Loading...
HomeMy WebLinkAboutWastewater Plant Lab Building Expansion and New Administration Building - Drainage ReportDrainage Report for City of Meridian Wastewater Plant Lab Building Expansion and New Administration Building Prepared for City of Meridian Public Works 33 E. Broadway Ave. Meridian, Idaho 83642 Prepared by SPF Water Engineering, LLC 300 East Mallard, Suite 350 Boise, Idaho 83706 (208) 383-4140 June 5, 2013 SPF WATER ENGINEERING I Table of Contents 1. Project Overview...............................................................................................................1 2. Existing Conditions............................................................................................................1 2.1. Site Geology..........................................................................................................2 2.2. Groundwater..........................................................................................................2 3. Proposed Conditions.........................................................................................................2 3.1. Methodology..........................................................................................................4 3.2. Peak Flows............................................................................................................5 3.3. Retention Facility Design.......................................................................................5 3.4. Pipe Sizing............................................................................................................5 4. Summary ..................... ............. ......................................................................................... 5 Appendices Appendix A Drainage Basin Map, Site Utility Plans, and Pond Grading Details Appendix B Runoff, Pond Sizing and Pipe Conveyance Calculations Appendix C Geotechnical Report SPF Water Engineering, LLC Page ii Meridian WWTP Lab & Admin. Bldg. 790.0260 & 726,0270 6/5/13 Drainage Report