Loading...
HomeMy WebLinkAboutPSI Corporate Office (3)Water Management • Geographic Info Systems • Landscape Archdecture • Erosion Control • Land Planning • Graphic Communication . Irrigation Design TRANSMITTAL ru f m � � m- @ To: Mr. Andrew Davis, AIA, NCARB, LEED AP ` Breckon Land Design Inc. APR 1 5 ZDi3 Past Office Box 44466 BRS Architects Boise, Idaho 83711 Aril 15, 2013 ph: 208-3765153 Address: fax: 208-37 -6528 Job #: xavw.breckonlantldesion.com,n.com Water Management • Geographic Info Systems • Landscape Archdecture • Erosion Control • Land Planning • Graphic Communication . Irrigation Design TRANSMITTAL ru f m � � m- @ To: Mr. Andrew Davis, AIA, NCARB, LEED AP From: Jon Breckon APR 1 5 ZDi3 Company: BRS Architects Date: Aril 15, 2013 ay Address: 1010 S. Allante Place, Suite 100 Boise, Idaho 83709 Job #: 13016.01 Project: PSI Corporate Office Phone Number: 208-336-8370 Fax Number: 208-336-8380 Cc: file ENCLOSURESINCLUDE: ® Plans ❑ Samples ❑ Other ❑ Specifications ❑ Submittal Data ❑ ❑ Copy of Letter ❑ Change Order ❑ NOTES: PSI CORPORATE OFFICE STORMWATER RUNOFF MANAGEMENT AND TREATMENT CALCULATIONS Address: 2204 East Lanark Street Meridian, Idaho 83642 PREPARED BY: TE � Breckon Land Design, Inc. P.O. Box 44465 Boise, Idaho 83711 ph: (208) 376-5153 fax: (208) 376-6528 Project No. 13016.01 April 12, 2013 PURPOSE The purpose of this report is to confirm that the on-site storm water management system design for the PSI Corporate Office is adequate for the 100 year design storm per the Idaho Department of Environmental Quality standards. SITE DESCRIPTION The proposed site is located at 2204 East Lanark Street, Meridian, Idaho 83642. The limits of construction are approximately 2.00 acres as shown on the attached site plan. Currently the site is a relatively flat with existing improvements. Runoff water from the site is conveyed to valley gutters and curb gutters that flow water to an underground drainage system. The post development runoff will divide runoff between new grass infiltration swales and a new underground seepage bed. The site is bordered by commercial development on the north, south, west, and east. Dewatering is not expected. DESIGN CRITERIA The system is designed to accommodate the 100 year design storm using infiltration basin (swale) designs in accordance with recommendations given by the IDEQ Storm Water Best Management Practices Catalog. The storm water runoff flows were calculated using the Rational Method with a weighted post development runoff coefficient calculated for each drainage area. The rainfall intensity used was taken from the Intensity -Duration -Frequency Curve for Zone A in the IDEQ Storm Water Best Management Practices Catalog for the 100 year design storm. See Appendix B fora copy of this curve. PEAK FLOW ANALYSIS OUTLINE The proposed storm drainage piping system is sized to provide the necessary capacity to convey the 100 -year storm event and to provide for initial settlement of sediments in the runoff. The following steps were taken to design the storm drain lines. 1. Calculate the individual drainage basin areas (A) and estimate the Runoff Coefficient (C) and Time of Concentration (T) values for the developed basins. 