HomeMy WebLinkAboutCitadel Storage - Storm Drainage CalculationsSTORM DRAINAGE CALCULATIONS
for
CITADEL STORAGE
875 E. Chinden Boulevard
Meridian, ID 83646
January 23, 2013
ROCK SOLID
CIVIL
Jim E. Coslett, P.E.
181 E. 50th Street
Garden City, ID 83714
208-342-3277
j coslett?rocksolidcivil.com
� F• COSH/
CALCULATION METHODOLOGY
PRE -DEVELOPED FLOW AND VOLUME CALCULATIONS - NOT APPLICABLE ON THIS PROJECT
The pre -developed flow for the project site and the upstream area from the site are calculated using
the Rational Method. The time of concentration is based on overland flow to a point of channelization
and then the travel time in the existing channel to the downstream end of the concerned area.
The pre -developed volume is calculated using the SCS Triangular Unit Hydrograph. Pre -developed
volumes and flows are based on the 15, 25 and 100 -year storm events.
POST -DEVELOPED FLOW AND VOLUME CALCULATIONS
Post -developed flow for the basin areas are also calculated using the Rational Method. The
time of concentration is based on a combination of lot to street time, gutter time and applicable
pipe time prior to reaching the detention pond area. The lot time is calculated using
Manning's kinematic solution (Overton and Meadows 1976). This equation is also used for sheet
flow of less than 300 feet. The gutter time is calculated using the travel length along the gutter
and the gutter velocity at the design slope. Pipe time is calculated using the pipe travel length
and an average pipe velocity.
The post -developed volume is calculated using the SCS Triangular Unit Hydrograph. Post -developed
volumes and flows are based on the City of Boise 50 -year design storm event.
DETENTION VOLUME CALCULATIONS - NOT APPLICABLE ON THIS PROJECT
Two methods are used for the detention volume calculation. The more conservative (larger volume)
method is utilized in detention pond sizing.
The first method calculates the required detention volume by subtracting the calculated
pre -developed volume from the post -developed SCS Triangular Unit Hydrograph. Then the
volume is increased by 15 percent to compensate for detention volume losses due to
sediment between maintenance periods.
The second method simply applies 1 inch of water over the right-of-way area in the basin.
This volume is also increased by 15 percent for similar reasons.
WET POND VOLUME CALCULATIONS - NOT APPLICABLE ON THIS PROJECT
The pond volume calculations are based on an average of the 100 year water surface area and
the groundwater area, applied over the design pond depth. The groundwater area is that
area of the pond based on the seasonal high groundwater elevation.
PIPE SIZING AND HYDRAULIC GRADE CALCULATIONS
These calculations employ the Manning Equation combined with flow entering the pipe. The
hydraulic grade is based on predetermined flow and pipe size.
SAND AND GREASE TRAP SIZING CALCULATIONS
The sand and grease traps were sized based on the post -developed flow draining to them. The
throat width is calculated with this flow and a maximum velocity of 0.5 fps through the throat. The
exiting discharge is assumed to equal the entering discharge.
ORIFICE SIZING CALCULATIONS - NOT APPLICABLE ON THIS PROJECT
The Orifice Equation is used to determine orifice diameter. Pre -developed flows and orifice head are
utilized to calculate the required orifice area. The orifice head is the distance from the pond water
surface to the top of the orifice hole.
BIOFILTRATION SWALE DESIGN - NOT APPLICABLE ON THIS PROJECT
S = Longitudinal slope of swale, 0.5% to 4% preferred
Z = Sideslope ratio, 3:1 max
Y = Depth of water flow, (5" to 8" max)
n = Mannings N = 0.14 for grass lined swale
B = Width of bottom of swale, 8' max
A = Area
R = Hydraulic radius
Q = Discharge use 0.34 in/hr for W.Q. storm
V = Velocity of water flow, hold 0.9 fps, 1.5 fps max
HRT = Hydraulic Residence Time, = U(V'60) > 9 minutes
EQUATIONS USED IN CALCULATIONS
RATIONAL METHOD
Q=CiA where: Q = Runoff Rate, cfs
C = Runoff Coefficient
i = Storm Intensity, in./hr.
