HomeMy WebLinkAboutVentana04�g!Any—. Community Development Department
Surety Application
Type of Surety:
N Pexformance ❑ Warranty -
Improvements Covered under Surety: Sewer, water, landscaping and Pressure Irrigation
Information
Project name: Ventana Commons
Location/stseet address: N E of N Meridian Road and W McMillan Road
Parcel number: S0530325420
Information
Owner/Devclopername: Ventana, LLC
Phone: 208.336.5355
Owner/Developer address: 1977 E. Overland Road Meridian, Idaho Zip. 83642
Contact e-mail: lconger@congergroup.com Fes. 208.336.2282
Information
Applicant: Jim Conger - Conger Management Group - Phone: 208.336.5355
Applicant address: 4824 W. Fairview Avenue Boise, Idaho Zip: 83706
Primary contact is: ❑ Property Owner N Applicant
Contact e-mail: linger@congergroup.com
Fax: 208.336.2282
Authorization �
Printed name: Jim Conger -
Signature: Date: 6/16/15
STAFF USE ONLY:
Community Development. 33 E.. Broadway Avenue, Ste.. 102 Meridian, Idaho 83642
Phone: 208-884-5533 Fax: 208-888-6854 w .meridiancitv.ore
(11-24-2014)
251
FILED E FU, ...
ARTICLES OF ORGANIZATION
4 LIMITED LIABILITYCOMPANY lon FEB 24 ?N 4, 14
(Instructions on back of application)
SECRtTi i U� of^IL
1. The name of the limited liability company is: STT 01� IUni',J
Ventana, LLC
2. The street address of the initial registered office is:
1908 Jennie Lee Drive, Idaho Falls, Idaho 83404
and the name of the initial registered agent at the above address is:
Gary L. Voigt
3. The mailing address for future correspondence is:
P.O. Box 2044, Idaho Falls, Idaho 83403
4. Management of the limited liability company will be vested in:
Manager(s) ❑✓ or Member(s) ❑ (please check the appropriate box)
5. If management is to be vested in one or more manager(s), list the name(s) and
address(es) of at least one initial manager. If management is to be vested in the
member(s), list the name(s) and address(es) of at least one initial member.
Name
Address
Gary L. Voigt 1908 Jennie Lee Drive, Idaho Falls, ID 83404
6. Signature of at least one p Wsorirespo Bible or forming the limited liability company:
Signature: Secretary of State use only
Typed Name: ary L. Voigt
Capacity: Manager
Signature _
Typed Name:
Capacity: _
$
$
IOW SECRETARY OF STATE
02/24/2085 65=®13
CK: none CT: 39351 Btir 745812
1181 IILN 21.81 : 118-M ORRMi LLC 1 i
28.18 EV017E C 1 i
1(odRdon Mana"Mofa
June 16, 2015
Bruce Freckleton
City of Meridian
33 E. Broadway
Meridian, Idaho 83642
RE: Ventana Commons — Surety Amounts
Dear Bruce,
Please find the following information relating to the above referenced project regarding
the installation of, or bonding for sanitary sewer, water, P.I., Fencing and amenities.
The attached documents are intended to establish the surety amounts for the above-
mentioned activity. Based on this information, we request the approval of the following
surety amount in order to secure the appropriate letter of credit.
Total Surety Amount $488,928.31
Please review this information and do not hesitate to contact me with any questions or
concerns. We look forward to approval of the proposed surety amount as soon as
possible.
Si cerely,
, J" -'a
Dianne Jossis
Conger Management Group
4824 W. Fairview Ave
Boise, Idaho 83706
208.336.5355
6/15/2015
Surety Request - Breakdown
Ventana Commons
Meridian, Idaho
Sewer ✓ $ 85,914.00 x 125% _ $ 107,392.50
Water 1./$ 118,931.25 x 125% _ $ 148,664.06
Pressure Irrigation ✓$ 51,160.00 x 110% _ $ 56,276.00
Street Lights 0/$ 33,131.00 x 110% _ $ 36,444.10 ,�0.�kda�l
Fence $ 58,599.21 x 110% _ $ 64,459.13 5
Playground Equip/benches $ 1,812.50 x 110% _ $ 1,993.75 n
10' Multi Use Pathway $ 4,100.00 x 110% _ $ 4,510.00
Landscape $ 62,898.88 x 110% _ $ 69,188.77 C)C-2Z ^!5
TOTAL $ 488,928.