2. Determine the maximum flow for each basin using the Rational Equation (Q=CIA), determining the Rainfall Intensity (1) from the Zone A Intensity -Duration -Frequency curves from the estimated T values. 3. Size the storm drain lines, sand and grease traps and inlets to accommodate the peak flows. PEAK FLOW ANALYSIS RESULTS The storm system has been sized to accommodate the 100 -year peak flow rates. Appropriately sized infiltration trenches have been located to provide initial settlement of sediments in the runoff and to accommodated storm water on site. DESIGN STORM DETENTION ANALYSIS OUTLINE The proposed storm drainage detention system is sized to provide the necessary capacity to store the 100 -year storm event and to provide for initial settlement of sediments in the runoff. The following steps were taken to design the storm drain retention. Calculate the individual drainage basin areas (A) and estimate the Runoff Coefficient (C) and Time of Concentration (T) values for the developed basins. 2. Determine the maximum flow for each basin using the Rational Equation (Q=CIA), determining the Rainfall Intensity (1) from the Zone A Intensity -Duration -Frequency curves from the estimated T values. 3. Size the swale area and seepage bed size to accommodate the required volume. 100 YEAR DETENTION RESULTS The proposed detention basin system and underground seepage bed has been designed to adequately detain the 100 -year design storm event. Appendix A Drainage Basin Map: N.T.S. DRAINAGE AREA #3 TOTAL SQ: 41,014.26 sq.ft. TOTAL AC: 0.94 Impervious: 13,625.69 sq.ft. Ac: 0.31 Pervious: 27,388.57 sq.ft. Ac: 0.63 Ll DRAINAGE AREA #2 TOTAL SQ: 7,846.88 sq.ft. TOTAL AC: 0.18 Impervious: 3,627.13 sq.ft. Ac: 0.084 Pervious: 4,219.75 sq.ft. Ac: 0.096 DRAINAGE AREA #1 TOTAL SQ: 29,090.65 sq.ft. TOTAL AC: 0.667 Impervious: 16,051.13 sq.ft. no Ac: 0.37 Pervious: 13,039.52 sq.ft. Ac: 0.30 \ '����1"Tlz Appendix B Intensity -Duration -Frequency Curve 2 0.0 16,0 10.0 6.o 6.0 U O. 4.0 w Z.O 1.0 z O,e as r 0,4 w 1 02 z 0.1 J 08 LL A 6 .Z A4 ENSIMMMMMEN INNINNIFAMME ■■■ h NO 6/1 NO YE FRf9UENCY ANALYSIS 8Y M17800 Of ExiRrN£ VAUES; Ar7YR 6044' 11 M=ME w ■■ M■ ■t ■m 5 10' 15 20 3O 40 50 60 2 , , 3. 4 5 6 ' 0 10 12 Ii 2' M I N U 7 E 3 N`O 'W R S!,, 0 U R A T I'0 N Appendix C Runoff Coefficients Table C-1. Typical "C" Values Description of Area Runoff Coefficients Business Downtown Areas 0.70-0,95 Neighborhood Areas 0.50 - 0.70 Residential Single -fancily areas 0.30-0,50 MUlti-units, detached 0.40-0.60 Multi -units, attached 0,60-0.75 Residential (suburban) 0.25-0.40 Apartment dwelling areas 0.50 -0.70 Industrial Light Areas 0.50-0.80 Heavy Areas 0.60 - 0.90 Parks, cemeteries 0.10- 0.25 Playgrounds 0.20 - 035 Railroad yard areas 0.20-0,40 Unimproved areas 0,10-0.30 Streets Asphalt 0.70-0.95 Concrete 0.80-0.95 Brick 0.70-0,85 Drives and Walks 0,75-0,85 Roofs 0.75. 