A = Basin Area(s), acres
OVERLAND TIME OF CONCENTRATION (WRIGHT-McLAUGHLIN, 1969)
tc=1.8(1.1-C)L12 I S"" where: tc = Overland Time of Concentration, min.
C = Runoff Coefficient
L = Overland Flow Length, ft.
S = Overland Slope, %
CHANNEL TIME OF CONCENTRATION
t�=(L/V) / 60 where: t� = Channel Time of Concentration, min.
L = Channel Length, ft.
V = Velocity, fps (from Manning Equations)
MANNING EQUATION
V=1.49R21IS112 / n where: V = Velocity, fps
R = Hydraulic Radius, ft.
S = Channel Slope, ft./ft.
n = Manning Roughness Coefficient
MANNING'S KINEMATIC SOLUTION (OVERTON AND MEADOWS, 1976)
tt=0.007(nL)°'B / TO' 1 where: tt = Travel Time, hr.
n = Manning Roughness Coefficient
L = Flow Length, ft., 300' max.
Pz = 2 -Year, 24 -Hour Rainfall, in.
s = Slope of Hydraulic Grade Line, ft./ft.
ORIFICE EQUATION
Q=CpA2(2gOh)112 where: Co = Discharge Coefficient
Az =Orifice Area, sq. ft.
g = 32.2 ft./sec.2
Ah = Head. ft.
VOLUME FROM THE SCS TRIANGULAR UNIT HYDROGRAPH METHOD
V=2.67Qt60 / 2 where: V = Volume, cu. ft.
Q = Flow, cfs
tc = time of concentration, min.
STORM DURATION TIME FROM THE SCS TRIANGULAR UNIT HYDROGRAPH METHOD
tb = 2.67*tc where: tb = time of Storm Duration, min
OTHER EQUATIONS USED
Q=VA
AREA OF A TRAPEZOID
A=Y(B+ZY)
t, = time of concentration, min.
where: Q = Flow, cfs
V = Velocity, fps
A = Cross Sectional Area, sq. ft.
where: A = Cross Sectional Area, sq. ft.
B = Width of swale bottom
Z = Swale sideslope ratio
Y = Height of trapezoid
Seepage
Bed #1 Calculation
ProjecYLocation
DA 1 + DA 13
Using Zone "A" OF Curve Predevelopment Rate (if any):
Return Period? 50 Void Volume: (V,°id)
Are.intt` 19,146 Pipe Size(diameter-in):
Drainage Area (acres) Area in Acres 044 Pipe Area (ft (A
uno oe Icient c 0.95
Percolation Rate Inches/Hr 8 Infiltration Calculation t ypel
Width ,- _ _ _ 10 Surface
Length (ft)• 39•Area 390 Of Seepage Bed
D FFJi) I____.7,lnclu ingl-ft freeboard
42-/-
0%Area
12
0.79
Side
cfs max
Compute Volume
Storm Duration I
Q
Runoff Vol Percolation Vol
PreDev. Vol
VF, Required Vol
Min Hr in/hr
cfs
ft3 ft3
ft
ft3
10 0.17 2.61
1.09
654 51
0
603
22.5 0.38 1.9
0.79
1,071 114
0
957
30 0.50 1.43
0.60
1,075 152
0
922
1 0.89
0.37
1,338 305
0
1,033
2 0.53
0.22
1,593 610
0
984
3 0.399
0.17 1
1,799 915
0 1
885
4 0.315
0.13
1,894 1,220
0
674
5 0.273
0.11
2,052 1,524
0
527
6 0.245
0.10
2,210 1,829
0
380
8 0.195
0.08
2,345 2,439
0
-94
10 0.165
0.07
2,480 3,049
0
-569
12 0.14
0.06
2,525 3,659
0
-1,133
18 0.092
0.04
2,489 5,488
0
-2,999
24 0.078
0.03
2,814 7 317
0
-4,503
Enter Total Design Vol.