WATER
4 8" C-900 Water Main
5 8" Gate Valve
6 Misc Fittings&Bends
7 Double Lot Service
8 Single Lot Service
9 Fire Hydrant Assv
TOTALWATER
STORM DRAIN
10 12" C-900 Storm Drain
11 12" SDR35 Storm Drain
12 15" SDR35 Storm Drain
13 16" C905 Storm Drain
14 18" PVC Storm Drain
15 18" C900 Storm Drain
16 48" Storm Manhole
17 Seepage Bed Complete
18 1000 Gallon Sand & Grease Trap
TOTAL STORM DRAIN
PRESSURE IRRIGATION.
1916" P -Ir, Main
20 4" P-Irr Main
22.00
�► M -GRADE UNDERGROUND, INC.
14.35
3,648.35
521 E. 3rd
6.00
EA
1,057.00
Meridian, Idaho 83642
6,342.00
1.00
LS
Contact: Dave Clifford, Vice President
651.00
8,489.00
33.00
Phone: (208) 888-6541
1,233.00
6,939.00
40,689.00
F= (208) 888-6276
EA
927.85
Quota To:
Conger Management Group Job Name
Vemana No.3
EA
3.286.00
Attu: Jim Codger Date of Plans:
3-26-2015
3.00
Phone:
322-3663 Revision Date:
5,137.95
Fax:
322-3664 -
22,902.00
68,706.00
A United Water Approved Contractor
EA
1:950.00
5.850.00
Public Works License No. 14159 -AAA -4
Bid Date:
4-10.2015
Bid Prices Good For 15 Days From Bid Date
ITEM
DESCRIPTION QUANTITY
UNIT UNITPRICE
AMOUNT
SEWER
1 8" SDR35 Sewer Main 1,785.00
LF 22.00
39,270.00
- 2 48" Sewer Manhole 11.00
EA 1,804.00
19,844.
3 4" Sewer Service. 67.00
EA 400.00
26,800.00
WATER
4 8" C-900 Water Main
5 8" Gate Valve
6 Misc Fittings&Bends
7 Double Lot Service
8 Single Lot Service
9 Fire Hydrant Assv
TOTALWATER
STORM DRAIN
10 12" C-900 Storm Drain
11 12" SDR35 Storm Drain
12 15" SDR35 Storm Drain
13 16" C905 Storm Drain
14 18" PVC Storm Drain
15 18" C900 Storm Drain
16 48" Storm Manhole
17 Seepage Bed Complete
18 1000 Gallon Sand & Grease Trap
TOTAL STORM DRAIN
PRESSURE IRRIGATION.
1916" P -Ir, Main
20 4" P-Irr Main
22.00
LF
14.35
3,648.35
37,625.70
6.00
EA
1,057.00
1,464.00
6,342.00
1.00
LS
8,489.06
651.00
8,489.00
33.00
EA
1,233.00
6,939.00
40,689.00
3.00
EA
927.85
1,491.00
2,783.51
7.00
EA
3.286.00
624.00
23.002.0(1
131.00
LF
27.85
3,648.35
60.00
LF
24.40
1,464.00
20.00
LF
32.55
651.00
180.00
LF
38.55
6,939.00
42.00
LF
35.50
1,491.00
13.00
LF
48.00
624.00
3.00
EA
1,712.6511
5,137.95
3.00
EA
22,902.00
68,706.00
3.00
EA
1:950.00
5.850.00
LF 7.75 15,779.00
LF 5.75 9,556.50
Page 1 of 2
ITEM DESCRIPTION QUANTITY 1 UNIT 1 UNITPRICE AMOUNT
21 4" Gate Valve
4.00
EA
575.75
22 Misc Fittings & Bends
1.00
LS
3,028.50
23 P-Irr Lot Service
56.00
EA
305.00 1
24 8" C-900 Sleeve
150.00
LF
12.85
25 P -hr Drain
2.00
EA
742.75
TOTAL PRESSURE IRRIGATION
1 $5
26 Mobilization
1.00
LS
1,150.00
GRAND TOTAL $351,666.55
NOTES:
Unless Otherwise Indicated Above Price Excludes: Surveying, StakingCompaction Testing,Erosion Control, EPANotification,
Had Rock Excavation, Unsuitable Soil Removal, Handling and/or replacing, Landscaping,_ Concrete Utility Collars, Permits,
Permit Fees.