0,95 Lawns - course textured soil (greater than 85/ sand) Slope: Flat, 2% 0.05-0.10 Average, 2-7% 0.10-0,15 Steep, 7/ 0.15-0.20 Lawns - fine textured soil (greater than 40% clay) Slope:. Flat, 2% 0,13-0,17 Average, 2-7% 0.18-0.22 Steep, 7% 0.25-0.35 44 Developing Your Sturonvater Pollution Prevention Plan: A Guide for Caustn¢non Sites Appendix D Storm Water Calculations PSI Corporate Office, Meridlan, Idaho Infiltration Characteristics (floor only): Infiltration Rate = '!2 in per hr Width Width 2x - Length Length (2x) - A perc. _ 1500 sf Q pore. = 250.00 cf perhr 4 perc. - 0.0694 cfs Infiltration Characteristics ( 213 sidewalls only): Infiltration Rate = 2 in per hr Width 2x - 30 ft Length (2x) - 200 ft Aperc. - 429.84 sf Q perc. - 70.81 of per hr Q perc. - 0.0197 cis STORAGE VOLUME Time Time (min,) (sec. REQUIRED f100 Intensity inches/hr Year Storm): Q dev, cfs Vin c(CO(CO V out V storage 5 300 4.4 1.80 541 211 520 10 600 3.2 1.31 787 42 745 15 900 2.5 1.02 922 63 860 20 1200 2.2 0.90 1,082 83 999 30 1800 1.6 0.66 1,181 125 1,056 40 2400 1.4 0.57 1,377 167 1,211 50 3000 1.2 0.49 1,476 208 1,267 60 3600 1.1 0.45 1,623 250 1,373 120 7200 0.6 0.25 1,771 500 1,271 1801 10800 0.45 0.18 1,992 750 1,242 240 14400 0.35 0.14 2,066 1,000 1,066 300 18000 0.3 0.12 2,214 1,250 964 360 21600 0.26 0.11 2,302 1,500 802 480 28800 0.22 0.09 2,597 2,000 597 600 36000 0.18 0.07 2,656 2,6001 156 720 43200 0.14 0.06 2,479 3,000 -521 1080 64800 0.12 0.05 3,188 4,500 -1,312 1440 86400 0.085 0.03 3,011 6,000 -2,989 Vs Max = 1,373 of Maximum Storage Required Bed Volume (380J. Voids) Bed Volume (x 15%) 1 hour 2hours 3 hours 4 hours 5 hours 6 hours 6 hours 10 hours 12 hours 18 hours 24 hours Vs Max = 1,373 of IMaAmum Storage Required 1 1000 al & 11500 al Sand and Grease Trapb Amcor Pre Cast A b- V sw = .. 2,7471sfof 6" deep swale required Velocity = sf V sw = 1,;331 sf of 9" deep Swale required ._',9,15.5 , .086.7- ) sf V sw - 1,373 sf of 12" deep swale required 457.8 sf Ih = 0.9155 ft Swale Size= 15r 15 ft VA x 100 ft long x 0.92 ft dee Velocity Throuah Baffle: Type: 1 1000 al & 11500 al Sand and Grease Trapb Amcor Pre Cast A b- 41V ISee appendix D Q 10 min. 1.31 lots 1100 year Peak Q dev. At 10 min duration Velocity = 0.33 ft persec. See ace Bed Recove Time Floor: V s - k1 373 c# erc = 250.00 cf per hr Time Rec= I 5:5 hours See a e Bed Recove Time 213 sidewalls : Vs= 1,373112f Q erc= 70.811cf per hr Time Rec = 19.4 hours TI eRec=l 0.811days Wei hted Runoff Coefficient "C" Runoff coefficients= 0.95 paved (impervious) 0.2 landscape (pervious) MIm ewious area = 16,051:13 sf 15248.574 sf Pervious area = 13,039.52 sf 2607.904 sf Total Area = 129,090.051af 1 0.81 °C" of 18" deep swale required of 24" deep Swale required of 36" deep swale required PSI Corporate Office, Meridian, Idaho - - Infiltration Characteristics (floor only): Infiltration Rate = s2 in per hr Width = ..,'10 ft Length - 60 ft A pare, - 600 sf Q Pere. - 100.00 of perhr Q Pere, - 0.0278 cfs Time Intensity Q dev. Vin Infiltration Characteristics t 2l3 stdewalls onlvl: Infiltration Rate = 2 in per hr Width x - 20 ft Length 2x - 120 ft A perc. - 136.51 sf Q erc. - 22.75 of perhr Q perc. - 0.0063 cfs V out V 2 hours 3 hours 4 hours 5 hours 6 hours 8 hours 10 hours 12 hours 18 hours 24 hours Vs Max = 290 of Maximum Storage Required Vsb= V sb 15% = 877.! De tn— See a e Bed Size = Vs Max = VSW= Vsw= Vsw= Denth = Bed Volume (38% Voids) Bed Volume (x 15%) 290 cr lMaximum Storage Required 5801 sf of 6" deep swale required 193.3. ', sf of 18" deep swale required 3871 sf of 9" deep swale required 10.0 '. sf of 24" deep swale required 290-; sf of 12" deep swale required - 96.7 sf of 36" deep swale required Velocity Throuah Baffle: Type: 1 1000 al & 1 1500 al Sand and Grease Trap by Amcor Pre Cast Ab= See appendix D Q 10 min. 0.32 cfe 100 year Peak Q dev. At 10 min duration Velocity = 0.08 ft per sec. See are Bed R cover Time floor V s = 290 cf Q perc -- I 100.00 cf per hr Time —Re"---] 2.9 hours Seenacie Bed Recovery Time 213 sidew lls : V s = 290 cf Q e rc= 22.75 cf perhr 11 Time Rec= I 12.7 hours Time Rec = I 0.53 da s Weighted Runoff Coefficient "C" Runoff coefficients= 0.95 paved (impervious) 0.2 landscape (pervious) Im Lious area= -':1)862713 sf 3445.7735 sf Pervious area= 4,219:75 sf 843.95 sf Total Area= I1,7;846;88 sf 0.651"C', PSI Corporate Office, Meridian, Idaho Infiltration Characteristics (floor only): Infiltration Rate = 2 inper hr Width = 15 ft Length - r55 ft A erc. - 825 sf Q erc. - 137.50 of er hr Q arc. - 0.0382 cis Infiltration Characteristics ( 213 sidewalls only): Infiltration Rate = 2 in per hr Width 2x - 30 ft Length 2x - 110 It A erc.- 677.20 sf Q Pero, - 112.87 cf per hr Q pore, - 0.0314 cis STORAGE Time min. VOLUME REQUIRED (100 Year Storm): Time Intensity Q dev, sec. inchesrhr) (of$) Vin (c V out c V storage c 61 300 4.4 2.14 641 11 630 101 600 3.2 1.55 933 23 910 151 900 2.5 1.21 1,093 34 1,059 201 1200 2.2 1.07 1,282 46 1,237 301 1800 1.6 0.78 1,399 69 1,330 401 2400 1.4 0.68 1,632 92 1,541 501 3000 1.2 0.58 1,749 115 1,634 601 3600 1.1 0.53 1924 138 1,786 1201 7200 0.6 0.29 2,099 275 1,824 180 10800 0.461 0,221 2,351 413 1,948 240 14400 0.35 0.17 2,448 - 550 1,898 300 18000 0.3 0.15 2,623 688 1,936 360 21600 0.26 0.13 2,728 825 1,903 480 28800 0.22 0.11 3 078 1 100 1,978 600 36000 0.16 0.09 3,148 1,375 1,773 720 43200 0.14 0.07 2,938 1,650 1,288 1080 64800 0.12 0.06 3,777 2,475 1,302 1440 86400 0.085 0.04 3,568 3,300. 268 Vs Max= 1,978 cf IMaximum Storage Required Seepage Bed Volume (38% Voids) Seepage Bed Volume (x 15%) Seepace Bed Depth Reduired ....... I, hour, hoour) 2 hours 3 hours 4 hours 6 hours 6 hours 8 hours 10 hours 12 hours 18 hours 24 hours Vs Max = 1,978 cf Maximum Storage Required 1 1000ga1 Sand and Grease Trapb Amcor Pre Cast A b= Vsw= 3,95611. sf of 6" deep swale required 1;$18.6 1sf V sw = 263,71 at of 9" deep swale required 989.0 -, sf V sw = _ 1,978; sf of 12" deep Swale required 659.3 sf De lh= 2.3975 it Seale Size= 15 ft wide x 55 ft long x 2.40 it deep I Velocity Through Baffle: Type: 1 1000ga1 Sand and Grease Trapb Amcor Pre Cast A b= 416f See appendix D Q 10 min. 1.55 cis 1100 year Peak Q dev. At 10 min duration Velocl = 0.39It per sec. Sea a e Bed Recove Time floor: Vs= 1,978cf Q erc= 137,501 cf perhr Time Rao = 14.41 hours Seepage Bed Recovery Time 213 sidewalls : Vs= 1,978cf Q erc= 112.87cf per hr Time Rao= I 17.5hours Time Rao = I 0.73 days Wei hted Runoff Coeffigkill= Runoff coefficients= 0.95 paved (impervious) 0.2 landscape (pervious) Im ervlous area = 13;625:69 sf 12944.408 sf Pervious area = 27;388:57 sf 1 8216.571 Isf Total Area =41,01 .26 sf I 0.52 "C" of 18" deep swale required of 24" deep Swale required of 36" deep swale required MANHOLE FRAME AND COVER PER IDAHO PUBLIC WORKS 5TDS. (TYP) INLET PIPE (SEE POR ORIENTATIC TOP VIEW MANHOLE FRAME AND — COVER PER IDAHO PUBLIC WORKS STANDARDS. (TYP) M GRADE ADJU5TINO RIN65��� $-.6 ro INLET PIPE WEIR ELEVATION �m r M P ..V-4 1/8"�:.., .....:. Y-6 SIDE VIEW NOTES TO 5EEPA6E BED OUTLET TO 5EEPA6E HED 1. 