1 033
Size Seepage Bed
Width DepthAG
AP
AN
Does it Check?
ft ft ft
ft3
Width
Yes
10 6 60
0.79
1 24.47
Length
Storage Volume Available (ftr)
1033
15% Sed. 1188
Adjusted for 150% Sediment
Width
10
Depth with 1 foot freeboard
1 7
Adj. Length
39
Time to Drain 3.9
Hours
References:
Relevant Equations
Q=CIA
Q= Flow Rate (cfs)
C= Runoff Coefficien
1= Rain Intensity
A= Drainage Area
VH
AN
AG
Ap
VV°;d
Required Volume
Net x -Sectional Area
Gross Sectional Area WxD
Pipe x -Section
Void Volume
Ao = Width X Depth
AN = [AG-Aa]1VV0IDI+AP
Seepage
Bed #2
Calculation
Project/Location
DA 2
Using Zone "A" OF Curve Predevelopment Rate (if any):
Return Period? 50 Void Volume: (v„°;d)
Area inn 13,093 Pipe Size(diameter-in):
Drainage Area (acres) Area in Acres 0.30 Pipe Area (): (Ap)
uno oe Icent (c 0.95
Percolation Rate Inches/Hr 8 F Infiltration Calculation type
Width (ft1 10 Surface
Length (ftp 26 -Area 260 Of Seepage Bed
Depth (ft)1_ _ _ _ _ 7 . Inc uding 1 -ft free oard
. J.
Compute Volume
400%
12
0.79
Side
cfs max
Storm Duration I
Q
Runoff Vol
Percolation Vol
PreDev. Vol
VR Required Vol
Min Hr in/hr
cfs
ft'
ft'
ft3
ft3
10 0.17 2.61
0.75
447
37
0
410
22.5 0.38 1.9
0.54
732
84
0
648
30 0.50 1.43
0.41
735
112
0
623
1 0.89
0.25
915
224
0
691
2 0.53
0.15
1,090
448
0
642
3 1 0.399
0.11
1,230
672
0
558
4 0.315
0.09 1
1,295
896
0
399
5 0.273
0.08
1,403
1,120
0
283
6 0.245
0.07
1,511
1,344
0
167
8 0.195
0.06
1,604
1,792
0
-188
10 0.165
0.05
1,696
2,240
0
1 -544
12 0.14
0.04
1,727
2,688
0
-961
18 0.092
0.03
1,702
4,032
0
-2,330
24 0.078
0.02
1,924
5 376
0
-3 452
Enter Total Design Vol.
691
Size Seepage Bed
Width Depth AG
Ap
AN
Does it Check?
ft ft ft
ft'
ft3
Width
Yes
10 6 60
0.79
24.47
Len h
Storage Volume Available ft3
691
15% Sed.
795
Adjusted for 150% Sediment
Width
10
Depth (with 1 foot freeboard
7
Adj. Length
25
Time to Drain 3.5
Hours
References:
Relevant Equations
Q=CIA
Q= Flow Rate (cfs)
C= Runoff Coefficien
1= Rain Intensity
A= Drainage Area
VR
AN
AG
Ap
VV°d
Required Volume
Net x -Sectional Area
Gross Sectional Area WxD
Pipe x -Section
Void Volume
AG = Width X Depth
AN = [AG-Ap][VVOIDI+Ap
Seepage
Bed #3
Calculation
Project/Location
DA 3
Using Zone "A" OF Curve Predevelopment Rate (if any):
Return Period? 50 Void Volume: (VI°;d)
— Area in; A° ft'13,301 Pipe Size(diameter-in): rainage Area (acres) Araa0.31Pipe Area ( ): (AP)
Runoff Coefficient c 0.95
Percolation Rate mhe.M, 8 F Infiltration Calculation type
WOW(W)II _ _ 10ySurface Of Seepage Bed
Eength (ft)• _ _ _ _26•Area 260
Depth (ft) I 7 t nc u mg 1- freeboard
1ompute
qO79
Side
cis max
. .
CVolume
Storm Duration 1
Q
Runoff Vol
Percolation Vol
PreDev. Vol
VR Required Vol
Min Hr in/hr
cfs
W
ft3
ft"
ft3
10 0.17 2.61
0.76
454
37
0
417
22.5 0.38 1.9
0.55
744
84
0
660
30 0.50 1.43
0.41
747
112
0
635
1 0.89
0.26
929
224
0
705
2 0.53
0.15
1,107
448
0
659
3 0.399
0.12
1,250
672
0
578
4 1 0.315
0.09
1,316
896
0
420
5 0.273
0.08
1,425
1,120
0
305
6 0.245
0.07
1,535
1,344
0
191
8 0.195
0.06
1,629
1,792
0
-163
10 0.165
0.05
1,723
2,240
0
-517
12 0.14
0.04
1,754
2,688
0
-934
18 0.092
0.03
1,729
4,032
0
-2,303
24 0.078
0.02
1,955
5 376
0
-3 421
Enter Total Design Vol.
