HomeMy WebLinkAboutTask Order 10618 a with Civil Survey Consultants for W Washington to NW 4th Sewer Line ReplacementTASK ORDER NO. 10618.a Pursuant to the MASTER AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN CITY OF MERIDIAN (OWNER) AND CIVIL SURVEY CONSULTANTS (ENGINEER) This Task Order is made this 4th day of November, 2015 and entered into by and between the City of Meridian, a municipal corporation organized under the laws of the State of Idaho, hereinafter referred to as "City", and accepted by CIVIL SURVEY CONSULTANTS, hereinafter referred to as "Engineer" pursuant to the mutual promises, covenant and conditions contained in the Master Agreement (Category 2c) between the above mentioned parties dated October 22, 2013. The Project Name for this Task Order 10618.a is as follows: CITY OF MERIDIAN SEWER LINE REPLACEMENT WEST WASHINGTON ST — NW 4T" TO NW 1 ST STREET DESIGN PROJECT UNDERSTANDING The City has identified a need to replace the existing 8" sewer mains that run across backyards to the north and south of W. Washington Street between NW 4th Street and NW 1St Street. The Engineer shall provide professional engineering services related to the design of approximately 1,000 linear feet of 8" sewer main in W. Washington Street (NW 4th Street to NW 1St Street) and approximately 350 linear feet of 8" sewer main in NW 1St Street. Twelve homes and Meridian Elementary are currently connected to the existing sewer main south of Washington Street. These connections shall be transferred to the new sewer mains in Washington Street and NW 1St Street. There are two homes along NW 4th Street that are possibly currently connected to the existing sewer main south of Washington Street. If the two homes are connected to the existing sewer main south of Washington Street then they shall be transferred to the existing sewer main in NW 4th Street. Twelve homes along Washington Street are currently connected to the existing sewer main north of Washington Street. These connections shall be transferred to the new sewer main in Washington Street. The home at 1217 NW 1St Street shall have its service connection transferred to the new sewer main in NW 1St Street. The homes along the east side of NW 1St Street that front the new sewer main shall have new sewer service lines stubbed to the public right-of-way line. We anticipate this to be a total of 7 properties. Task Order 10618.A — Sewer Line Replacement - West Washington Street — NW 4'h to NW 151 Street - Design Page 1 of 5 Civil Survey Consultants The existing 8" sewer mains that run across backyards to the north and south of W. Washington Street between NW 4th Street and NW 1" Street shall be abandoned as part of this project. It is our understanding that the homes in W. Cherry Avenue are connected to the existing sewer main in W. Cherry Avenue and are not currently connected to the existing sewer main that runs across the back of their property. 6-1"S [a :RTI • Task 1 — Administration 1.1 This task includes duties associated with setting up the contract, submitting monthly invoices and ongoing project management. Task 2 — Surveying and Data Collection 2.1 This task includes field work associated with performing topographic survey required to complete the design. Topographic survey shall cover any necessary items within the public right-of-way. Topographic surveys shall not be conducted on each individual property. Existing sewer service cleanouts shall be surveyed at each property if they are visible at the ground. We anticipate that most properties will not have cleanout and we will survey the point where the sewer service leaves the building. 2.2 This task includes office work associated with drafting any additional topographic survey and establishing necessary property lines. We anticipate that for the purposes of this project we will be able to define the existing public right-of—way and property lines from record drawings and subdivision plats recorded with Ada County. 2.3 This task includes office work associated with contacting each property owner scheduling an appointment to complete necessary surveying and to visually inspect their property and identify existing sewer service location. 2.4 This task includes office and field work associated with conducting an inspection of each property and taking a digital photograph of the anticipated sewer service route at each property. Photographs shall be indexed and included as part of the project specifications. 2.5 This task includes work associated with reviewing the CCTV of the existing sanitary sewer mains to determine the location of existing sewer services and plotting them on the plans. City shall provide CCTV reports and video of the existing sewer main. 2.6 This task includes office and field work associated with potholing the existing roadway to establish pavement restoration requirements. The existing roadway Task Order 10618.A — Sewer Line Replacement - West Washington Street — NW 41" to NW iso Street - Design Page 2 of 5 Civil Survey Consultants shall be potholed at two locations on W. Washington Street and one location on NW 1St Street. Task 3 — Design Improvements 3.1 This task includes designing sewer main improvements. 