1000 GALLON PRECAST CONCRETE BOX USE FA5RICATIOR5 5TARDARD 512E A5 MANUFACTURED BY AMCOR PRECAST. 2. INV. IN. > WEIR ELEV. BY I" MIN. UNLESS OTHERAfSE INDICATED ON PLANS. 3. INV. OUT < WEIR ELEV. BY 3" MIN. UNLESS OTHF-RN15E INDICATED ON PLANS, 1 1000 A A TT 11 SAND PSI CORPORATE OFFICE STORMWATER RUNOFF MANAGEMENT AND TREATMENT CALCULATIONS Address: 2204 East Lanark Street Meridian, Idaho 83642 PREPARED BY: x , �§ Breckon Land Design, Inc. P.O. Box 44465 Boise, Idaho 83711 ph: (208) 376-5153 fax: (208) 376-6528 Project No. 13016.01 April 12, 2013 PURPOSE The purpose of this report is to confirm that the on-site storm water management system design for the PSI Corporate Office is adequate for the 100 year design storm per the Idaho Department of Environmental Quality standards. The proposed site is located at 2204 East Lanark Street, Meridian, Idaho 83642. The limits of construction are approximately 2.00 acres as shown on the attached site plan Currently the site is a relatively flat with existing improvements. Runoff water from the site is conveyed to valley gutters and curb gutters that flow water to an underground drainage system. The post development runoff will divide runoff between new grass infiltration swales and a new underground seepage bed. The site is bordered by commercial development on the north, south, west, and east. Dewatering is not expected. DESIGN CRITERIA The system is designed to accommodate the 100 year design storm using infiltration basin (swale) designs in accordance with recommendations given by the IDEQ Storm Water Best Management Practices Catalog. The storm water runoff flows were calculated using the Rational Method with a weighted post development runoff coefficient calculated for each drainage area. The rainfall intensity used was taken from the Intensity -Duration -Frequency Curve for Zone A in the IDEQ Storm Water Best Management Practices Catalog for the 100 year design storm. See Appendix B for a copy of this curve. PEAK FLOW ANALYSIS OUTLINE The proposed storm drainage piping system is sized to provide the necessary capacity to convey the 100 -year storm event and to provide for initial settlement of sediments in the runoff. The following steps were taken to design the storm drain lines. 1. Calculate the individual drainage basin areas (A) and estimate the Runoff Coefficient (C) and Time of Concentration (T) values for the developed basins. 2. Determine the maximum flow for each basin using the Rational Equation (Q=CIA), determining the Rainfall Intensity (1) from the Zone A Intensity -Duration -Frequency curves from the estimated T values. 3. Size the storm drain lines, sand and grease traps and inlets to accommodate the peak flows. PEAK FLOW ANALYSIS RESULTS The storm system has been sized to accommodate the 100 -year peak flow rates. Appropriately sized infiltration trenches have been located to provide initial settlement of sediments in the runoff and to accommodated storm water on site. DESIGN STORM DETENTION ANALYSIS OUTLINE The proposed storm drainage detention system is sized to provide the necessary capacity to store the 100 -year storm event and to provide for initial settlement of sediments in the runoff. The following steps were taken to design the storm drain retention. Calculate the individual drainage basin areas (A) and estimate the Runoff Coefficient (C) and Time of Concentration (T) values for the developed basins. 