Loading...
HomeMy WebLinkAboutPlan Review Checklistailey Engineering, Inc. CIVIL ENGINEERINGIPLANNINGICADD TO: Dinae Edwards City of Meridian Public Works 33 E. Broadway Ave, Ste 102 Meridian, ID 83642 DATE: July 10, 2014 PROJECT: Chesterfield Subdivision No. 3 (BEI Project No. C2014-003) Dinae Edwards: We have received your Plan Review Checklist letter of May 9, 2014 and have modified the plans to meet the City of Meridian's requirements as follows. Sheet 5.1: Water & Sewer Plan & Profile 1. Checklist Item 910 has been addressed. 2. Checklist Item 926 has been addressed. 3. Size of Manhole (48") has been noted — