Loading...
HomeMy WebLinkAboutCarl's Jr. Restaurant - Storm Drainage ReportPrepared For: Erstad Architects and City of Meridian Engineers . Surveyors Planners Carl's Jr. Restaurant Meridian and Overland Meridian, Idaho Storm Drainage Report Kelly Kehrer, P.E. Principal Engineer KM Engineering, LLP 9233 West State Street Boise, Idaho 83714 208.639.6939 keliy@kmenglip.com September 23rtl, 2013 Project No: 13-012 Table of Contents Introduction and Summary:.. Project Description: .............. Calculations....... _.................. ................. I ...........................I ............. ......................................... 2 Exhibits................................................................. _..-.._..................._.............................................3 Introduction and Summary: The purpose of this report is to show that the storm drainage facilities are designed to meet City of Meridian standards. All drainage calculations were derived using the standard of one inch of stormwater over the impervious area. This methodology is typically more conservative than the Rational Method, which is the standard method for small catchments. Based on our calculations we verified that for the 100 year storm the seepage beds are adequately sized. Project Description: This project is located at the south east corner of Meridian Road and Overland Road in Meridian, Idaho. The proposed improvements include new structures, utility connections, concrete hardscape, asphalt paving, drainage facilities, and landscaping. All storm water for the proposed site sheet flows across the concrete asphalt where it is collected by drop inlet and then piped to a sand and grease trap and disposed of through underground infiltration facilities. Basins: There are five drainage basins: Basin A: 2,015 ft.z (North Portion of Site) Basin B: 1,350 ft.Z (North Portion of Site) Basin C: 1,260 ft.z (East Portion of Site) Basin D: 2,510 ft:Z (South Portion of Site) Basin E: 2,540 ft.z (South Portion of Site) See attached Drainage Basin Exhibit for additional information. Seepage Beds: Based on our ralrulationc all seepage beds are adequately sized to ensure no ponding occurs or. the surface and ti -at storm Water will infiltrate within the seepage beds in as 24 hour period. Once the size of the seepage bed is calculated the time necessary for infiltration of storm water into the ground is calculated at less than five hours. The soils report prepared by Strata, Inc. measured an infiltration rate of 8"/hr for soils we plan to excavate the beds into, which we used for the drainage calculations. The storm drainage, seepage bed and infiltration calculations are included in the calculations section of this report. Page I 1 Calculations Page 1 2 STORM DRAINAGE CALCULATIONS Project Description: Carl's Jr. Meridian and Overland Date: 4/10/2013 Project No.: 13-012 Swale: SW -A STORM RUNOFF CALCULATIONS FOR BASIN "A" Runoff Event Frequency: 100 year METHOD: 1" STORM OVER IMPERVIOUS AREA Design storm event for the 100 -year storm is for 1" of storm water over the entire tributary area Area 2,0150 ft2 Intensity 1.0 in VOLUME TO BE RETAINED = 167.9 ft3 SWALE #: SW -A Runoff Volume (per other calculations): 167.9 ft3 Sediment Storage: 15.0 % Volume Required (VR): 193.1 ft3 Depth: 1.0 ft High Water Level Area: 132.0 ft' Bottom of Swale Area: 0.0 ft2 Average End Area: 66.0 ft2 Average Depth: 1.0 ft Swale Volume Provided: 66.0 ft3 INtILI KA 1lQN: 900,6 infiltration is 24 hours Volume to be infiltrated: Infiltration Rate Infiltration Area Volume Retained in Filter Sand: First Hour Infiltration Volume Provided (VP): Time to infiltrate: 167,9 ft3 8 in/hr 132,0 ft2 66 ft3 88 ft3 220.0 ft3 OK, VP> VR 1.9 hr OK, < 24 hours STORM DRAINAGE CALCULATIONS Project Description: Carl's Jr. Meridian and Overland Date: 9/10/2013 Project No.: 13-012 Swale: SW -B STORM RUNOFF CALCULATIONS FOR BASIN "B" Runoff Event Frequency: 100 year METHOD: 1" STORM OVER IMPERVIOUS AREA Design storm event for the 