**DURATIONS** Sewer 12days, Water 14days, Storm 5 days, Irrigation 12 Days (1 day to sleeve out of Joint Trench's way)
PAYMENT: Payment due within 10 days of invoice date. A charge of 1.5% will be assessed Monthly to past due accounts.
Failure to make timely payment will become cause for work stoppage until account is current. All Material is guaranteed to be
as specified. All work to be completed in a workman hke manner according to standard practices. Any alteration or deviation
from above specifications involving extra cost, will only be executed upon written change orders, and will become an extra
(\ charge over and above the estimate.
AUTI30RIZED
ACCEPTED BY DATE:
Page 2 of 2
M
CMG
Estimate
Date Estimate #
5/3/2015 1326X
VENTANA COMMONS
Qty
Description
7287 W Airway Court
Boise, ID 83709
33,131.00
208-323-8408
POLE TYPE 180 25'100 WATT ANCHOR BASE POLE TYPE H,
STATE OF IDAHOy
pq,
ELECTRIC
LICENSE
C2209
PRICE DOES NOT INCLUDE TRAFFIC CONTROL & ACHD PERMITS IF
Estimate
Date Estimate #
5/3/2015 1326X
VENTANA COMMONS
Qty
Description
Total
ESTIMATE TO SUPPLY, WIRE & INSTAL 2 30' 250 WATT ANCHOR BASE
33,131.00
POLE TYPE 180 25'100 WATT ANCHOR BASE POLE TYPE H,
ESTIMATE INCLUDES: 90OFT OF TRENCHING, WIRE & CONDUIT. PERMIT.
PRICE DOES NOT INCLUDE TRAFFIC CONTROL & ACHD PERMITS IF
REQUIRED.
PRICE BASED UPON CONNECTING 2 LIGHTS ON MERIDIAN RD TO EXISTING
LIGHT POLE AT ENTRANCE. NO METER/PANEL IN ESTIMATE. SLEEVES BY
OTHERS.
PRICE INCLUDES: SPECIFIED AMOUNT OF TRENCHING,
WIRE & CONDUIT. PERMIT IF REQUIRED.
PRICE DOES NOT INCLUDE: EXTRA LABOR OR MATERIAL
IF ROCK OR WATER IS ENCOUNTERED. FINAL BILLING
MAY CHANGE DUE TO IN FIELD A.IDUSTMENTS.
PRICE GOOD FOR 45 DAYS FROM
DATE. NO WARRANTY ON LABOR
OR MATERIAL NOT SUPPLIED BY
B&B ELECTRIC. ONLY ITEMS ON
ITEMIZED LIST INCLUDED IN
ESTIMATE.
Signature
ALL MATERIALS REMAIN PROPERTY OF B&B
ELECTRIC UNTIL FINAL BILL IS PAID IN FULL. B&B T
ELECTRIC RESERVES THE RIGHT TO REMOVE
MATERIAL THAT HAS NOT BEEN PAID FOR /y
$33,131.00
-0�
.tta.na„n• BUTTE FENCE, INC.
2649 E. Wilson Lane
rP Meridian, ID 83642
mn9�
Phone (208) 884-0203
Fax (208) 884-8929
ID Cont. # RCE -2292 Nev. Lisc. #0075048 Ore. Lisc. #158340
ID Public Works # PWC -C -15911-B-4
Quote To: Conger Management Group
4824 W. Fairview Avenue
Boise, ID 83706
Phone ( )336-5355
Fax
Quote
Built Right, Built to Last
Customer No.: CONGER
Quote No.: 48537
Ship To: Ventana - cedar posts, #2 pickets
apprx. 2086' of 6' cedar, 1x6trim
apprx. 633' of 4' cedar, 1x6 trim
apprx. 691' of 5' wrought iron, 2 rail
Date
Ship Via
F.O.B.
