Loading...
HomeMy WebLinkAboutDrainage ReportWA MART 5TORE #3093-00 795 W. Over/and Rd. Meridian, ID Drainage Report January 13, 2011 Prepared by- Pa&ick Holm E.L T. Reviewedby- Nick Taylor, P.E. 606 Columbia ST NW; Suite 106, Olympia, Washington 95501 (360)786-9500 FAX (360)786-5267 EMAIL: padandapac/androm "I hereby certify that this Drainage Report for Proposed Walmart Store # 3093-00 at the southeast corner of Overland Road and Stoddard Road has been prepared by me or under my supervision and meets minimum standards of the City of Meridian, Ada County Highway District and normal engineering practice. I understand that the jurisdiction does not and will not assume liability for the sufficiency, suitability, or performance of drainage facilities designed by me." Nicholas D. Taylor, P.E. Section DrainageReport....................................................................... 1. Proposed Project Description ........................................ 2. Existing Conditions........................................................ 3. Infiltration Rates and Soils Report .................................. 4. Sub -Basin Description................................................... 5. Facility Sizing and Downstream Analysis ....................... Appendix A- Figures Appendix B - Water Quality and Quantity Control Calculations Appendix C- Geotechnical Report 2 2 4 4 6 6 Drainage Report Meridian, ID Section 1 -Proposed Project Description. Parcel Numbers: 87288000084, 87288000014, S1224120900, 51224120950 Total Site Area: 19.75 acres Zoned: General Retail and Service Commercial Zone — C -G Site Address: 795 W. Overland Rd Meridian, ID 83642 Site Location: The project is located at the southeast corner of W. Overland Road and S. Stoddard Road in Meridian, ID(See Vicinity Map, Appendix A, Figure 1). Access is from W. Overland Road and S. Stoddard Road.. Site boundaries include an W. Overland Road to the north, an existing Lowe's and ICON Credit Union to the east, Bear Creek Residential Subdivision to the south, and S. Stoddard Road to the west. A Site Plan and Frontage Improvement Plan are enclosed in Appendix A, as Figures 2 and 3. Project Overview: This report accompanies the Site Civil Plans for the construction of a new retail development. The development will be constructed in two phases and will include appropriate erosion control measures, clearing, grading, underground utilities, paving, and construction of a 165,507 SF single story retail sales facility for the first phase. The second phase will be the development and construction of the outlets, which is not a part of this project. The project site is approximately 19.75 acres with 0.46 acres of frontage improvements along S. Stoddard Rd. The on-site improvements have been designed to the Ada County Highway District (ACHD) Policy Manual, Change Number Two, February 14, 1996(1996 ACHD Manual) as adopted by the City of Meridian. The Stoddard Road frontage improvements have been designed to the most current ACHD policy manual. Storm Drainage Improvements: The site is divided into four different basins for control of stormwater runoff. 17.78 acres of the site will be impervious, which includes the roof of the proposed retail store. For the purposes of this drainage report the outlouts have been considered as 100% impervious surfaces to take a conservative approach regarding future development. Approximately 2.43 acres will be pervious landscaped areas. See Table 1 for post -developed basin area summary. The runoff from the stormwater that falls on the site will be collected in a system of catch basins that will convey the runoff in underground pipes to a seepage bed. PACLAND job #30001053 Page 2 Drainage Report Meridian, ID The seepage bed will use Stormtech chambers and drain rock to detain runoff. From the seepage bed, the runoff will receive primary treatment by percolating through a sand filter. 