2. Determine the maximum flow for each basin using the Rational Equation (Q=CIA), determining the Rainfall Intensity (1) from the Zone A Intensity -Duration -Frequency curves from the estimated T values. 3. Size the swale area and seepage bed size to accommodate the required volume. 100 YEAR DETENTION RESULTS The proposed detention basin system and underground seepage bed has been designed to adequately detain the 100 -year design storm event. Appendix A Drainage Basin Map: N.T.S. DRAINAGE AREA #3 TOTAL SO: 41,014.26 sq.ft. TOTAL AC: 0.94 Impervious: 13,625.69 sq.ft. Ac: 0.31 Pervious: 27,388.57 sq.ft. Ac: 0.63 6� T DRAINAGE BASIN MAP N 5GALE. V'= W -O" .� ■ ■■■ DRAINAGE AREA #2 TOTAL SQ: 7,846.88 sq.ft. - TOTAL AC: 0.18 Impervious: 3,627.13 sq.ft. Ac: 0.084 Pervious: 4,219.75 sq.ft. Ac: 0.096 DRAINAGE AREA #1 TOTAL SO: 29,090.65 sq.ft. TOTAL AC: 0.667 Impervious: 16,051.13 sq.ft. Ac: 0.37 r Pervious: 13,039.52 sq.ft. Ac: 0.30 6� T DRAINAGE BASIN MAP N 5GALE. V'= W -O" .� ■ Appendix B Intensity -Duration -Frequency Curve i M I N U T E- S H'0'U R 0 U R A T 1'0 N Appendix C Runoff Coefficients Table C-1, Typical "C" Values Description of Area Runoff Coefficients Business Downtown Areas 0.70 .- M5 Neighborhood Areas 0.50 - 0.70 Residential Single-family areas 0.30-0,50 Multi -units, detached 0.40 - 0.60 Midti-units, attached 0.60-0,75 Residential (suburban) 0.25-0.40 Apartment dwelling areas 0150-0,70 Industrial Light Areas 0.50 - 0.80 Heavy Areas 0,60-0.90 Parks, cemeteries 0.10 •- 0.25 Playgrounds 0.20-0.35 Railroad yard areas 0.20-0.40 Unimproved areas 0.10-0,30 Streets Asphalt 0.70-0.95 Concrete 0.80-0195 Brick 0.70-0185 Drives and Walks 0.75-0.85 Roofs 0.75 - 0.95 Lawns - course textured soil (greater than 85% sand) Slope: Flat, 2% 0.05-0,I0 Average, 2-7% 0.10-0.15 Sleep, 7% 0.15-0.20 Lawns - fine textured soil (greater than 40% clay) Slope: Flat, 2% 0.13-0.17 Average, 2-7% 0,18 -- 0,22 Steep, 7% 0.25-0.35 44 bevelop ng Yom Slormwaler Pollution Prevention Plan A Guido for Construction Sites Appendix D Storm Water Calculations PSI Corporate Office, Meridian, Idaho Infiltration Characteristics (floor only): Infiltration Rate = , lt'2 in per hr Width I15 ft Length = ':100 ft A era = 1500 sf Q erc. - 250.00 of per hr Q Pere. f- 0.0694 cis Infiltration Characteristics 12/3 sidewalts only): Infiltration Rate= 2 i per hr Width 2x - 30 It Length 2x - 200 ft A pere. = 424.84 sf Q Pere. - 70.81 cf per hr Q pare. - 0.0197 cis STQRAQE VOLUME Time Time min. sec. REQUIRED (100 Year Storm): Intensity Q dev. inches/hr (ofs) Vin c V out (cf) V storage (c 5 300 4.41 1.80 541 21 520 10 600 3.21 1.31 787 42 745 15 900 2.5 1.02 922 63 860 20 1200 2.2 0.90 1,082 83 999 30 1800 1.6 0.66 1181 125 1,058 40 2400 1.4 0.57 1,377 167 1,211 60 3000 1.2 0.49 1,476 208 1,267 60 3600 1.1 0.45 1,623 250 1,373 1201 7200 0.6 0.25 1,771 500 1,271 180 10800 0.45 0.18 1,992 750 1,242 