HomeMy WebLinkAboutDrainage ReportW Aw
THE LAND GROUP, INC.
daPac Building
Meridian, Idaho
Storm Water Management
Engineering Drainage Report
Owner
Engineer
SNoI4 E
The Land Group, Inc. ��5 �G\ST�
Jason Densmer, PE
462 East Shore Drive 10g61
Eagle, Idaho 83616
Ph: 208.939.4041 Jr O6.03.15
OF '
\ N Dl N
June 3, 2015
Project No. 114121
Site Planning Landscape Architecture - Civil Engineering - Golf Course Irrigation & Engineering - Graphic Design • Surveying
462 E. Shore Drive, Suite 100 Eagle, Idaho 83616 • P 208.939.4041 - F 208.939.4445 www.thelandgroupinc.com
`rte L�
ANNETHE LAND GROUP, INC.
Site Description
IdaPac Building
Storm Water Management
Engineering Drainage Report
The project will construct an office building located at the northwest corner of the intersection of S.
Spanish Sun Way and S. Linder Rd. in Meridian, Idaho.
Peak Run -Off Rate & System Sizing
On -Site Drainage System Description & Areas
After development, the storm drainage from the site will sheet flow across the parking lots to catch basins.
Roof drainage from each structure will be collected in underground pipes and routed to catch basins or
other drainage structures.
The site is divided into tributary areas, each with its own drainage system. An overview of the site is given
in Appendix A.
Collected flows will be treated by sand and grease traps prior to discharge into subsurface seepage beds
below the parking lots. The seepage beds are designed to provide sufficient void space to accommodate
the 100 -year storm event. After the storm, collected drainage will infiltrate from the seepage beds into
the natural sub -soils. If the storm volume exceeds the design storm, excess collected storm water is
provided with an emergency overflow to existing storm drain systems which take flows offsite. In this
event, short-term ponding on the parking surfaces near inlets may occur.
The calculations presented in this report show that the proposed facilities are adequately sized to
accommodate the expected storm water runoff from the site.
Developed Storm Volume
The drainage systems have been designed to store the 100 -year, 1 -hour event. The drainage calculations
are shown in Appendix B.
or
Site Planning • Landscape Architecture • Civil Engineering • Golf Course Irrigation & Engineering - Graphic Design , Surveying
462 E. Shore Drive, Suite 100 • Eagle, Idaho 83616 • P 208.939.4041 • F 208.939.4445 • www.thelandgroupinc.com
THE LAND GROUP, INC.
Appendix A
Site Drainage Areas
Exhibit 1— Post -Development Tributary Basins
IdaPac Building
Storm Water Management
Drainage Report
Site Planning - Landscape Architecture • Civil Engineering , Golf Course Irrigation & Engineering • Graphic Design - Surveying
462 E. Shore Drive, Suite 100 - Eagle, Idaho 83616 - P 208.939.4041 • F 208.939.4445 - www.thelandgroupinc.com
1
�
41p� ti �
$1
RIM GVW -- - R/)R/W - Rl
S Linder Rd
— - M,ZI — -
Tributary Basins
HORIZONTAL SCALE: p' = 40'
IdaPac Building
Storm Water Management
THE LAND GROUP, INC. Engineering Drainage Report
Appendix B
Drainage Calculations
or
Site Planning • Landscape Architecture - Civil Engineering - Golf Course Irrigation & Engineering • Graphic Design • Surveying
462 E. Shore Drive, Suite 100 • Eagle, Idaho 83616 • P 208.939.4041 • F 208.939.4445 • www.thelandgroupinc.com
i—
(based on Zone "A" OF Curve, 100 -yr Return Period)
dollt
2,369 cf
THE LAND GROUP. INC.
2,520 cf System OK (Excess Capacity)
Drainage Area A
Impervious Area =
32,444 sf
Pervious Area =
0 sf
EArea =
32,444 sf
EArea =
0.74 acres
C Coefficient =
0.95
Drainage System Characteristics
- 2;20 1320
System Infiltration Rate =
8.00 in./hr
Swale Top Area =
- sf
Swale Bottom Area =
- sf
Swale Depth =
0.00 ft
Swale Volume =
- cf
InfTrench Width =
14.00 ft
Inf Trench Length =
60.00 ft
Inf Trench Depth =
7.50. ft
Storage Volume of trench =
2520 cf
Total Volume =
2,520 cf
Infiltration Area =
840 sf
Infiltration Rate =
560 cf/hr
Drainage Calculations
Basin Developed Volume
Prepared By: J. Densmer
Date: 06/03/2015
Project #: 114121
Storage Volume Required (100 -yr Storm)
(based on Zone "A" OF Curve, 100 -yr Return Period)
Maximum Runoff Developed =
2,369 cf
Intensity
2,520 cf System OK (Excess Capacity)
System Recovery
Maximum Runoff =
Time (min)
Time (sec)
(in/hr)
Q dev. (cfs)
V dev. (cf)
V mf: (cTF
Vs (cf)
10
600
,3.11
- 2;20 1320
-
93 -
1,227
15
900
2.62
- 1 85
1 668
140 -
1 528
20
.._,
228
r,,... 161„
1936
187 3,
.,.
1749
30
.,.._. ... ............
1800
....
1.82
.......
- 1 29 ................
2 318
280
2 038
40
.....