17.78 acres of the site will be impervious, which includes the roof of the proposed retail store. Approximately 2.43 acres will be pervious landscaped areas. See Table 1 for post - developed basin area summary. Table 1: Proposed Basin Areas Basin Impervious Surface; CN 98 Pervious Area; CN 74 Total Basin Area Basin A 6.89 0.91 7.80 Basin B 10.41 0.52 10.93 Basin C 0.48 0.26 0.74 Basin D 0.00 0.74 0.74 Total 17.78 2.43 20.21 Stormwater Treatment: Stormwater treatment requirements are based on the 1996 ACHD Manual for on-site treatment. The Stoddard Road frontage improvement stormwater treatment design is based on the most current ACHD policy manual. The basins include the driveways, drive aisles, parking areas, sidewalks, roof surface, and landscaped areas. Runoff from these areas will sheet flow into catch basins that convey water to seepage beds below the pavement. Runoff will then percolate through ASTM C-33 Filter Sand, which is approved by ACHD for primary treatment. There is no pretreatment (sand and grease traps) for the seepage beds on-site. Because there is no pretreatment, the seepage bed is sized 50% larger than the required design value to account for potential sediment. Additionally, the seepage beds will have an isolator row to trap suspended solids. Each seepage bed was designed to detain and treat the 100 -year, 24-hour event. The seepage bed in the Additional detailed drainage calculations for water quantity and quality will be shown in Appendix B. Stormwater Detention: Due to well -draining soils discovered on-site, all runoff from the 100 -year, 24-hour storm event will be infiltrated through the bottom of the seepage beds which have a combined footprint of approximately 29,000 ft. Terracon performed a pilot infiltration test on December 20, 2011, at each proposed bed location. The observed infiltration rate for Seepage Bed Awas 9 inches/hour and Seepage Bed B was 15 inches/hour. PACLAND applied a factor of safety of 3 to each of these infiltration rates and calculated a 3 inches/hour and 5 inches/hour rate, respectively. See Appendix C for the geotechnical report. The SCS method was used to calculate the design volumes based on the design infiltration rates. For Seepage Bed C, Terracon gave a preliminary infiltration rate based on PACLAND Job #30001053 Page 3 Drainage Report Meridian, ID the geotechnical data of 10 inches/hour. PAC LAND applied a factor of safety of 3 to this rate resulting in a 3.3 inches/hour design infiltration rate. This rate will be verified by a field test prior to construction. See Section 5 for detailed description and calculations. Stormwater Conveyance: Runoff will sheet flow across the parking and landscaped surfaces, collect in curb and gutter, then will be conveyed to open grate catch basins in parking areas. Rooftop runoff will be captured by roof drains and be conveyed directly to the seepage beds. All captured runoff will be conveyed through Corrugated Polyethylene Pipe(CPEP) smooth interior/annular exterior. All on-site conveyance grates, structures, pipes and associated appurtenances are sized to convey the 25 -year, 24-hour event, as prescribed by the 1996 ACHD Policy Manual, as adopted by the City of Meridian. The Stoddard Road frontage improvements conveyance grates, structures, pipes and associated appurtenances are sized to convey the 100 -year, 24-hour event per the current ACHD Policy Manual. Conveyance calculations are further described in detail in Section 5. Section 2 - Existing conditions. The project site is currently undeveloped consisting of low to medium coverage vegetation. The site naturally slopes from the northeast to the southwest and on-site elevations vary from 2637' to 2624' with the steepest existing slopes of 4:1. Due to curb and gutter along Overland Road on the north boundary and the Lowe's site to the east boundary, there is little to no stormwater runon from the north or east. Stoddard Road has no curb and gutter along the property boundary so stormwater runon flows on to the site from Stoddard Road along the west boundary. The southern boundary is down gradient of the site so there is no runon along the southern boundary. There were no creeks, lakes, ponds, wetlands, ravines, gullies, springs, or other environmentally sensitive areas