240 14400 0.35 0.14 2,066 1,000 1,066 300 18000 0.3 0.12 2,214 1,250 964 360 21600 0.26 0.11 2,302 1,500 802 _ 480 28800 0.22 0.09 2,597 2,000 597 600 36000 0.18 0.07 2,656 2,500 156 720 43200 0.14 0.06 2,479 3 000 -521 1080 64800 0.12 0.05 3,188 4,500 -1,312 1440 86400 0.085 0.03 3,011 6,000 -2,989 Vs Max= 1373of Maximum Storage Required Bed Volume (38% Voids) Bed Volume (x 16%) Bed Deoth Reauired I hour, 2 hours 3 hours 4 hours 5 hours 6 hours 8 hours 10 hours 12 hours 18 hours 24 hours Vs Max = 1,373 cf IMaximurn Storage Required al & 1 1600gal Sand and Grease Trap b Amcor Pre Cast Ab= I V sw = 2,747: sf of 6" deep swats required :_915.5 ;sf Vsw= 1,831sf of 9' deep swats required 686.7, "z sf V sw = 1 373' sf of 12" deep swale required 457.8 sf De th= 0.9155 ft Swale Size= 15 it wide x 900 It long x 0.92 It dee Velocity Throuah Baffle: Type: (1)1000 al & 1 1600gal Sand and Grease Trap b Amcor Pre Cast Ab= I D Q 10 min. 1.31 lots 1100 year Peak Q dev. At 10 min duration Velocity = 0.33 ft per sec. fta e Bed Recover me floor: = 1,373 cf Q Pero= 1 260.00 cf per hr TimeRec= 5.5hours See a e Bed Recovery Time f213 sidewalts : Vs= 1,373 of Q per= = 70.81 cf Per hr TimeRec= 19.4 hours Time Ree = 0.81 Jdays Wei hted Runoff Coefficient'C- Runoff coefficients= 0.95 paved (impervious) 0.2 landscape (pervious) MIm ervious area = 416;051:13 sf 15246.574 sf Pervious area 113,039.521sf 1 2607.904 sf Total Area = I 29;090.65 sf 1 0.61 of 18" deep swats required of 24" deep swale required of 36" deep swats required PSI Corporate Office, Meridian, Idaho Infiltration Characteristics ffloor only); In0ltration Rate = )2 In per hr Width 1 10 it Length r60 ft A erc. - 600 at Q pero, - 100.00 cf per hr Q perc. 1 0.0278 cis Infiltration Characteristics 1213 sidewalls only): Infiltration Rate I -25n per hr Width 2x 20 ft Length 2x - 120 it A pero, - 136.51 1sf Q arc. - 22.75 cf per hr Q perc, I 0.0063 cfs STORAGE Time min, VOLUME Time sec. REQUIRED 1100 Intensity inches/hr Year Storm): Q dev. cfs Vin V out c. V storage e I 0.32 cfs 1100vear Peak Q dev. At 10 min duration 5 300 4.4 0.431 130 8 122 10 600 3.2 0.32 189 17 172 15 900 2.5 025 222 25 197 20 1200 2.2 0,22 260 33 227 30 1800 1.6 0.16 284 50 234 40 2400 1.4 0.14 331 67 264 60 3000 1.2 0.12 355 83 271 60 3600 L1 0.11 390 100 290 120 7200 0.6 0.06 425 200 225 160 10800 0.45 0.04 479 300 179 240 14400 0.35 0.03 496 400 96 300 18000 0.3 0.03 532 500 32 360 21600 0.26 0.03 553 600 -47 480 28800 0.22 0.02 624 800A 600 36000 0.18 0.02 638 1,000 720 43200 0.14 0.01 596 1,2001080 64800 0.92 0.01 766 18001440 86400 0.085 0.01 723 2,400 VSMax= 290 cf Maximum Storage Required vs1 0= Vsb16% Depth = Seepage Vs Max = Vsw= Vsw= Vsw= rlcnlh = Bed Volume (38% Voids) Bed Volume (x 15%) cf -Maximum Storage Required at of 6" deep swale required sf of 9" deep swale required sf of 12" deep swale required YA Velocity Through Baffle. 