Loading...
HomeMy WebLinkAboutVJ Investments Bldg. 2 at Porky Park Sub - Drainage Calculations (2)VlEI'# 112-008-00 DRAINAGE CALCULATIONS FOR VJ INVESTMENTS BLDG. 2 AT PORKY PARK SUBDIVISION MERIDIAN, IDAHO MAY 201 S CONAL p ) T v' 66f z y�9TT ov 10��Q M M_. 'NGIZV EERING live. 4090 WEST STATE STREET, SUITE 29- BOISE, IDAHO - 83703 PHONE 428-831} FAX: 428-8319 DRAINAGE CALCULATION SUMMARY Project: VJ linvestments Bldg. #2 at Porky Park Project #: 12-009-00 Date: 5/15/2012 The stormwater runoff on the project site will be collected and treated via sand/ grease traps. The stormwater will then be treated by sand filtration prior to discharging into the receiving soils. Roof runoff will be discharged to the surface and directed to the storm drain systems. The runoff was calculated using a 100yr, 1 hr design storm (V runoff), forvolume. The "c" value used in calculating the runoff is based upon the amount of landscape in the area. Roof runoff from the building is directed to drain into the systems. 1 K DmCalcs-VJ BLDG 2.x1s Summary VJ linvestments Bldg. #2 at Porky Park Drainaae Area # t Area (acres): 1.22 C value: 0.90 Initial Trench Volume = 1 in x (Area (ac) x 43560cu.ft./ac) x 1ft./12in. x "C" Volume = 3998 cu. ft. Req'd Storage Vol. = 3998 ft' Trench Dimensions = 6 Depth (ft) 8 Width (ft) 165 Length (ft) Storage/ft = (Vr)(D)(W) D = 19.2 ft2 W = Bottom Perc/ft = (W)(Pr)(1ft/12") Vr = 5.33 ft2 Pr = Trench Volume = (Length)(Storage/ft+ Bottom perc/ft) Trench Volume = 4048 ft' Velocity in throat Flow= Q25=C*i25*a 6 ft Depth 8 ft Width 40 % Drain Rock Void Ratio 8 in./hr Percolation Rate i25= 3.1 time of concentration < 5min (in/hr) Q25= 3.4 cfs 1/2 per box Velocity = Q25/A A= area of throat in box A= W*T A= 4.00 sq. ft. A= width of box . throat opening W= 4.00 1000 gal s/g tra[p T= 1.00 Velocity = 0.43 fU sec DrnCalcs-VJ BLDG 2.xls Area 1 2 VJ linvestments Bldg. #2 at Porky Park Drainage Area # 2 C value: 0.90 Initial Trench Volume = 1 in x (Area (ac) x 43560cu.ft./ac) x 1ft./12in. x "C" Volume = 3213.75 cu. ft. Req'd Storage Vol. = 3214 ft' Trench Dimensions = 6 Depth (ft) 12 Width (ft) 90 Length (ft) Storage/ft = (Vr)(D)(W) D = 28.8 ft' W = Bottom Perc/ft=(W)(Pr)(1ft/12") Vr= 8.00 ft2 Pr = Trench Volume = (Length)(Storage/ft + Bottom perc/ft) Trench Volume = 3312 fe Velocity in throat Flow = Q25=C`i25*a 6 ft Depth 12 ft Width 40 % Drain Rock Void Ratio 8 in./hr Percolation Rate i25= 3.1 time of concentration < 5min (in/hr) Q25= 2.7 cfs Velocity = Q25/A A= area of throat in box A= W`T A= 5.68 sq. ft. A= width of box . throat opening W= 4.00 1000 gal s/g tra[p T= 1.42 = 17" Velocity = 0.48 ft/ sec DmCalcs-VJ BLDG 2.x1s Area 2 3 VJ linvestments Bldg. #2 at Porky Park Drainage Area # 3 C value: 0.90 Initial Trench Volume = 1 in x (Area (ac) x 43560cu.ft./ac) x lft./121n. x "C" Volume = 9970.5 cu. ft. Req'd Storage Vol. = 9971 ft' Trench Dimensions = 6 Depth (ft) 12 Width (ft) 275 Length (ft) Storage/ft = (Vr)(D)(W) D = 6 ft Depth = 28.8 ft2 W = 12 ft Width Bottom Perc/ft = (W)(Pr)(1ft/12") Vr = 40 % Drain Rock Void Ratio = 8.00 ft Pr= 8 in./hr Percolation Rate Trench Volume = (Length)(Storagelft + Bottom perc/ft) Trench Volume = 10120 ft' Velocity in throat Flow = Q25=C*i25*a i25= 3.1 time of concentration < 5min (in/hr) Qts= 8.5 cfs divide between three boxes Q25= 2.8 cis Velocity = Q25/A A= area of throat in box A= W*T A= 5.68 sq. ft. A= width of box . throat opening W= 4.00 1000 gal s/g tra[p T= 1.42 = 17" Velocity = 0.50 ft/ sec DmCalcs-VJ BLDG 2.xls Area 3 4 �[C Y 5� a B � o is a o € a 0 q a 9 Q is� 9;4o- I, I flq C is i8'�.- is �n•A � � It c�._ � r , , r IY r 6L ", ar — — EI tI �. IEiII.t lllf fl is — �3sv �7rhvYuo � tin' ,viz -�' r,�wa rg is c tl itra x 1 to 1 P # 1I / !8 is ,a `g ��:. ., F% Y3NY 39VNML0 Ib � ,t r ri i � s —• ni r; -�� ��^....a; al s - Ln us :�,;:k axfll-�m 1 it ,s x