Terms
06/10115 1
#2 pickets
Payable Upon Receipt
Purchase Order Number -
Sales Person
Required
633
Chuck Elliott
7.99
09/01115
Quantity item Number
Required Shipped B.O.
- Description
14.38
Unit Price
Amount
2086
6' cedar per foot
10,11
21089.46 v
#2 pickets
materials only
633
4' cedar per foot
7.99
5057.67
691
5' wrought iron
14.38
9936.58
2 horizontal rail system
materials per foot
1
concrete
2742.00
2742.00 ,
3410.000
installation
5.65
19266.50
111.00
fence removal/disposal
2.00
222.00 `!
1,000
post champing
285.00
285.00
4172.000
6' fall staining per side
2,50
0430.0
includes stain
1266.000
4' staining per side
2.35
2 75.
includes stain
STAINING EXISTING FENCE
1041.000
stain for 6' fence per side
2.65
275. 5
includes labor/stain
654.000
stain for 4' fenc6 per side
2.50
1 5.0
includes labor/stain
1695.000
pressure wash
1,25
18.7
This bld Is based upon approximate footage. The final costmay vary according to the actual product used and
labor required to complete the job. Permits, sprinkler fines and other unmarked lines are the customers
responsibility. Hard selland digging conditions may increase the pricy of labor. Any changes on the project
must be approved and signed by the customer.
This bid is valid for 30 days from date given.
Customer Signature Date
�b I - I -I —.-�
i• �:. �t 1*. •..'t
444 W. 6 M RD,
k, r 83687
To: CONGER MANAGEMENT GROUP
Contact:
Address: 1627 S ORCHARD SUITE 24
Phone:
(208)336-5355
BOISE, ID 83705
Fax:
(208)336-2282
Project Name: Ventana Pathways
Bid Number:
Project Location:
Bid Date:
Item # Item Description
Estimated Quantity Unit
Unit Price Total Price
Provide/Prep 3/4" road mix and asphalt for multi use
pathway (10' pathway required on lot 22-1)
Provide/Prep 3/4" road mix for common area sidewalk
pathway
ACCEPTED:
The above prices, specifications and conditions are satisfactory
and hereby accepted.
Buyer:
Signature:
Date of Acceptance:
1.00 LS $2,000.00 $2,000.00
1.00 LS $2,100.00 $2,100.00
Total Bid Price: $4�,1�000.00
CONFIRMED:
Nampa Paving & Asphalt Company
Authorized Signature:
Estimator: TREN SUNDQUIST
208-965-7157 TREN@NAMPAPAVING.COM
Page 1 of 1
Fx� bl-. 4
Ground Innovations LLC
/J
Ground Innovations LLC
89SDEWEYIN
2,700.00
NAMPA, ID 83687
o
(208)870-3220
• TREES
t3peterson@msn.com
qj
http://www.groundinnovations.com
2 192.00k
384.00
Conger Management Group
1627 S Orchard St., Ste. 24
Boise, ID 83705
04/11/2015 1059
• Finish Grading
1 2,700.001
2,700.00
• Irrigation System
1 ! 21,746.00i
21,746.00
• TREES
1
{
• Autumn Purple Ash 2"
2 192.00k
384.00
• Lavalle Hawthorn2"
8 189.00
1,512.00
• Chanticleer Pear 2"
11 203.00
2,233.00
• Austrian Black Pine 6'
6 185.00)
1,110.00
• Red Oak
1 240.00
240.00
• London Plane Tree
3 187.00;
561.00
• Tree Planting Labor (50% of material labor)
1 3,020.00;
3,020.00
-SHRUBS
(
• Burning Bush 5ga1
11 28.00;
308.00
•Viburnum Sgal
238.00
76.00
• Yellow Twig Dogwood 5gal
4 28.00
112.00
•Red Leaf Plum Sgal
9 32.00
288.00
• Shrub Planting Labor (50% of material costs)
C 1 j, 392.001
392.00
• Bark Mulch (material and labor)
20 I 70.001
1,400.00
• Gravel (material and placement)
1 51 32.001
1,632.00
• Sod (material and placement).
69958 0.361
25,184.88
Thank you foryour business.
Accepted By Accepted Date