam Dated: T Approved by,Council:/jjow"-� i City of HOLMAN, CITY CL �� SEAQ Purchasing Approval Pati I orks artment Approval BY: B ' KEITH , TTS, Pu ehasing Manager W RREN ST WART, Engineering Manager City Project Manager Clint Worthington, Staff Engineer II Dated: ,(f%665 Task Order 10615.a Controls Design and Prdgramming -Well 31 control system upgrades Page 3 of 3 BOWEN COLLINS City Of Meridian Detailed Statement of Revenues and Expenditures - Rev and Exp Report - Keith - Unposted Transactions Included In Report 3490 - Water Construction Projects 60 - Enterprise Fund From 10/1/2015 Through 9/30/2016 Budget with Current Year Amendments Actual Percent of Budget Budget Remaining Remaining Capital Outlay 94300 Capital - Electronics 1053... McMillan PRV SCADA Cabinet 0.00 23,450.00 (23,450.00) 0.00°% SCADA SCADA 300,000.00 0.00 300,000.00 100.00°% Total Capital Outlay 300,000.00 23,450.00 276,550.00 92.180 TOTAL EXPENDITURES 300,000.00 23,450.00 276,550.00 92.180 Date: 11/12/15 12:16:39 PM Page: 1