discovered onsite or within a quarter mile downstream of the site. On-site drainage is contained within the site with the exception of minimal sheet flow at various locations directed off-site through vegetated groundcover. Section 3 - Inf►ltration Rates and Soils Report. A geotechnical report and infiltration tests have been completed by Terracon, and the report and test data have been included in Appendix C. Groundwater was not encountered in any of the on-site borings, the maximum bore depth being 20 feet below ground surface. The geotechnical report by Terracon referenced the Idaho Department of Water Resources well log lookup tool. Using this tool Terracon found depths of groundwater ranging from 25-89 feet below the ground surface. Three PACLAND Job #30001053 Page 4 Drainage Report Meridian, ID feet of separation from the bottom of the seepage bed to the shallowest documented groundwater elevation will be maintained at all seepage bed facilities. Pilot infiltration tests(PITs), also known as large scale infiltration tests, were completed December 20, 2012 by Terracon in two locations, the vicinity of the proposed north seepage bed and the vicinity of the proposed south seepage bed. A PIT involves excavating large pits and then performing a constant head test and a falling head test to determine infiltration rates. The tests yielded an infiltration rate of 9 in and 15 inches/hour for the north and south respectively. Per Walmart's requirement for infiltration facilities under parking lots, these infiltration rates were reduced using a factor of safety of 3,0, yielding rates of 3 inches/hour and 5 inches/hour respectively for the north and south seepage beds. An infiltration test in accordance with ACHD standards is scheduled for the proposed seepage bed that will detain the new runoff created by the proposed curb and gutter along Stoddard Road. For preliminary design, Terracon gave an infiltration rate of 10 inches/hour. PACLAND applied a factor of safety of 3 to this rate resulting in a 3.3 inches/hour design infiltration rate. This rate will be verified by a field test. PACLAND Job #30001053 Page 5 Drainage Report Meridian, ID Section 4 - Sub -Basin Description: The site is divided into four basins (Basins A -D). See Figure 4 in Appendix A Basin A includes the north portion of the site and approximately half of the building. Basin B includes the south portion of the site and approximately half of the building. Basin C includes the western frontage improvements and Stoddard Road. Basin D includes the landscape strip that runs along the southern boundary line. Each basin has been divided into smaller sub -basins based on local grading and drainage capacity. See Table 2 for sub -basin area quantities. Table 2: Proposed Sub -Basin Areas Bain , ,ea. SF> < e fAc- A-1 6,116 0.14 A-2 2,002 0.05 A-3 14,114 0.32 A-4 61,893 2.35* A-5 16,824 0.39 A-6 18,511 0.42 A-7 18,352 0.42 A-8 56,349 1.29 A-9 45,319 1.04 A-10 22,397 0.51 A-11 35,908 0.82 A-12 9,786 0.22 A-13 -- 2.56* A-14 13,702 0.49* B-1 90,669 2.08 B-2 130,978 3.01 B-3 72,708 1.67 B-4 11,914 0.27 B-5 61,893 1.42 B-6 0.09* B-7 0.09* B-8 1.19* B-9 — 1.95* B-10 11,576 0.27 B-11 7,729 0.18 B-12 6,905 0.21 B-13 13,824 0.32 -1 20,016 0.46 C-2 13,702 0.31 D-1 32,607 0.75 *Does not equal actual basin area. Roof drains are designed per Walmart standard to convey a 5 inches/hour intensity storm through a siphonic system. These areas have been adjusted by keeping the flow of the roof drains constant but adjusting the area based on the 25 -year 24-hour 10 -min Tc intensity of 2.37 inches/hour. Section 5 - Facility Sizing Basin A: Basin A is approximately 7.80 acres and is located in the north portion of the site. This basin and the remaining three basins are shown in Figure 4 in Appendix A. There is approximately 0.91 acres of pervious landscaping throughout the basin. The remaining acreage is a combination of impervious paved and rooftop surfaces. PACLAN D job #30001053 Page 6 Drainage Report Meridian, ID The rooftop area will be conveyed through a siphonic manhole system to the underground conveyance