Loading...
HomeMy WebLinkAboutStorm Drainage ReportPrepared For: Tradewinds Subdivision Phase 2 SDN, LLC & Meridian, Idaho City of Meridian Storm Drainage Report SSONAL ENe Q�oFF, 015 7 E,? 11994 sA s Lj qT£ ,OF t�P q- 9TTHFW Prepared By: Matthew Derr, P.E. Design Engineer XM Engineering, LLP 9233 West State Street Boise, ID 83714 208.639.6939 mderr@kmenglip.com September 19th, 2013 Project No: 13-097 Engineers . Surveyors . Planners Table of Contents Introduction.........................................................................................................................................1 ProjectDescription..............................................................................................................................1 TributaryArea.....................................................................................................................................1 Scopeand Methods.............................................................................................................................1 InfiltrationBasin...................................................................................................................................1 InletCapacity.......................................................................................................................................2 Summary........................................................................................... ....................................................2 INTRODUCTION The purpose of this report is to show that the storm drainage facilities are designed to meet Ada County Highway District standards. All drainage calculations were derived using the standard of one inch of storm water over the impervious area. The Modified Rational Method is the standard method for small catchments. Based on our calculations, we verified that for the 100 -year storm the infiltration basin is adequately sized. PROJECT DESCRIPTION This 10.78 -acre project is located on the southeast corner of Victory Road and Locust Grove Road in Meridian, Idaho. It is a residential subdivision consisting of 45 lots: 39 buildable lots and 6 common lots. The proposed improvements to the site include roads, sidewalks, and site utilities. This area was previously studied with the previously submitted and approved Tradewinds Subdivision Storm Drainage Report, by KM Engineering, revised July 12, 2013 (the Phase 1 report) TRIBUTARY AREA We determined the tributary areas for this project based upon the grading of the roadway and lots. Since the roadways are draining to an infiltration swale, the tributary areas include the entire roadway plus half of each lot. The exhibit included with this report illustrates the tributary areas. As noted, this drainage was accounted for in the previous report. SCOPE AND METHODS The Phase 1 report utilized the Modified Rational Method provided in the ACHD calculation sheets to calculate the storm water volumes and flow rates for this project. Flow rates and storm volumes were established for each basin for the 25 -year and 100 - year storms. Calculation of the infiltration basin, inlets and street sections were completed to verify capacity. INFILTRATION BASIN The infiltration basin (POND -1) built with the previous phase will be incorporated with the drainage system designed for Tradewinds Subdivision Phase 2. Based on previous calculations, the infiltration basin is adequately sized to ensure that no ponding occurs on the surface and that storm water will infiltrate within a 24-hour period. The geotechnical report prepared by STRATA, Inc. dated October 12, 2012, encountered ground water at depths of approximately 2.5 to 3 feet below existing ground surface. 1 STRATA, Inc. recommends high seasonal ground water to occur at a depth of 2.5 feet below existing ground surface in non -fill areas. See Tradewinds Subdivision Storm Drainage Report, revised July 12, 2013, for additional information. INLET CAPACITY There are no additional inlet for this phase of construction. The gutter capacity of Fathom Drive was verified to ensure that overtopping of the curb would not occur in the 25 -year storm. Curb capacity was calculated at 5.98 cfs with a maximum 25 -year flow of 4.56 cfs. See Tradewinds Subdivision Storm Drainage Report, date revised July 12, 2013, for additional information. SUMMARY This Phase 1 report has accounted for the additional flow anticipated by the Phase 2 construction and the infiltration facility (POND -1) has been constructed to accept these flow. No changes to the drainage pattern have been proposed for the Phase 2 construction, therefore the calculations provided in the Phase 1 report will adequately convey and detain the proposed storm drainage. ra BASIN MAP 9 y SN011 ❑JIVJ NISV939tlNItlN4 -- SV3NV NISVS 39VNIVaO 430(179 110N tl3dtl I >o LL O OI 'NVIG I d3 A '3AON9 iSf1OOl ONV AUOiDIA NOISIAIO9f15 SONIM30V8i - E w ~ O h� y Y Y NII SII SII G ¢¢11 m Qy� vi6V1 mN L5=O� 60O Qp 6 S _ I N 31W AVOWOJ - V 30 SEM aGN p po am "wi o � �a ima I �orc & w3� w� 3NN3�b ONlltl i � w arrc �I I I g I I =I=MEN m wL° P �=as=aa-- ea_���-----------------_..�_ ---EVNgSI.SISSOT�S `��_�' �EPEPEPZrEP-Fa--EP wEP--EnE� 9 y SN011 ❑JIVJ ltY[['E]d'(Mg� lla n206)NinM'ENZ/646'll;N3ry M3tloAltl"y.A05tl3W 39tlniveo t604i\SueIHx3\ovE\(60-PL\'tl y SN011 ❑JIVJ NISV939tlNItlN4 -- NI 430(179 110N tl3dtl I ltY[['E]d'(Mg� lla n206)NinM'ENZ/646'll;N3ry M3tloAltl"y.A05tl3W 39tlniveo t604i\SueIHx3\ovE\(60-PL\'tl