1 705
Size Seepage Bed
Width Depth AG
Ap
AN
Does it Check?
ft ft ft.
ff
ft3
Width
Yes
10 6 60
0.79
1 24.47
Length
Storage Volume Available(ft") 705 15% Sed. 1 811
Adjusted for 15% Sediment
Width
10
Depth with 1 foot freeboard)
1 7
Adj. Length
26
Time to Drain 3.6
Hours
References:
Relevant Equations
Q=CIA
Q= Flow Rate (cfs)
C= Runoff Coefficien
1= Rain Intensity
A= Draina a Area
VR
AN
AG
Ap
VV°;d
Required Volume
Net x -Sectional Area
Gross Sectional Area wxD
Pipe x -Section
Void Volume
Ao = Width X Depth
AN = [AG-AP][VVc;p]+AP
Seepage
Bed #4
Calculation
Project/Location
DA 6 + DA 15
Using Zone "A" OF Curve Predevelopment Rate (if any):
Return Period? 50 01 o ume: (vv°,d) 40%
Area inn - 25,745 Pipe Size(diameter-in): 12
Drainage Area (acres) Area in Acres 0.59 Pipe Area ( ): (A,) 0.79
i u ff Coe icient (c 0.95
Percolation Rate Inches/Hr 8 Infiltration Calculation type Side
N%i7F(ft1 10 Surface
Length (ftp_ _ _ 54.Area540 Of Seepage Bed
Depth (ftJ_.___ 7 ,Inclu Ing 1 -ft ree oard
cfs max
Compute Volume
Storm Duration I
Q
Runoff Vol
Percolation Vol
PreDev. Vol
Vn Required Vol
Min Hr in/hr
cfs
ft3
ft,
fts
fts
10 0.17 2.61
1.47
879
66
0
813
22.5 0.38 1.9
1.07
1,440
149
0
1,291
30 0.50 1.43
0.80
1,445
199
0
1,246
1 0.89
0.50
1,799
398
0
1,401
2 0.53
0.30
2,143
796
0
1,346
3 0.399
0.22 1
2,419
1,195
0 1
1,225
4 0.315
0.18
2,547
1,593
0 1
954
5 0.273
0.15
2,759
1,991
0
768
6 0.245
0.14
2,971
2 389
0
582
8 0.195
0.11
3,153
3,186
0
-33
10 0.165
0.09
3,335
3,982
0
-647
12 0.14
0.08
3,396g9"557
779
0
-1,383
18 0.092
0.05
3,347168
0
-3,821
24 0.078
0.04
3,784
0
-5,773
Enter Total Design Vol. 1
1,401
Size Seepage Bed
Width Depth AG
Ap
AN
Does it Check?
ft ft ft,
ft,ft3
Width
Yes
10 6 60
0.79
24.47
Len th
Storage Volume Available ft3 1401 15% Sed. 1611
Adjusted for 15% Sediment
Width
10
Depth with 1 foot freeboard
1 7
Adj. Length
53
Time to Drain 4.0
Hours
References:
Relevant Equations
Q=CIA
Q= Flow Rate (cfs)
C= Runoff Coefficien
1= Rain Intensity
A= Drainage Area
VH
AN
AG
A,
VV°;d
Required Volume
Net x -Sectional Area
Gross Sectional Area w:D
Pipe x -Section
Void Volume
AG = Width X Depth
AN = [AG-AP][VVOIDI+AP
Seepage
Bed #5
Calculation
Projecftocation
DA 7 + DA 4
Using Zone "A" OF Curve Predevelopment Rate (if any):
Return Period? 50 Void Volume: (v °d)
Areain 22,956 Pipe Size(diameter-in):
Drainage Area (acres) Area in Acres 0.53 Pipe Area (ft): (AP)
Runoff Coefficient c 0.95
Percolation Rate Inches/Hr 8 Infiltration Calculation type
Width (n1 . . 10 Surface
Length (ft)• _ _ -84—Area 480 Of Seepage Bed
Depth (ft1 7 ncu Ing 1- ree oard
J.
40%
12
0.79
Side
cfs max
Compute Volume
Storm Duration I
Q
Runoff Vol
Percolation Vol
PreDev. Vol
VR Required Vol
Min Hr in/hr
cfs
ft3
ft3
ft3
ft3
10 0.17 2.61
1.31
784
60
0
724
22.5 0.38 1.9
0.95
1,284
135
0
1,149
30 0.50 1.43
0.72
1,289
180
0
1,108
1 0.89
0.45
1,604
361
0
1,243
2 0.53
0.27
1,910
722
0
1,189
3 1 0.399
0.20
2,157
1,083
0
1 1,075
4 0.315
0.16
2,271
1,444
0
827
5 0.273
0.14
2,460
1,804
0
656
6 0.245
0.12
2,649
2,165
0
484
8 0.195
0.10
2,812
2,887
0
-75
10 0.165
0.08
2,974
3,609
0
-635
12 0.14
0.07
3,028
4,331
0
-1,303
18 0.092
0.05
2,985
6,496
0
-3,511
24 0.078
0.04
3,3 74
8 661
0
-5,287
Enter Total Design Vol.
1 243
Size Seepage Bed
Width Depth Ac
AP
AN
Does it Check?
ft ft
ft
ft3
Width
Yes
10 6 60
0.79
24.47
Len th
Storage Volume Available ft3
1243
15% Sed.
1430
Adjusted for 15% Sediment
Width
10
Depth with 1 foot freeboard
7
Adj. Length
47
Time to Drain 4.0
Hours
References:
Relevant Equations
Q=CIA
Q= Flow Rate (cfs)
C= Runoff Coefficien
1= Rain Intensity
A= Drainage Area
VR
AN
AG
AP
VV°id
Required Volume
Net x -Sectional Area
Gross Sectional Area WxD
Pipe x -Section
Void Volume
AG = Width X Depth
AN = [AG-AP][VVOIDI+AP
Seepage
Bed #6
Calculation
Projelaftocation
DA 8
Using Zone "A" OF Curve Predevelopment Rate (if any):
Return Period? 5 of Volume: (V1e;d)
_-- Aream 12,956 Pipe Size(diameter-in):
Drainage Area (acres) Area m Acres
0.30 Pipe Area (ft): (AP)
Runoff Coefficient c 0.95
Percolation Rate Inches/Hr 8 Infiltration Calculation type
Width (Fi 10 Surface
Eength (ft)• ' _26 Area E260 Of Seepage Bed
Depth (tt) 7 �— nc u mg 1 -ft freeboard
�.
40%
12
0.79
Slde
Jcfs, max
Compute Volume
Storm Duration 1
Q
Runoff Vol
Percolation Vol
PreDev. Vol
VA Required Vol
Min Hr in/hr
cfs
W
ft3
ft3
ft3
10 0.17 2.61
0.74
442
37
0
405
22.5 0.38 1.9
0.54
725
84
0
641
30 0.50 1.43
0.40
727
112
0
615
1 0.89
0.25
905
224
0
681
2 0.53
0.15
1,078
448
0
630
3 0.399
0.11
1,218
672
0
546
4 1 0.315
0.09
1,282
896
0
386
5 0.273
0.08
1,388
1,120
0
268
6 0.245
0.07
1,495
1,344
0
151
8 0.195
0.06
1,587
1,792
0
-205
10 0.165
0.05
1,678
2,240
0
1 -562
12 0.14
0.04
1,709
2,688
-979
18 0.092
0.03
1,684
4,032
-2,348
24 0.078
0.02
1,904
5!376
4Desion
-3,472
Enter Totol.
681
Size Seepage Bed
Width Depth AG
Aa
AN
Does it Check?
ft ft ft,
ft
ft3
Width
Yes
10 6 60
0.79
24.47
Len til
Storage Volume Availableft3
68115%
Sed.
784
Adjusted for 15% Sediment
Width
10
Depth (with i toottreeboard
7
Adj. Length
25
Time to Drain 3.5
Hours
References:
Relevant Equations
Q=CIA
Q= Flow Rate (cfs)
C= Runoff Coefficien
1= Rain Intensity
A= Drainage Area
VA
AN
AG
Ap
Vve;d
Required Volume
Net x -Sectional Area
Gross Sectional Area wxo
Pipe x -Section
Void Volume
AG = Width X Depth
AN = iAG APjiVVO1D)+AP
Seepage
Bed #7 Calculation
Project/Location
DA 9 + DA 16
+ DA 5
Using Zone "A" OF Curve Predevelopment Rate (if any):
Return Period? 50 of o ume: (v °�)
Area in 31,518 Pipe Size(diameter-in):
Drainage Area (acres) Area in Acres 0.72 Pipe Area ( ): (AP)
uno -Coe icient c 0.95
Percolation Rate inches/Hr 8 Infiltration Calculation type
Width (it1� '10 Surface
Length (ft)• � � _ _ _66 -Area 660 Of Seepage Bed
Depth (ft�� 7 nclu ino 1 -ft ree oard
40%
12
0.79
Side
cfs max
Compute Volume
Storm Duration 1
Q
Runoff Vol Percolation Vol
PreDev. Vol
VR Required Vol
Min Hr in/hr
cfs
ft" ft"
ft3
ft"
10 0.17 2.61
1.79
1,076 79
0
998
22.5 0.38 1.9
1.31
1,763 177
0
1,586
30 0.50 1.43
0.98
1,769 236
0
1,533
1 0.89
0.61
2,202 473
0
1,729
2 0.53
0.36
2,623 946
0
1,677
3 1 0.399
0.27
2,962 1,419
0
1,543
4 0.315
0.22
3,118 1,892
0
1,226
5 0.273
0.19
3,378 2,364
0
1,013
6 0.245
0.17
3,638 2,837
0
800
8 0.195
0.13
3,860 3,783
0
77
10 0.165
0.11
4,083 4,729
0
-646
12 0.14
0.10
4,157 5,675
0
-1,517
18 0.092
0.06
4,098 8,512
0
-4,414
24 0.078
0.05
4,632 11,349
0
-6,717
Enter Total Design Vol.
1,729
Size Seepage Bed
Width Depth AG
Ap
AN
Does it Check?
ft ft ft
ft3
Width
Yes
10 6 60
0.79 1
24.47
Length
Storage Volume Available ft3
1729
15% Sed. 1989
Adj. Length
66
Width De th(with 1 foot freeboard)
Adjusted for 15°/ Sediment 10 1 7
Time to Drain 4.2
Hours
References:
Relevant Equations
Q=CIA
Q= Flow Rate (cfs)
C= Runoff Coefficien
1= Rain Intensity
A= Drainage Area
VR
AN
AG
Ap
Uv°d
Required Volume
Net x -Sectional Area
Gross Sectional Area WxD
Pipe x -Section
Void Volume
Ac = Width X Depth
AN= [Ao-Apl[Vvoio]+AP
Seepage
Bed #8
Calculation
Project/Location
DA 10
Using Zone "A" OF Curve Predevelopment Rate (if any):
Return Period? 50 of o ume: (void)
Area in 12,289 Pipe Size(diameter-in):
Drainage Area (acres) Area in Acres 0.28 Pipe Area (f ): (AR)
Runoff Coefficient c 0.95
Percolation Rate Inches/Hr 8 L Infiltration Calculation type
W idth (ft1 " 10 Surface
Length (ft)4 _ _ _ 'r4 -Area, 240 Of Seepage Bed
7 F- nc u 1- e
Depth (ft� ingt re oard
407/6
12
0.79
Side
cfs max
Compute Volume
Storm Duration I
Q
Runoff Vol
Percolation Vol
PreDev. Vol
VR Required Vol
Min Hr in/hr
cfs
ft3
ft3
ft3
ft3
10 0.17 2.61
0.70
420
35
0
384
22.5 0.38 1.9
0.51
687
79
0
608
30 0.50 1.43
0.38
690
106
0
584
1 0.89
0.24
859
212
0
647
2 0.53
0.14
1,023
423
0
600
3 0.399
0.11 1
1,155
635
0 1
520
4 0.315
0.08
1,216
846
0
369
5 0.273
0.07
1,317
1,058
0
259
6 0.245
0.07
1,418
1,269
0
149
8 0.195
0.05
1,505
1,692
0
-187
10 0.165
0.04
1,592
2,116
0
-524
12 0.14
0.04
1,621
2,539
0
-918
18 0.092
0.02
1,598
3,808
0
-2,210
24 0.078
10.02 1 806
5 077
0
3,271
Enter Total Design Vol.
647
Size Seepage Bed
Width Depth AG
AR
AN
Does it Check?
ft ft ft,
ftft3
Width
Yes
10 6 60
0.79 1
24.47
Length
Storage Volume Available ft3
647
15% Sed. 1
744
Adj. Length
24
Width I Depth with 1 foot freeboard
Adjusted for 15% Sediment 10 7
Time to Drain 3.5
Hours
References:
Relevant Equations
Q=CIA
Q= Flow Rate (cfs)
C= Runoff Coefficien
1= Rain Intensity
A= Drainage Area
VR
AN
AG
AR
VVoid
Required Volume
Net x -Sectional Area
Gross Sectional Area WxD
Pipe x -Section
Void Volume
AG = Width X Depth
AN = IAG APIIVVOIDj+AP
Seepage
Bed #9
Calculation
Projecftocation
DA 11
Using Zone "A" OF Curve Predevelopment Rate (if any):
Return Period? 50 Vo—id-Volume: (V1eld)
Area in 8,089 Pipe Size(diameter-in):
Drainage Area (acres) Area in Acres 0.1g Pipe Area (ft): (AP)
Runoff Coefficient (c 0.95
Percolation Rate Inches/Hr 8 Infiltration Calculation type
Width (ft -W , 10 Surface
—•--- " 15•Area 150 Of Seepage Bed
Length (ft)• _ _
Depth (ft1'" 7 Including 1 -ft Fee and
40%
12
0.79
Side
cfs max
Compute Volume
Storm Duration I
Q
Runoff Vol
Percolation Vol
PreDev. Vol
VR Required Vol
Min Hr in/hr
cfs
ft3
ft3
ft3
ft3
10 0.17 2.61
0.46
276
26
0
250
22.5 0.38 1.9
0.34
452
58
0
394
30 0.50 1.43
0.25
454
78
0
376
1 0.89
0.16
565
156
0
410
2 0.53
0.09
673
311
0
362
3 0.399
0.07
760
467
1 0
294
4 1 0.315
0.06
800
622
0
178
5 0.273
0.05
867
778
0
89
6 0.245
0.04
934
933
0
0
8 0.195
0.03
991
1,244
0
-254
10 0.165
0.03
1,048
1,556
0
-508
12 0.14
0.02
1,067
1,867
0
-800
18 0.092
0.02
1,052
2,800
0
-1,748
24 0.078
0.01
1 189
3 733
0
-2,544
Enter Total Design Vol.
410
Size Seepage Bed
Width Depth Ac
Ap
AN
Does it Check?
ft ft ft,
ft,
ft3
Width
Yes
10 6 60
0.79
24.47
Cenath
Storage Volume Available ft3
410F15%
Sed. 1
471
Adjusted for 15% Sediment
Width
10
Depth with t foot freeboard
7
Adj. Length
14
Time to Drain 3.0
Hours
References:
Relevant Equations
Q=CIA
Q= Flow Rate (cfs)
C= Runoff Coefficien
1= Rain Intensity
A= Drainage Area
VR
AN
Ac,
A,
VVoid
Required Volume
Net x -Sectional Area
Gross Sectional Area wxD
Pipe x -Section
Void Volume
AG = Width X Depth
AN = [Ar-AP)IVvoIDj+AP
Seepage
Bed #10 Calculation
Projelaftocation
DA 12
Using Zone "A" OF Curve Predevelopment Rate (if any):
Return Period? 50 Void VoFme: Knid)
Area info--- 10,817 Pipe Size(diameter-in):
rainage Area (acres) Area in Acres
0.25 Pipe Area (ft): (Ap)
Runoffoe icient c 0.95
Percolation Rate inches/Hr 8 Infiltration Calculation type
Width (tt1 _ _ _ _ 10 Surface
21 •Area 210 Of Seepage Bed
Depth (ft� 7 �— nc u ing l41 ree oard
. r.