3.2 This task includes designing sewer service improvements. Sewer service routes will generally be shown on construction plans with a reference to digital photograph of each property and proposed route in project specifications. Task 4 — Construction Document Preparation and Review 4.1 Develop plans, specifications, cost estimate and bid schedule that meet current design standards and standard specifications of the City and the ISPWC. Technical Specifications will conform to the formatting of the ISPWC. • A Traffic Control Plan will be prepared and included in the construction plans. The traffic control plan will be submitted to ACHD for review. Engineer will revise plans as necessary and resubmit. o The contractor will use the plan to assist in obtaining a permit from ACHD. o The contractor will make all necessary revisions to the traffic control as required by ACHD. • An Erosion and Sediment Control Plan (ESCP) will be prepared and submitted to the City and ACHD for review. The ESCP will be prepared in accordance with the City of Meridian Construction Stormwater Management Program. Engineer will revise plans as necessary and resubmit. 4.2 Submit five (5) full size copies of plans and two (2) copies of specifications to City Engineering for departmental review and comment. Engineer will revise plans as necessary and resubmit. 4.3 Submit three (3) full size copies of revised plans and one (1) set of specifications to City Engineering for Development Services and Environmental review. Engineer to revise plans as necessary and resubmit. 4.4 Submit one (1) full size copies of plans and specifications to ACHD for review and approval. Engineer will revise plans as necessary and resubmit. 4.5 Submit four (4) full size copies of plans and one (1) set of specifications to City Engineering for QLPE review and approval. Engineer will revise plans as necessary and resubmit. Task Order 10618.A — Sewer Line Replacement - West Washington Street — NW 4" to NW 1" Street - Design Page 3 of 5 Civil Survey Consultants 4.6 Prepare final construction documents with inclusion of any changes from the review phases and provide the following copies during and after the bidding phase: • Five (5) copies for bid and distribution purposes along with a PDF copy of the plans and specifications. • Up to five (5) copies for contractor's use. Task 5 — Construction Services 5.1 Provide one set of construction stakes for the design improvements. We anticipate that all staking will be completed in four trips to the site. Staking shall be completed within 48 hours when requested in writing by the Contractor. Stakes shall be provided for each sewer manhole and each sewer service at the right-of-way line. 5.2 Engineer will attend the pre-bid meeting. 5.3 Engineer will attend the pre -construction meeting. 5.4 Answer RFI's from contractor during bidding and construction about the design. 5.5 Review material specifications submitted by contractor. 5.6 Engineer with attend onsite meetings with the City and property owners during construction as requested by the City. 5.7 Prepare record drawings meeting the City of Meridian Acceptance of Record/Electronic Drawings, dated January 28, 2015. ASSUMPTIONS • Right-of-way or boundary surveys are not included in this scope of work. Easement preparation is not part of the scope of work. • Title reports are not part of the scope of work. • Easements are not part of this scope. • City will provide contact information for each property and assist the Engineer in receiving permission from each property owner to complete work. • Service will only be provided to property owners that will consent to work. City will assist with consent process if necessary. The following schedule is based on a Notice to Proceed (NTP) from the City by November 2015 and Final Plans by September 2016. A NTP issued on a different date will change the schedule accordingly. Task Order 10618.A — Sewer Line Replacement - West Washington Street — NW 41h to NW is' Street - Design Page 4 of 5 Civil Survey Consultants COMPENSATION AND COMPLETION SCHEDULE Task Description Due Date Compensation 1 Administration a 30 days after completion of construction $484.00 2 Surveying and Data Collection ® September 2016 $23,520.00 3 Design Improvements ■ September 2016 $4,719.00 4 Construction Documents ® September 2016 $19,620.00 5 Construction Services • 30 days after completion of construction $9,630.00 Misc. Printing and Potholing ® 30 days after completion of construction $1,025.00 TASK ORDER TOTAL: $58,998.00 The Not -To -Exceed amount to complete all services listed above for this Task Order No. 10618.a is Fifty -Eight Thousand Nine Hundred Ninety -Eight dollars and 00/100 ($58,998.00). No compensation will be paid over the Not -to -Exceed amount without prior written approval by the City in the form of a Change Order. Any and all travel will only be reimbursed if pre - approved by the Project Manager, and only per the City of Meridian Travel Policy. Reimbursable expenses will be paid at cost and only if pre -approved by the Project Manager. Any travel and/or reimbursables paid will be paid as part of the Not -To -Exceed Task Order Total per the Compensation and Completion Schedule above. CITY OF MERIDIAN BY - TAMMY de WE, MAYOR Dated: Approved by Counci CIVIL SURVEY CONSULTANTS } BY: COREY PEACOCK, Principal Dated: f /5 ZGO ?