HomeMy WebLinkAboutExecuted Change Order No 1 with Cascade Enterprises for the WWTP Safety UpgradesCITY OF MERIDIAN 33 EAST BROADWAY MERIDIAN, ID 83642 CONTRACT CHANGE ORDER CHANGE ORDER NO. 1 PROJECT NO, 10507.13 DATE: 5119/2016 EFFE=CTIVE DATE: 6/1912015 Contractor Is horoby directed to make file following changes from the Contract Doculnents and Plans, E CONTRACTOR PRESENTED A BI=TTER SOLUTION FOR THE DIGESTER #3 STAIRS AND A W LADDER TO ACCESS THE TOP OF THE DIGESTER. Reason for Chante order: THE CONTRACTOR PRESENTED A BETTER SOLUTION FOR THE DIGESTER #3 STAIRS TO MODIFY THE ANGLE THE STAIRS WERE PLACED AND ADJUST THE WIDTH. ALSO THE EXISTING LADDER TO THE ROOF OF THE DIGESTER WAS REPLACED WITH A NEW LADDER THAT TIED INTO THE NEW STAIRS AND PLATFORM. imonts: TRACTOR ESTIMATE CHANCE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price $ $ 48,928.00 Original Contract Times: 60 Not changes form previous Change Orders Net changes form previous Change Orders No.` to _ No.` to ._._. (calendar days) $ 0 Contract Price Prior to this Change order: Contract Times prior to Ihis Change Order; (calandar days) $ 48, 928.00 60 Net Increase (decrease) of this Change order: Net Increase (decrease) of this Change Order: (calendardays) $ 11,072.00 60 Contract Price with all Approved Change Orders: Contract Times with all Approved Change Orders: (calendar days) $ 60,000.00 120 APPROVED: (CITY PURCHASING AGEN ACCEP�gD, onlractof) CAS E F RPMMS By: Keith Walls µ V Y Date:f 5/ Date: RECOMMi?NDE,V•(ProjectMa get) , Garrfck'twlelsan `"�' Date: 19 May -15 0 X19 o co sT ? APPROVED: (CITY) ATTER of `+ CCity EP By:' "M I IA rk Jaycee L. Holman \0R00 Date: —71'7/, , ' `" SEAL a e' w Z rAFAsu� Cell: (208) 999-7148 Office: (208) 343.4009 Fax: (208) 343-4838 7512 Lemhi St, Suite 3 - Boise, ID 83709 ryan@cascade-enterprises.com 03/03/15 Project #10029A PWC -C -003516 -AA -1-3-4 Emily Skoro, C/o City of Meridian 33 E. Broadway Ave. Suite 200 Meridian, ID 83642 Re: W WTP Safety Improvement Project Digester No.3 Alternate Pricing Scope of Work: Access Stairs & Cantilevered Platform: 1) Galvanized Stairway w Aluminum Handrail & Cantilevered Landing (Straight) .................$ 18,860.00 a. Includes Saw -cutting Existing Asphalt b. Includes 3ea 8" X 24" X 48" Slab Footings C. Includes Mid -Landing at half -way point of stairs d. Includes Ships Ladder Access to Digester Lid e. Includes Shop Drawings f. Does not Include Engineering Original Scope @ Digester Access: 1) Platform & Access Modifications .................... .......... .................. ...................................... ......... -$ 9,516.00 Total Change (Add) to Original Contract: 1) New Stair Proposed less Original Scope......................................................................................$ 9,344.00 a. Request additional 20 days for Change in Scope (pending approvals) Final Design Additions: 1) Grating & Treads $ 698.00 2) Channel/HSS $ 473.67 3) Extra lbs to Galvanize $ 339.78 4) Detailing $ 500.00 5) Railing $ 992.00 6) Labor S 520.00 7) Sub total $ 3,523.45 8) Subs OH& P @ 15% $ 528.52 9) Cascade OH& p @ 10% $ 405.20 10) Cost Impact $ 4,457.17 Total Change (Add) to Original Contract 1) Upon Approval of Additional Costs.............................................................................................$ 13,801.17 Sincerely, Ryan Steinwand Account/Project Manager "We Specialize in helping clients meet their business demands".