system. From there, it will be conveyed to the underground seepage bed. The runoff from the impervious surfaces will be collected by manholes and conveyed through CPEP to the underground seepage bed. Several small auxiliary vestibules drain through regular roof drains to the underground conveyance system. The outlot area of Basin A is assumed to be impervious to provide for the most conservative calculation of future development. Basin B is approximately 10.88 acres and is located in the south portion of the site. There is approximately 0.50 acres of pervious landscaping throughout the basin. The remaining acreage is a combination of impervious paved and rooftop surfaces. The rooftop area will be conveyed through a siphonic manhole system to the underground conveyance system. From there, it will be conveyed to the underground seepage bed. The runoff from the impervious surfaces will be collected by manholes and conveyed through CPEP to the underground seepage bed. Several small auxiliary vestibules drain through regular roof drains to the underground conveyance system. The outlot area of Basin B is assumed to be impervious to provide for the most conservative calculation of future development. Basin C: Basin C is approximately 0.78 acres and is located in the west portion of the site. There is approximately 0.28 acres of pervious landscaping throughout the basin. The remaining acreage is impervious surface. The runoff from the impervious surface will be collected in curb and gutter and conveyed to an inlet catch basin. From there; it will be conveyed to a sand and grease trap followed by a seepage bed. Basin D: Basin D is approximately 0.74 acres and is located along the south portion of the site. Approximately the entire area is pervious landscaping. This area will be vegetated and will not alter the existing drainage pattern or quantity. PACLAN D Job #30001053 Page 7 Drainage Report Meridian, ID Seepage Bed Facilities: The proposed seepage beds for Basin A and B were sized using Stormshed 3G by Engenious Sytems, Inc. using the SCS Unit Hydrograph Method. The seepage bed for Basin C, along Stoddard Road, was sized per the current ACHD Policy Manual and verified using Stormshed 3G. Seepage Beds A and B: Seepage Beds A and B were designed to accommodate the 100 -year 24-hour event. Based on the Idaho Isopluvial map by National Oceanic and Atmospheric Administration(NOAA), 2.7 inches/hour was identified as the 100 -year, 24-hour design precipitation rate. The seepage bed design utilizes the Stormtech MC4500 chamber system. The specifications and cross section of this system can be found in Appendix B. The design infiltration rates for Seepage Bed A and B is 3 inches/hour and 5 inches/hour, respectively, as previously noted in this report. The storm event information and infiltration data was entered into Stormshed 3G to determine the appropriate seepage bed volume and footprint. Once this volume was determined for each seepage bed, Walmart requires that each seepage bed be sized 1500/, of the design volume to account for sediment buildup and other unanticipated drainage complications. Because these seepage beds are 150% the size of the required volume, sand and grease pretreatment has been omitted as allowed by the ACHD policy manual. Sediment capture will be further supplemented by isolator rows in each seepage bed, which collect sediment using proprietary devices that can be cleaned. See Table 3 for the seepage bed design and proposed volumes. Both Seepage Beds A and B will drain more than 90% of the 100 -year, 24-hour event runoff volume within 24 hours as prescribed by the ACHD policy manual. The porosity (Stormshed 3G Void Ratio) of the seepage beds was determined by calculating the volume of storage and dividing it by the total volume. The outputs from Stormshed 3G are included in Appendix B. Table 3: On-site Seepage Bed Data Seepage Bed Infiltration Required Proposed Volurrt: eepage Bed Rate (in/hr) Volume (cf) (cf) Footprint (sf) Seepage Bed A 3 32,785 50,140 12,000 Seepage Bed B 5 42,618 65,155 15,680 Seepage Bed C Seepage