<i v of TARN*-, CE HOLMAN, CI Y CLE '°A""') SEAL w r � Purchasing An pro al �I ,'r```' BY: KE, A S, W06asing Manager City Project Manager Garrick Nelson Approval ZRREN STE/WART Engineering Manager Dated: lel'z F // Task Order 10618.A — Sewer Line Replacement - West Washington Street — NW 0 to NW 15t Street - Design Page 5 of 5 Civil Survey Consultants IDSOS Viewing Business Entity Page 1 of 2 f IDAHO SECRETARY OF STATE �f4 Viewing Business Entity NA ,: Lawerence Denney, Secretary of State [ New Search ] [ Back to Summary ] [ Get a certificate of existence for CIVIL SURVEY CONSULTANTS INC. ] [ Monitor CIVIL SURVEY CONSULTANTS, INC. business filings ] CIVIL SURVEY CONSULTANTS, 2893 SOUTH MERIDIAN ROAD MERIDIAN, ID 83642 Type of Business: CORPORATION, GENERAL BUSINESS Status: GOODSTANDING 27 Nov 1992 State of Origin: IDAHO Date of 27 Nov 1992 Origination/Authorization: Initial Registered Agent: GLENN K BENNETT 42 PEREGRINE DRIVE BOISE, ID 83716 E Organizational ID / Filing C100243 Number: Number of Authorized Stock 1000 Shares: Date of Last Annual Report: 17 Sep 2015 Annual Report Due: Nov 2016 Filed 27 Nov 1992 INCORPORATION Report for year 2015 ANNUAL REPORT Report for year 2014 ANNUAL REPORT Report for year 2013 ANNUAL REPORT Report for year 2012 ANNUAL REPORT Report for year 2011 ANNUAL REPORT Report for year 2010 ANNUAL REPORT Report for year 2009 ANNUAL REPORT [ Help Me Print/View TIFF ] View Image (PDF format) View Image (TIFF format) [ Help Me Print/View TIFF ] View Document Online View Document Online View Document Online View Document Online View Document Online View Document Online View Document Online Report for year 2008 ANNUAL REPORT View Document Online Report for year 2007 ANNUAL REPORT View Document Online Report for year 2006 ANNUAL View Image (PDF format)- View REPORT Image (TIFF format) Report for year 2005 ANNUAL View Image (PDF format) View REPORT Image (TIFF format) http://www.accessidaho.org/public/sos/corp/Cl00243.html 10/12/2015 IDSOS Viewing Business Entity Report for year 2004 ANNUAL REPORT Report for year 2003 ANNUAL REPORT Report for year 2002 ANNUAL REPORT Report for year 2001 ANNUAL REPORT Report for year 2000 ANNUAL REPORT Report for year 1999 ANNUAL REPORT Report for year 1998 ANNUAL REPORT Report for year 1997 ANNUAL REPORT Report for year 1996 ANNUAL REPORT Report for year 1995 ANNUAL REPORT Report for year 1994 ANNUAL REPORT Report for year 1993 ANNUAL REPORT Page 2 of 2 View Image (PDF format) View Idaho Secretary of State's Main Page State of Idaho Home Page Comments, questions or suggestions can be emailed to: sosinfo2sos.idaho.gov http://www.accessidaho.org/public/sos/corp/Cl00243.html 10/12/2015 Image (TIFF format) View Image (PDF format) View Image (TIFF format) View Image( PDF format) View Image (TIFF format) View Image (PDF format) View Image (TIFF format). View Image (PDF format) View Image (TIFF format) View Image (PDF format) View Image (TIFF format) View Image (PDF format) View Image (TIFF formatl View Image (PDF format) View Image (TIFF format) View Image (PDF format) View Image (TIFF format) View Image (PDF format) View Image (TIFF format) View Image (PDF format) View Image (TIFF format) View Image (PDF format) View Image(TIFF format) Idaho Secretary of State's Main Page State of Idaho Home Page Comments, questions or suggestions can be emailed to: sosinfo2sos.idaho.gov http://www.accessidaho.org/public/sos/corp/Cl00243.html 10/12/2015 All V rd t� N N O N �i W � N 0 cid N Cq o f a� m 0 S4 FI 0 0 � H p G 4 in 41 W U N o io 0 q i o 0 N m p m W �i 44 O V N 8 4 ro +) m I �d .n a. ao a w a- a a r aO ut Ln H 0 0 0 0 o w co m OD 0 0 o O o 0 co co 44 bi O C o 0 0 0 o vi vi 1� 4-) •ri o o m m m 4J aN 0 H C tn•ri v� E N W N a P4 0 0 o O m o O o q 0 0 rH w r t) r- 4-) 41 •91 o oN vi m m m a) q o r w N r o 0 0 8 N W W h o 0 0 0 0 0 ri N N N 0 0 O 0 0 0 O 0 N O O o 0 0 o O o C3 CD o00 Oo OD l) W N M M M N U N W coo W Ft� �H W � U w 0 O o w 0 0 0 ul o o O o m o 0 0 •r4Ji ) O o O o d' m m vt 3 o ut ut Lr) Ln o W W W W N F v M W 0 O c3 w W O O O a •� ani �04 •p `-1i a w � 4.).) 1-1 N p 0 P4 W a) Pi 3 0 N 1 zS Id xw x a � a a� U 14 0 xvo rd (DId o 44 U q .0 U N A S4 0 0 N N q 2 N bi N N N N r� N �4 2, W .� 0 0 3NN 3 NCL N(d w a jr♦ a(nn ip N W R 40)) � P�'� 1 U H W W Pa Pi U Q H I �d .n ro o Ln Ln 44 t M rl r O rl ut Ln H 0 O O O m O LO rl ri H U m I �d