HomeMy WebLinkAboutExecuted Change Order No 1 with Cascade Enterprises for the WWTP Safety UpgradesCITY OF MERIDIAN
33 EAST BROADWAY
MERIDIAN, ID 83642
CONTRACT CHANGE ORDER
CHANGE ORDER NO. 1
PROJECT NO,
10507.13
DATE:
5119/2016
EFFE=CTIVE DATE:
6/1912015
Contractor Is horoby directed to make file following changes from the Contract Doculnents and Plans,
E CONTRACTOR PRESENTED A BI=TTER SOLUTION FOR THE DIGESTER #3 STAIRS AND A
W LADDER TO ACCESS THE TOP OF THE DIGESTER.
Reason for Chante order:
THE CONTRACTOR PRESENTED A BETTER SOLUTION FOR THE DIGESTER #3 STAIRS TO
MODIFY THE ANGLE THE STAIRS WERE PLACED AND ADJUST THE WIDTH. ALSO THE
EXISTING LADDER TO THE ROOF OF THE DIGESTER WAS REPLACED WITH A NEW LADDER
THAT TIED INTO THE NEW STAIRS AND PLATFORM.
imonts:
TRACTOR ESTIMATE
CHANCE IN CONTRACT PRICE:
CHANGE IN CONTRACT TIMES:
Original Contract Price $ $ 48,928.00
Original Contract Times: 60
Not changes form previous Change Orders
Net changes form previous Change Orders
No.` to _
No.` to ._._. (calendar days)
$
0
Contract Price Prior to this Change order:
Contract Times prior to Ihis Change Order;
(calandar days)
$ 48, 928.00
60
Net Increase (decrease) of this Change order:
Net Increase (decrease) of this Change Order:
(calendardays)
$ 11,072.00
60
Contract Price with all Approved Change Orders:
Contract Times with all Approved Change Orders:
(calendar days)
$ 60,000.00
120
APPROVED: (CITY PURCHASING AGEN
ACCEP�gD, onlractof) CAS E F RPMMS
By: Keith Walls
µ V Y
Date:f 5/
Date:
RECOMMi?NDE,V•(ProjectMa get) ,
Garrfck'twlelsan `"�'
Date: 19 May -15 0 X19
o
co
sT
?
APPROVED: (CITY)
ATTER
of
`+
CCity
EP
By:' "M I
IA
rk Jaycee L. Holman
\0R00
Date: —71'7/, , ' `" SEAL
a e' w Z
rAFAsu�
Cell: (208) 999-7148
Office: (208) 343.4009
Fax: (208) 343-4838
7512 Lemhi St, Suite 3 - Boise, ID 83709
ryan@cascade-enterprises.com
03/03/15 Project #10029A PWC -C -003516 -AA -1-3-4
Emily Skoro,
C/o City of Meridian
33 E. Broadway Ave.
Suite 200
Meridian, ID 83642
Re: W WTP Safety Improvement Project Digester No.3 Alternate Pricing
Scope of Work: Access Stairs & Cantilevered Platform:
1) Galvanized Stairway w Aluminum Handrail & Cantilevered Landing (Straight) .................$ 18,860.00
a. Includes Saw -cutting Existing Asphalt
b. Includes 3ea 8" X 24" X 48" Slab Footings
C. Includes Mid -Landing at half -way point of stairs
d. Includes Ships Ladder Access to Digester Lid
e. Includes Shop Drawings
f. Does not Include Engineering
Original Scope @ Digester Access:
1) Platform & Access Modifications .................... .......... .................. ...................................... ......... -$ 9,516.00
Total Change (Add) to Original Contract:
1) New Stair Proposed less Original Scope......................................................................................$ 9,344.00
a. Request additional 20 days for Change in Scope (pending approvals)
Final Design Additions:
1) Grating & Treads $ 698.00
2) Channel/HSS $ 473.67
3) Extra lbs to Galvanize $ 339.78
4) Detailing $ 500.00
5) Railing $ 992.00
6) Labor S 520.00
7) Sub total $ 3,523.45
8) Subs OH& P @ 15% $ 528.52
9) Cascade OH& p @ 10% $ 405.20
10) Cost Impact $ 4,457.17
Total Change (Add) to Original Contract
1) Upon Approval of Additional Costs.............................................................................................$ 13,801.17
Sincerely,
Ryan Steinwand
Account/Project Manager
"We Specialize in helping clients meet their business demands".