Bed C was designed to accommodate the 100 -year, 24-hour event based on the current ACHD policy manual, which uses the rational method. Terracon gave a preliminary infiltration rate of 10 inches/hour for Seepage Bed C. A design factor of safety of 3 has been applied to this preliminary infiltration rate to obtain 3.3 inches/hour. This data can be seen in Table 4. This infiltration rate will be verified by a field test from Terracon prior to construction. ACHD has a stormwater calculation sheet to determine the PACLAND Job #30001053 Page 8 Drainage Report Meridian, ID stormwater runoff and the subsequent sizing of sand and grease pretreatment and seepage beds. These calculation sheets can be found in Appendix B. Table 4: Frontage Improvement Seepage Bed C Data Seepage Bed filtration Design Volume Proposed V e Bed 12 (in/hr) (cfl (cfl ... rint (sfl Seepage Bed C 3.3 3,915 4,100 1,350 The design of this seepage bed was verified using Stormshed 3G. This seepage bed will drain more than 90% of the 100 -year, 24-hour event runoff volume within 24 hours as prescribed by the ACHD policy manual. The porosity (Stormshed 3G Void Ratio) of the seepage bed was determined by calculating the volume of storage and dividing it by the total volume. This data is included in Appendix B. Treatment Facilities: The stormwater runoff is to be treated using an 18" ASTM C-33 Filter Sand strip below each Seepage Bed. All facilities meet the infiltration requirements set forth by the previous and current ACHD policy manuals. Seepage Beds A and B do not have pretreatment facilities because they are sized 150% of the design volume and are supplemented with sediment isolator rows. Seepage Bed C, which collects runoff from the Stoddard Road, will have a 1000 gallon sand and grease trap for pretreatment, and thus does not require oversizing. This sand and grease trap was sized using the ACHD stormwater calculation spreadsheet and is included in Appendix B. Conveyance: On -Site Conveyance: Per the 1996 ACHD manual the on-site conveyance system was sized to accommodate the 25 -year 24-hour storm event. This event has a rainfall intensity of 2.37 inches/hour for a Tc of 10 minutes. Maximum flows for 12", 18" and 24" pipes were calculated using the Manning equation and the maximum contributing areas for each applicable pipe size was calculated using these maximum flows and is shown in Table 5. Table 5: Maximum Pipe Flows and Areas Pipe Size (in) Max Flow, Q (cfs) i es/ho :: Maximum 0iijilififfillik, 12 2.52 0.95 2.37 1.12 18 7.42 0.95 2.37 3.30 24 15.99 0.95 2.37 7.11 Each basin was tabulated to account for the cumulative contributing sub -basins to that basin's conveyance system. If the cumulative area exceeded the maximum area for a pipe PACLAND Job #30001053 Page 9 Drainage Report Meridian, ID size, that section of the conveyance system was increased to the next size. This tabulation and pipe selection is shown in Table 6. For the roof drains, the actual contributing areas were not used. Walmart requires that the roof drain pipes be sized to accommodate a 5" inches/hour storm and provides flow rates for these roof drains. The flows for these roof drains were used to calculate adjusted areas using the 2.37 inches/hour intensity which creates adjusted areas slightly larger than the actual area. Table 6: Sub -basin Conveyance Data Basin Area(Ac) CumulaiffWwPipe Basin Area(Ac) Size (in) A-1 0.14 0.14 12 A-2 0.05 0.19 12 A-3 0.32 0.51 12 A-4 2.35* 2.86 18 A-5 0.39 3.25 18 A-6 0.42 3.68 24 A-7 0.42 4.59 24 A-8 1.29 5.88 24 A-9 1.04 3.60 24 A-10 0.51 1.56 18 A-11 0.82 1.05 12 A-12 0.22 0.22 12 A-13 2.56* 2.56 18 A-14 0.49* 0.49 12 FlWin Area (Ac) Cumulative Basin Area(Ac) Pipe Size (i n) B-1 2.08 2.08 18 B-2 3.01 3.01 18 B-3 1.67 1.94 18 B-4 0.27 0.27 12 B-5 1.42 5.56 24 B-6 0.09* 0.09 12 B-7 0.09* 0.18 12 B-8 1.19* 1.19 18 B-9 1.95* 1.95 18 B-10 0.27 4.13 24 B-11 0.18 2.68 18 B-12 0.21 0.21 12 B-13 0.32 0.55 12 *Does not equal actual basin area. Roof drains are designed per Walmart standard to convey a 5 inches/hour intensity storm. These areas have been adjusted by keeping