Loading...
HomeMy WebLinkAboutVJ Investments Bldg. 2 at Porky Park Sub - Drainage CalculationsDRAINAGE CALCULATIONS FOR VJ INVESTMENTS BLDG. AT PORKY PARK SUBDIVISION MERIDIAN, IDAHO MAY 2012 NT TNGER ENGINEERING , MEI # 12-008-00 2 INC. 4090 WEST STATE STREET, SUITE 29- BOISE, IDAHO - 83703 PHONE: 426-8314 FAX: 426-8319 DRAINAGE CALCULATION SUMMARY Project: VJ linvestments Bldg. #2 at Porky Park Project #: 12-009-00 Date: 5/15/2012 The stormwater runoff on the project site will be collected and treated via sand/ grease traps. The stormwater will then be treated by sand filtration prior to discharging into the receiving soils. Roof runoff will be discharged to the surface and directed to the storm drain systems. The runoff was calculated using a 100yr, 1 hr design storm (V runoff), for volume. The "c" value used in calculating the runoff is based upon the amount of landscape in the area. Roof runoff from the building is directed to drain into the systems. SYSTEM AREA "C" Value 1 53,300 0.9 2 42,850 0.9 3 132,940 0.9 DmCalcs-VJ BLDG 2.xls Summary 1 VJ linvestments Bldg. #2 at Porky Park Drainacie Area # 1 Area (acres): 1.22 C value: 0.90 Initial Trench Volume = 1 in x (Area (ac) x 43560cu.ft./2c) x 1ft./12in. x "C Volume = 3998 cu. ft. Req'd Storage Vol. = 3998 ft' Trench Dimensions = 6 Depth (ft) 8 Width (ft) 165 Length (ft) Storage/ft= (Vr)(D)(W) D= = 19.2 ft2 W = Bottom Perc/ft = (W)(Pr)(1ft/12") Vr = = 5.33 ft2 Pr = Trench Volume = (Length)(Storage/ft + Bottom perc/ft) Trench Volume = 4048 ft' Velocity in throat Flow = Q25=C*i25*a 6 ft Depth 8 ft Width 40 % Drain Rock Void Ratio 8 in./hr Percolation Rate i25= 3.1 time of concentration < 5min (in/hr) Q25= 3.4 cfs 1/2 per box Velocity = 025/A A= area of throat in box A= W*T A= 4.00 sq. ft. A= width of box . throat opening W= 4.00 1000 gal s/g tra[p T= 1.00 Velocity = 0.43 ft/ sec DrnCalcs-VJ BLDG 2.xls Area 1 2 VJ linvestments Bldg. #2 at Porky Park Drainage Area # 2 Area (acres): 0.98 D = C value: 0.90 Depth Initial Trench Volume = 1 in x (Area (ac) x 43560cu.ft./ac) x 1ft./12in. x "C Volume = 3213.75 cu. ft. Req'd Storage Vol. = 3214 ft' Trench Dimensions = 6 Depth (ft) = 8.00 ftZ 12 Width (ft) 8 in./hr 90 Length (ft) Storage/ft = (Vr)(D)(W) D = 6 ft Depth = 28.8 ft2 W = 12 ft Width Bottom Perc/ft = (W)(Pr)(1ft/12") Vr = 40 % Drain Rock Void Ratio = 8.00 ftZ Pr = 8 in./hr Percolation Rate Trench Volume = (Length)(Storage/ft + Bottom perc/ft) Trench Volume = 3312 ft' Velocity in throat Flow= Q25=C*i25*a i25= 3.1 time of concentration < 5min (in/hr) Q25= 2.7 cfs Velocity = Q25/A A= area of throat in box A= W*T A= 6.68 sq. ft. A= width of box . throat opening W= 4.00 1000 gal s/g tra[p T= 1.42 = 17" Velocity = 0.48 ft/ sec DmCalcs-VJ BLDG 2.xls Area 2 3 L VJ linvestments Bldg. #2 at Porky Park Drainaae Area # 3 C value: 0.90 Initial Trench Volume = 1 in x (Area (ac) x 43560cu.ft./ac) x 1ft./12in. x "C" Volume = 9970.5 cu. ft. Req'd Storage Vol. = 9971 ft3 Trench Dimensions = 6 Depth (ft) 12 Width (ft) 275 Length (ft) Storage/ft = (Vr)(D)(W) D = 6 ft Depth = 28.8 ft2 W = 12 ft Width Bottom Perc/ft= (W)(Pr)(1ft/12") Vr= 40 % Drain Rock Void Ratio = 8.00 ft2 Pr = 8 in./hr Percolation Rate Trench Volume = (Length) (Storage/ft + Bottom perc/ft) Trench Volume = 10120 ft' Velocity in throat Flow= Q21 =C*i2l*a i25= 3.1 time of concentration < 5min (in/hr) Q25= 8.5 cfs divide between three boxes Q25= 2.8 cfs Velocity = Q25/A A= area of throat in box A= W'T A= 5.68 sq. ft. A= width of box . throat opening W= 4.00 1000 gal s/g tra[p T= 1.42 = 17" Velocity = 0.50 ft/ sec DmCalcs-VJ BLDG 2.xls Area 3 4