40%
12
0.79
I Side
cfs max
Compute Volume
Storm Duration I
Q
Runoff Vol
Percolation Vol
PreDev. Vol
VR Required Vol
Min Hr in/hr
cfs
ft3
ft3
ft3
ft3
10 0.17 2.61
0.62
369
32
0
337
22.5 0.38 1.9
0.45
605
72
0
533
30 0.50 1.43
0.34
607
96
0
511
1 0.89
0.21
756
193
0
563
2 0.53
0.13
900
386
0
514
3 0.399
0.09
1,017
579
0
438
4 1 0.315
0.07
1,070
772
0
299
5 0.273
0.06
1,159
964
0
195
6 0.245
0.06
1,248
1,157
0
91
8 0.195
0.05
1,325
1,543
0
-218
10 0.165
0.04
1,401
1,929
0
-528
12 0.14
0.03
1,427
2,315
0
-888
18 0.092
0.02
1,406
3,472
0
-2,066
24 0.078
0.02
1,590
4 629
0
1 -3,040
Enter Total Design Vol.
563
Size Seepage Bed
Width Depth Ac
Ap
Ar,
Does it Check?
ft ft ft,
ft,
ft3
Width
Yes
10 6 60
Storage Volume Available(ft) 1
0.79
563
1 24.47
15% Sed. 1
647
Len th
Adjusted for 15% Sediment
Width
10
Depth with 1 foot freeboard
7
Adj. Length
20
Time to Drain 3.4
Hours
References:
Relevant Equations
Q=CIA
Q= Flow Rate (cfs)
C= Runoff Coefficien
1= Rain Intensity
A= Drainage Area
VR
A,
Ao
Ap
VVom
Required Volume
Net x -Sectional Area
Gross Sectional Area WxD
Pipe x -Section
Void Volume
Ac = Width X Depth
AN= [AG-Ap]1Vv01o1+Ap
A
rwm �4�
11AIJ 01'105 N��tl
(��
TI MO TE %OIA
I®LLKiANIM IB119N �AA33W
1MXtT
AICWNtl ➢LLLLMtlS IVW �wNd
z ixuronvu w stl rmNw P31VLOd
SIC6 ONSY3X 3NI qm IHiMA05M1
3raveo'�'�aa
aroryS�V3�d
3JtlN!!LS 134V1YJ
3� �
����
g M. &
`
4
�
� �
�
T
wmo ,w p
sN9�tl
-www
a
s
NouonH15N0o HOd 03AOHddV ioNM31A3HAoN3JV
Rg
?sRseoao�$<�g�^s 3a
i
egiiggi 99Hg35^a= aG
3a
I
t §Q
_
a
g
�
pq
Em
C
I
�m
�
�
I
dx
O tl tl Y V v P N - 0 W Y N
N - G O
8,,OH 83d S3HONI NI AIISN31NI �IV�INIVd
0
m
0
O
0
M
0
(D
r
0
(D
r
0
r
0
0
M
0
0
I�
0
0
N
0
0
M
0
0
T
0
0
M
0
0
M
0
0
T
0
0
M
0
O
O
O
O
O
m
TFTM
m
m
m
O
N
00
Lt7
r
M
O
T
h
(D
d'
00LO
W
LM
(`7
(+7
N
N
N
N
r
r
r
0
0
0
i
N
r
0
0
0
0
0
0
0
0
0
0
0
L
—
r-
0
0
0
0
0
0
N
N
I-
r
O
M
If1
00
M
Ill
r
00
M
M
Lti
M
M
M
Q)
N
('i
I.
V
M
N
N
N
r
T
T
0
�=
N
r
O
O
O
O
O
O
O
O
O
O
C
lIcco::)),
0
0
0
0
0
OCD
O
O
O4t
m
N
N
CV
DS
O#
V
I,-
N
r
r
T
0
r
0�
0
0
0
0
0
0
0
0
O
c
N
co
T
0
0
0
0
00
O
O
Ill
O
O
(z
O
m
m
O
O
rl
m
M
O
mrl-
(O
m
O
In
M
N
N
r
T
T
T
0
0
0
0
T
0
0
0
0
0
0
0
0
0
0
0
0
O
O
O
O
LO
O
T
CO
(D
t)
f1/7
i
=_
_
_
2
2
2
O
N
OO
V
N
co
d'
T
N
(sainuiW ui) uoileana
0
m