the flow of the roof drains constant but adjusting the area based on the 25 -year 24-hour 10 - min Tc intensity of 2.37 inches/hour. Frontage Conveyance (Stoddard Road): The conveyance system for Basin C along Stoddard Road is designed per the current ACHD Policy Manual - Section 8000 Drainage and Stormwater Management. Stoddard Road is classified as a collector, so the depth of ponding requirements are no curb overtopping and minimum of one 10 ft lane dry. The inlet spacing is 1,000 feet or based on spread calculation. Both the spread and 1,000 feet criteria are met. The 100 -year 24-hour peak flow in the proposed gutter is 2.14 cfs. The longitudinal cross slope of Stoddard rode is 0.012 ft/ft. The pavement cross slope is 0.015 ft/ft. Atthe PACLAND job #30001053 Page 10 Drainage Report Meridian, ID proposed inlet, the maximum spread is 10'. Using the ACHD Stormwater calculator for spread, these values were entered to calculate the maximum gutter flow of 2.72 cfs, which is higher than the calculated peak flow of 2.14 cfs, so the gutter can accommodate the increased runoff. This calculation is included in Appendix B. The spread was verified at the inlet using the following equation: T = [(Qn) / (K� S.1.67 SL .5)0.375 Ku = 0.56 in English units n = Manning's coefficient Q = Flow rate (ft3/s) T = Width of flow (spread) (ft) Sx = Cross slope (ft/ft) SL = Longitudinal slope (ft/ft) Using this equation, with an "n" value of 0.012 for troweled concrete, the spread was calculated as 10'. This is the maximum for this location. The spread will be slightly less in the actual condition because the inlet is near a driveway. The driveway will cause the water to spread uninhibited in both directions, making the spread less obtrusive in the roadway. PACLAND Job #30001053 Page 11 Drainage Report Meridian, ID Appendix A Appendix A Figures Figure 1: Vicinity Map Figure 2: Grading and Drainage Plan Figure 3: Frontage Improvement Plan Figure 4: Basin Map Drainage Report Meridian, ID Figure 1 —Vicinity Map WATERTOWER LN ggg E CORPORATE OR B � W WALTMAN ST WALiMAN LN E CENTRAL DR VERBENA DR INTERSTATE 84 w � W OVERLAND RD � E OVERLAND E CALDERWOOD 3 PROJECT u�i LOCATION � 71001A' 11PoMAM VICINITY MAP EX -1 MERIDIAN, IDAHO 606 Columbia St. N.W., Suite 106 T(360)]86-9500 Olympia, WA 98501 F (360) ]86-526] SCALE: 1" = 2,000' w�wu.PxI`oo.". RT w � � E CALDERWOOD DR u�i Drainage Report Meridian, ID Figure 2 - Grading and Drainage Plan U z rm w Z 11 5 IN Q AH - 'rt 3 v Z FIS I� Pi - g 'R _ y F Q ` a .o a ❑o 110= ^ o P env a� 0 � ❑ I'r� � aN6Vltl � � 0� a SII �zaw Ob 5 m o t P i r 1 ❑ / �9S s _ 18N118A04 V III _ €, - Ames -- _ a II g� ------ Is MAP �r a 11 a w SII � I 'jI , � �.� _ _ �❑ �g<F �"� ill � m #,.'. Q tip A _ ��SII � �S' a rptNo €s IIS R f ❑ /WHIP 1 ON 111111 e r F�__ — N 10 IRS, TO ps .. - o wad - -- g z �- " _ avoe advaaols s � o I_ - ,. _ a "IN" - - e F ¢� E;a.,..` (� =` all; 01111"I g �d. amb hisim . In a ` a £ g 0 U z rm w Z 11 5 IN Q AH - 'rt 3 v Z FIS I� Pi - g 'R _ y F Q ` a .o a ❑o 110= ^ o P env a� 0 � ❑ I'r� � aN6Vltl � � 0� a SII �zaw Ob 5 m o t P i r 1 ❑ / �9S s _ 18N118A04 V III _ €, - Ames -- _ a II g� ------ Is MAP �r a 11 a w SII � I 'jI , � �.� _ _ �❑ �g<F �"� ill � m #,.'. Q tip A _ ��SII � �S' a rptNo €s IIS R f ❑ /WHIP 1 ON 111111 e r F�__ — N 10 IRS, TO ps .. - o wad - -- g z �- " _ avoe advaaols s � o I_ - ,. _ a "IN" - - e F ¢� E;a.,..` (� =` Drainage Report Meridian, ID Figure 3 - Frontage Improvement Plan IF - g W. OVERLAND ROAD i °sxg�8 �i§gg g ae ooym. yam. e e a GESS l 8 y-3- =�II1�� �p��kd�ea � 3 { u II ��0 NI F1 3 aS a g rs \ r �f91 'A� III I , oo�a KA KA wevc I-mr-onam w^ e v nma \=Wlwm n�sl omvvas 9 vewa\=mow\'mlwol�omo4 n 1. al je s 131 lA 9 1r !! I� r Pill, W a II AAAI le II= W I I I y b `:W4� III` E 1 I GH Nl-lHBW 20 sa I---_ � C - y II as Z II Qln wevc I-mr-onam w^ e v nma \=Wlwm n�sl omvvas 9 vewa\=mow\'mlwol�omo4 II Y al je s 131 lA 1r !! r Pill, R a II AAAI le II= W I I I y b `:W4� III` E 1 I GH Nl-lHBW C - P I { IIII III p tl SII II IIII„1' I wevc I-mr-onam w^ e v nma \=Wlwm n�sl omvvas 9 vewa\=mow\'mlwol�omo4 Drainage Report Meridian, ID Figure 4 — Basin Map J Z <w W Z ,.._o W'o2Q I ZF-W Zm -1 \1 W m D 0 H Cl) C) 0 p 00 Cl) Z Z CO Q uj Q m W m Drainage Report Meridian, ID Appendix B Water Quality and Quantity Design Calculations Drainage Report Appended on: Monday, January 30, 2012 8:12:13 AM LPOOLCOMPUTE [A-001] SUMMARY using Puls, 24 hr Storm Event Start of live storage:0 ft Meridian, ID Event Match Q PCfs)Q MaxDepthVol (cf) (ac Time (hrEmpty year 20.4937 0.8333 4.4641 32784.4679 0.7526 5.0575 Summary Report of all Detention Pond Data Project Precips Event Precip (in) other 0.50 2 yr 24 h—rF 1.20 100 year F 2.70 BASLIST2 [Basin A] Using [TYPE2.RAC] As [100 year] [24.0] [Basin A] Using [TYPE2.RAC] As [100 year] [24.0] LSTEND Peak Peak T Peak Vol (ac- Area BasinlD Event (cfs)� (hrs) 0 (re) Method/Loss Raintype Basin AYO� 20.4937 12:03 1.4759 7.80 AC SCS TYPE2.R Basin A Y�� 204937 12.03 1.4759 7.80 SCS TYPE2.RAC BASLIST [Basin A] LSTE N D Record Id: Basin A Design Method F SCS IRainfall type I TYPE2.RAC Hyd Intv 10.00 min lPeaking Factor 484.00 Storm Duration 24.00 hrs Abstraction Coeff 0.20 Pervious Area 0.91 ac [DCIA 6.89 ac Pervious CN 74.00 IDC CN 98.00 Drainage Report Meridian, ID Pervious TC F 10.00 min IDC TC 1 10.00 min Pervious CN Calc Length 100.00 ft Width 120.00 ft Description SubArea F Sub cn Landscape 0.91 ac F 74.00 Pervious Composited CN (AMC 2) 74.00 Pervious TC Calc Type Description Length Slope Coeff Misc TT Sheet 0.00 ft 0.0% 10.0 0.00 in 10.00 min Pervious TC 10.00 min DCI - CN Calc Description FSubArea Sub cn Impervious surfaces (pavements, roofs, etc) F6.89 ac 98.00 DC Composited CN (AMC 2) F98.00 DCI - TC Calc Type Description Length Slope Coeff Misc TT Sheet 0.00 ft 0.0% 10.0 0.00 in 10.00 min Pervious TC 10.00 min HYDLIST SUMMARY [100 year out] LSTE N D HydID IPeak Q (cfs) (Peak T (hrs) (Peak Vol (ac -ft) ICont Area (ac) 100 year out Fo.8333 1 o -72F 1.4743 F 7.8 STORLIST [Basin A Seepage Bed] LSTE N D Record Id: Basin A Seepage Bed Descrip: Prototype Record Increment 10.10 ft Start EI. 0.00 ft Max EI. 6.75 ft Void Ratio 61.20 F -F- Length 100.00 ft Width 120.00 ft F--F-Consider Bottom Only Drainage Report Meridian, ID VauItType Node DISCHLIST [Basin A Discharge] LSTEN D Record Id: Basin A Discharge Infiltration Descrip: lPrototype Structure Increment 0.10 ft Start EI. 0.00 ft IMax EI. F6.75 ft Infiltration rate 3.00 in/hr IWP Multiplier F 1.00 Drainage Report Appended on: Monday, January 30, 2012 8:12:51 AM LPOOLCOMPUTE [B-001] SUMMARY using Puls, 24 hr Storm Event Start of live storage:0 ft Meridian, ID Match Peak Max Depth Vol Time to Em Event (cfs) Q (cfs)Q (ft) p Vol (cfl (volt (hr) p� 100 30.1634 1.8056 4.4639 42617.8966 0.9784 0.0118 year Summary Report of all Detention Pond Data Project Precips Event Precip (in) other 0.50 2 yr 24 hr F 1.20 100 year 2.70 BASLIST2 [Basin B] Using [TYPE2.RAC] As [100 year] [24.0] [Basin B] Using [TYPE2.RAC] As [100 year] [24.0] LSTEND Peak Q Peak T �Peak Vol (ac- Area BasinlD Event (cfs) (hrs) 1 co (ac) Method/Loss Raintype Basin B 10� 30.1634 1-F2.1782 10.93 SCS TYPE2.RAC Basin B 100 30.1634 12.03 2.1782 10.93 SCS TYPE2.RAC year BASLIST [Basin B] LSTE N D Record Id: Basin B Design Method F SCS Rainfall type I TYPE2.RAC Hyd Intv 10.00 min lPeaking Factor 484.00 Storm Duration 24.00 hrs lAbstraction Coeff 0.20 Pervious Area 0.52 ac DCIA 10.40 ac Pervious CN F 74.00 IDC CN 98.00 Drainage Report Meridian, ID Pervious TC F 10.00 min IDC TC 1 10.00 min Pervious CN Calc Length 100.00 ft Width 156.00 ft Description SubArea F Sub cn Landscape 0.52 ac 74.00 Pervious Composited CN (AMC 2) 74.00 Pervious TC Calc Type I Description Length Slope Coeff Misc TT Sheet 0.00 ft 0.0% 10.0 0.00 in F 10.00 min Pervious TC 10.00 m i n DCI - CN Calc Description F SubArea Sub cn Impervious surfaces (pavements, roofs, etc) Fl0.41 ac F98.00 DC Composited CN (AMC 2) F98.00 DCI - TC Calc Type I Description F Length FSIope FCoeff F Misc F TT Sheet 0.00 ft 0.0%F10.0 0.00 in 10.00 min Pervious TC 10.00 min HYDLIST SUMMARY [100 year out] LSTE N D HydlD Peak Q (cfs) Peak T (hrs) Peak Vol (ac -ft) Cont Area (ac) 100 year out 1.8056 11.11 2.178 F 10.93 STORLIST [Basin B Seepage Bed] LSTE N D Record Id: Basin B Seepage Bed Descrip:Prototype Record Increment 0.10 ft Start EI. 0.00 ft Max EI. 6.75 ft Void Ratio 61.20 Length 100.00 ft Width 156.00 ft E -F -Consider Bottom Only Drainage Report Meridian, ID Vault Type Node DISCHLIST [Basin B Discharge] LSTEND Record Id: Basin B Discharge Infiltration Descrip: lPrototype Structure Increment 0.10 ft Start EI. 0.00 ft IMax EI. 6.75 ft Infiltration rate 5.00 in/hr JWP Multiplier F 1.00 5 MC -4500 CHAMBER NOMINAL 314 .2 INCH [19 mm - 51 mml CLEAN, CRUSHED, ANGULAR STONE AASHTO M268 CLASS 2 NON -WOVEN GEOTEXTILE ALL AROUND ANGULAR STONE T ,_atnn Fmnr-, THE INSTALLED CHAMBER SYSTEM SHALL PROVIDE THE LOAD FACTORS SPECIFIED IN THE AASFITO LRFO BRIDGE DESIGN SPECIFICATIONS SECTION 12.12. FOR EARTH AND LIVE LOADS, WITH CONSIDERATION FOR IMPACT AND MULTIPLE VEHICLE PRESENCES. GRADED SOIUAGGREGATE MIXTURES, <35% IN 12" [305 mm] LIFTS TO 95% PROCTOR DENSITY. PAVEMENT DESIGN (PER [1.96 m] ENGINEER'S DRAWINGS) _iIt'ii-C `_poTa�l�y°p�blooyn\ 12" '0'��_il Uo �'` jIi"liio rcll•(=IIS [305 mm[ e� fo o\ -A 60"[1524 mm] nj - " [22 457 mm] N 18"_ ASTMmm] ASTM C33 Filter SaM 9" [229 mm] MIN.7[21'1'1!mj —12" [305 mm] MIN. SEEPAGE BED A AND B NTS Drainage Report Appended on: Monday, January 30, 2012 8:14:52 AM Meridian, ID LPOOLCOMPUTE [C-0011 SUMMARY using Puls, 24 hr Storm Event Start of live storage:0 ft Event I Match Q Peak Q Max Depth Vol (et) V0' Time to Empty (cfs) (cfs) (ft) F(Vol (hr) X00 1,6118 0.1041 2.6149 2187.6217 0:0502 0:0118 Summary Report of all Detention Pond Data Event jPrecip (in) other F o.50 2 yr 24 hr f 1.20 100 year F 2.70 BASLIST2 [Basin Cl Using [TYPE2.RAC] As [100 year] [24.0] [Basin Q Using [TYPE2.RAC] As [100 year] [24.0] LSTEN D Peak Peak T Peak Vol (ac- Area BasinlD Event (cfs)Q (hrs) cf) (ac) Method/Loss Raintype Basin C '00 1.6118 12.03 0.1147 0.74 SCS TYPE2.RAC Basin C 100 year BASLIST [Basin C] LSTE N D Record Id: Basin C 1.6118 12.03 0.1147 0.74 SCS TYPE2.RAC Design Method SCS Rainfall type I TYPE2.RAC Hyd Intv 10.00 min I Peaking Factor 484.00 Storm Duration F 24.00 hrs lAbstraction Coeff 0.20 Pervious Area 0.26 ac DCIA 0.48 ac Pervious CN 74.00 IDC CN 98.00 Drainage Report Meridian, ID Pervious TC 10.00 min IDC TC 10.00 min Pervious CN Calc Description SubArea F Sub cn Pervious 0.26 ac 74.00 Pervious Composited CN (AMC 2) 74.00 -Consider Bottom Only Pervious TC Calc Type I Description FLength Fslope Coeff F Misc 7 TT Sheet 0.00 ft 0.0°!° 10.0 0.00 in 10.00 min Pervious TC 710.00 min DCI - CN Calc Description SubArea Sub cn Impervious surfaces (pavements, roofs, etc) FO.48 ac F98.00 DC Composited CN (AMC 2) F98.00 DCI - TC Calc Type Description Length Slope Fcoeff F Misc 7 TT Sheet 0.00 ft 0.0% 10.0 0.00 in 10.00 min Pervious TC 10.00 min HYDLIST SUMMARY [100 year out] LSTEN D Hydl D Peak Q (cfs) Peak T (hrs) Peak Vol (ac -ft) Cont Area (ac) 100 year out 0.1041 11.46 0.1147 0.74 STORLIST [Basin C Seepage Bed] LSTE N D Record Id: Basin C Seepage Bed Descrip: Prototype Record Increment 0.10 ft Start EI. 0.00 ft Max EI. 5.50 ft Void Ratio 61.97 F�� Length 27.00 ft Width 50.00 ft F -F -Consider Bottom Only Drainage Report Meridian, ID Type Node DISCHLIST [Basin C Discharge] LSTEN D Record Id: Basin C Discharge Infiltration Descrip: Prototype Structure Increment 0.10 ft Start EI. 1 0.00 ft IMax EI. F5.50 ft Infiltration rate F 3.33 in/hr IWP Multiplier 1.00 E [152 MC -3500 CHAMBER NOMINAL 3/4 - 2INCH [19 mm - 51 CLEAN, CRUSHED, ANGULAR ST AASHTO M288 CLASS 2 NON -WOVEN GEOTEXTILE ALL AROUND ANGULAR STONE - ,.. C-3500 ENDCAP THE INSTALLED CHAMBER SYSTEM SHALL PROVIDE THE LOAD FACTORS SPECIFIED IN THE AASH HD LRFD BRIDGE DESIGN SPECIFICATIONS SECTION 12.12 FOR EARTH AND LIVE LOADS, WITH CONSIDERATION. FOR IMPACT AND MULTIPLE VEHICLE PRESENCES. 0 6"[152 mm] GRANULAR WELL GRADED SOIUAGGREGATE MIXTURES, <35% FINES. COMPACT IN 6" 1152 mm] LIFTS TO 95% PROCTOR DENSITY. SEEPAGE BED C NTS 6.5'[1.98 m] 12" 0 0\ _A 45" [1143 mm] `9" [229 mm]. 18"[457 mm] ASTM C33 Filter Sand 77 --� [-- 12" [365 mm] [1956 mm]