290 cf 1000 al & 1 1500 al Sand and Grease Trap by Amcor Pre Cast 22.75 cf per hr See appendix D Q 10 min. I 0.32 cfs 1100vear Peak Q dev. At 10 min duration Velocity = 1 0.08 ft E2rsea d Recovery002Time f fl o VQ ==eB cf er hr Time Rec= I 2.9hours 1'hour 2 hours 3 hours 4 hours 5 hours 6 hours 8 hours 10 hours 12 hours 18 hours 24 hours sf of 18" deep Swale required sf of 24" deep swale required sf of 36" deep swale required See a e Bed Recove Time 1213 w lis : V s = 290 cf Q erc = 22.75 cf per hr Tlme Rec = 12.7 hours Time Rec = I 0.53 days lWelghted RunQjE Coefficient 'C" Runoff coefficients= 0.95 paved (impervious) 0.2 landscape (pervious) Im ewious area I::_:3;627:13 sf 3445.7735 sf Pervious area = Y4279'75 sf 843.95 sf Total Area = 1,-:7,846.88 Isf 0.561-U' PSI Corporate Office, Meridian, Idaho Infiltration Characteristics (Boor onivl: Infiltration Rate 1 2 iner hr Wldili = 15 ft Length = 65 ft A ere. = 825 sf Q ere. = 137.50 cf er hr Q ere. = 0,0382 cfs Infiltration Characteristics ( 213 sidewalls only): Infiltration Rate = 2 in per hr Width 2x - 30 ft Len fh 2x 110 ft arc. - 677.20 sf Q pard. 112.87 of per hr Q Rare. - 0.0314 cfs TTUAGrVOLUME Time Time min.) sec. REQUIRED (100 Year Intensity ((inches/hr) Storm): Q dev. cfs Vin V out fell(CO V storage 5 300 4.41 2.141 641 Ill 630 10 600 3.21 1.55 933 23 910 15 900 2.5 1.21 1,093 34 1,059 20 1200 2.2 1.07 1,282 46 1,237 30 1800 1.6 0.78 1,399 69 1,330 40 2400 1.4 0.68 1632 92 1,541 50 3000 1.2 0.56 1,749 115 1,634 60 3600 1.1 0.53 1,924 136 1,786 120 7200 0.6 0.29 2,099 275 1,824 18010800 0.45 0.22 2,361 413 1,948 240 14400 0.35 0.17 2,448 550 1,898 300 18000OU2 0.15 2,623 688 1.,936 360 216000.13 2,728 825 1,903 480 288000.11 3,078 1,100 1,978 600 360000.09 3148 1,37 ,7720 432000.07 2,938 1,6501,281080 648000.06 3,777 2475 1,3021440 864000.04 3,568 3,300 268 Vs Max= 1,978 cf Maximum Storage Required Seepage Bed Volume (38% Voids) Seepage Bed Volume (x 15°/h) _ 1. hour._ 2 hours 3 hours 4 hours 5 hours 6 hours 8 hours 10 hours 12 hours 18 hours 24 hours Vs Max = 1 978 cf Maximum Storage Required Q arc = 112.87 cfper hr Vsw= t3OWsf of6"deep swale required 1;318.6 -sf Vsw = 208; of of 9" deep Swale required 989.0 ' s sf V sw = 1,578; sf of 12" deep swale required $59,3„sf De th = 2.3975 It SwalaSize= 16 ftwide x 55 ft long x 2.40 fidee Velocity Through Baffle: Ty e: 1 1000gal Sand and Grease Trapb Amcor Pre Cast A b- 4 sf See appendix D Q 10 min. 1.55 cfs 100 ear Peak Q dev. At 10 min duration Velocity = D.39 ff er sec. Bee a e Bed Recove TimeBoor: Vs= 1,0781-1F Q Pero = 137.60 jcf per hr Time Rae= 1 14.4 hours e a e. Bed Recovery Time 1213 sidewalls : V s = 1,978 cf Q arc = 112.87 cfper hr Time Ree= 17.5 hours Time Ree = I 0.73 days Wei hted Runoff Coefficient "C" Runoff coefficients= 0.95 paved (impervious) 0.2 landscape (pervious) Im erviousarea .sf Pervlous area 3,625f 8216.571 sf Total Area= 41;014:26 sf I 0.521"C" of 18" deep swale required of 24" deep swale required of 36" deep Swale required MANHOLE FRAME AND COVER PER IDAHO PUBLIC HORK5 5TD5. (TYP) INLET PIPE (SEE FOR ORIENTATIC TOP VIEW f 2'-0" 4'-6" < 2'_Q" �_ MANHOLE FRAME AND — COVER PER IDAHO PUBLIC HORK5 STANDARDS. (TYP) 6RADE ADX5TING INLET WEIR ELEVATION SIDE VIEW 3'-4 1/8" 3'-6 5/8" s'—o" NOTES a M Lo M M� TO 5EEPA6E BED OUTLET TO SEEPAGE BED 1. 1000 GALLON PRECAST CONCRETE BOX USE FABRICATIORS STARDARD SIZE A5 MANUFACTURED BY AMCOR PRECAST. - 2. INV. IN. > HEIR ELEV. 5Y V MIN. UNLE55 OTHEPH15E INDICATED ON PLANS, 3. INV. OUT< HEIR ELEV. BY 3" MIN. UNLE55 07HERHI5E INDICATED ON PLANS, 1000 GALLON SANE 1 AND GREASE TRAP