,,,,,,,,, 2400
......
,,.,,.,1.37
.....
.,.......
..
..,,,,......
.. ........
......... ...........
1953
.. .. .......
_.,,,,
50
........ .,,.
,.,,,,,,,,_ 3 000
.,.,
1.17
.....,,,..
.,..,.., 0.83 ,. ,,,
2 484
467 _
....... ... ..... ..
2,017
60
......... ......... ...... ...........
3,600
.............
1.15
...........
0.81
;......... .,..........,
2,929
„.... ......... .,,;,,,....,,..
560 ...........,
120 ,,,,,,,,,,,,,
.................. .-...
7200
._.......
...0„66
.,, ...... 047,........
3362 -
.,, ........
,....1120 .,,
,,,,,,,,, 2242 ..........
0 . ..........,
......... . .. ..18......
10,800
....................
,.,._0:48
i.......... 0.34 ..............
3 668 -
.
-
1 680 -,..........
d_.,..,., ..
1 988 .,........
360 ,,,,,,,,,,,,,,,,
.,,..... ....
21,600
......... ............
0.30
,.,.,.... 021
4585,.,,
3,360 _,,,,.,,.,,,,,,
1225
.,......, ..
...
.. 0.:19
._,....... 0 13 .......
......
o
5 808
........ .
.,.,,...
6,720 -,
... ...
.,.,,........
.,... 0 _.........
1,440
_ 86,400
0.12
0.08
7,336
13,440
0
System Checks
Maximum Runoff Developed =
2,369 cf
Total Volume Provided =
2,520 cf System OK (Excess Capacity)
System Recovery
Maximum Runoff =
2,369 cf
Other Sources =
0 cf
Percolation Volume =
2,369 cf
Recovery Time =
4.2 hours Recovery OK (<24 hrs)
System Summary: 14.00 ft wide x 7.50 ft deep x 60.00 ft long
D 150603 SDCalcs 114121.xlsx
Drainage Calculations
Basin Developed Volume
Prepared By: J. Densmer
Date: 06/03/2015
Project #: 114121
Storage Volume Required (100 -yr Storm)
(based on Zone "A"
IDF Curve, 100 -yr Return Period)
966 cf
THE LAND GROUP, INC,
Intensity
Drainage Basin B
Impervious Area =
13,286 sf
Pervious Area =
0 sf
EArea. =
13,286 sf
IArea =
0.31 acres
C Coefficient =
0.95
Drainage System Characteristics
........3.11 ..........
System Infiltration Rate =
8.00 in./hr
Swale Top Area =
- sf
Swale Bottom Area =
- sf
Swale Depth =
0.00 ft
Swale Volume =
- cf
Inf Trench Width =
7.00 ft
Inf Trench Length =
50.00 ft
Inf Trench Depth =
7.00 ft
Storage Volume of trench =
980 cf
Total Volume =
980 cf
Infiltration Area =
350 sf
Infiltration Rate =
233 cf/hr
Drainage Calculations
Basin Developed Volume
Prepared By: J. Densmer
Date: 06/03/2015
Project #: 114121
Storage Volume Required (100 -yr Storm)
(based on Zone "A"
IDF Curve, 100 -yr Return Period)
966 cf
Total Volume Provided =
Intensity
System Recovery
Maximum Runoff =
966 cf
Time (min)
Time (sec)
(in/hr)
Q dev. (cfs)
V dev. (cf)
V inf. (cf)
Vs (cf)
........... ..
. 10,,, ..........
600
..........
........3.11 ..........
090 .. ...........
541
39
502
...15.....,.......
900
......2,:62 .............
076...........4
........
683
..., „ ,
......,...........................,,...,.
625
20
..... ..
..... 1,200
2.28
...
0.66
793
......58 „„,
78
........
715
30,,,.
... ._ _ „
..., 1 8001.82
.......
.................
0 53
....., ......._...
948,,
.......... _,.,......
117
........,.
833
.... 40 ...........^
2400 ....
.,,,.._1.37 .........,
040.,........
...
953 ...
.,,. „
156
......., .........
797
50..
3000
1017
194
.. .......:.
823
..._ ......... ...........
..
.,,,.1.17 1034
...............
....-_
�... ...... ......
„.. 60
3 600 ..
1.15 -
.,, .....
0 33
......._
1 200
.....,,,,._..
120
7,200 -
0.66
0 19 -
1,377
,233 _.
467
910
180
... ..,..
10 800 -
... .,
0.48
„ 0 14_
1,502
700 .
802
360
.._ ...
21 600 .,
0.30
._,..,... ..,
....
. 0 09
......
1 878
...
1400
.........,.
478
720
.,...
43 200
..... ,..
.0.19
„ ...
0 06
..........
2 378
...........
o. .....
2,800
_.........,.
0
1,440
1 86,400 _
0.12 _
0.03
3,004
..
5,600
„ ......
0
System Checks
Maximum Runoff Developed =
966 cf
Total Volume Provided =
980 cf System OK (Excess Capacity)
System Recovery
Maximum Runoff =
966 cf
Other Sources =
0 cf
Percolation Volume =
966 cf
Recovery Time =
4.1 hours Recovery OK (<24 hrs)
System Summary: 7.00 ftwide x 7.00 ft deep x 50.00 ft long
D 150603 SDCalcs 114121.xlsx