100 -year storm is for 1" of storm water over the entire tributary area Area 1,350.0 ft2 Intensity 1.0 in VOLUME TO BE RETAINED = 112.5 ft3 SWALE If: SW -B Runoff Volume (per other calculations): 112.5 ft3 Sediment Storage: 15.0 % Volume Required (VR): 129.4 11:3 Depth: 1.0 ft High Water Level Area: 90,0 ft, Bottom of Swale Area: 0,0 ft2 Average End Area: 45.0 ft2 Average Depth: 1.0 it Swale Volume Provided: 45.0 ft3 INFILTRATION: 90% Infiltration is 24 hours Volume to be infiltrated: 112.5 ft3 Infiltration Rate S in/hr Infiltration Area 90.0 ft, Volume Retained in Filter Sand: 45 ft3 First Hour Infiltration 60 ft3 Volume Provided (VP): 150.0 ft3 Time to infiltrate: 1.9 hr WM OK, VP>VII OK, < 24 hours STORM DRAINAGE CALCULATIONS Project Description: Carl's Jr. Meridian and Overland Date: 9/10/2013 Project No.: 13-012 Swale: SW -C STORM RUNOFF CALCULATIONS FOR BASIN "C` Runoff Event Frequency: 100 year METHOD: 1" STORM OVER IMPERVIOUS AREA Design storm event for the 100yearstorm is for 1" of storm water over the entire tributary area Area 1,260.0 ft' Intensity 1.0 in VOLUME TO BE RETAINED = 105.0 It SWALE p: SW -C Runoff Volume (per other calculations): 105.0 ft, Sediment Storage: 15.0 % Volume Required (VR): 120.8 ft' Depth: 1.0 ft High Water Level Area: 90.0 ft Bottom of Swale Area: 0.0 it Average End Area: 45.0 ft' Average Depth: SA It Swale Volume Provided: 45.0 ft3 INFILTRATION: 90% infiltration is 24 hours Volume to be infiltrated: Infiltration Rate Infiltration Area Volume Retained in Filter Sand: First Hour Infiltration Volume Provided (VP): Time to infiltrate: In 105.0 ft, 8 in/hr 90.0 ft, 45 ft3 60 ft3 150.0 ft? OK, VP > VR 1.8 hr OK, <24 hours STORM DRAINAGE CALCULATIONS Project Description: Carl's Jr. Meridian and Overland Date: 9/10/2013 Project No.: 13-012 Swale: SW -D STORM RUNOFF CALCULATIONS FOR BASIN "D" Runoff Event Frequency: 100 year METHOD: 1" STORM OVER IMPERVIOUS AREA Design storm event for the 100 -year storm is for 1" of storm water over the entire tributary area Area 2,510.0 ftz Intensity 1.0 in VOLUME TO BE RETAINED = 209 2 ft3 bwALt 9: SW -D Runoff Volume (per other calculations): 209.2 ft3 Sediment Storage: 15.0 % Volume Required (VR): 240.5 ft3 Depth: 1.0 ft High Water Level Area: 150.0 ftz Bottom of Swale Area: 0.0 ft, Average End Area: 75 0 ftz Average Depth: 1.0 ft Swale Volume Provided: 75.0 ft3 INFILTRATION: 90% Infiltration is 24 hours Volume to be infiltrated: Infiltration Rate Infiltration Area Volume Retained in Filter Sand: First Hour Infiltration Volume Provided (VP): Time to infiltrate: kM 209.2 ft3 & in/hr 150.0 ft" 75 ft3 100 It, 250.0 ft3 OK, VP > VR 2.1 hr OK, < 24 hours STORM DRAINAGE CALCULATIONS Project Description: Carl's Jr. Meridian and Overland Project No.: 13-012 Date: Swale: 9/10/2013 SW -E STORM RUNOFF CALCULATIONS FOR BASIN "E" 150.0 ft2 Runoff Event Frequency: 100 year METHOD: 1" STORM OVER IMPERVIOUS AREA 75.0 ft' Design storm event for the 100 -year storm is for 1" of storm 1.0 it water over the entire tributary area 75.0 ft3 Area 2,540.0 ft2 Intensity 1.0 in VOLUME TO BE RETAINED = 211.7 ft3 SWALE p: SW -E Runoff Volume (per other calculations): 211.7 ft3 Sediment Storage: 1.5.0 % Volume Required (VR): 243.4 ft3 Depth: 1.0 It High Water Level Area: 150.0 ft2 Bottom of Swale Area: 0.0 112 Average End Area: 75.0 ft' Average Depth: 1.0 it Swale Volume Provided: 75.0 ft3 IFIL I KA F ION: 90% Infiltration is 24 hours Volume to be infiltrated: Infiltration Rate Infiltration Area Volume Retained in Filter Sand: Frst Hour Infiltration Volume Provided (VP): Time to infiltrate: 211.7 ft' 8 in/hr 150.0 ft' 75 ft3 100 ft3 250.0 ft3 OK, VP> VR 2.1 hr OK, <24 hours Exhibits Page 13 o u Q m 0 FF = 2626.59' ------- CL, , C'e BASIN E 0 lam0 20 40 80 120 ENGINEERS. SURVEYORS. PLANNERS Flan Scale 9233 WEV STATE SIBEET BOISE, IDAHO 93714 PHONE(208)639-6939 FAX 1208)639-6930 CARL'S JR. RESTAURANT DATE. 923-2013 OVERLAND AND MERIDIAN DRIVE, MERIDIAN, ID PROJECT: 13-012 SHEET: DRAINAGE BASIN EXHIBIT 1 OF 1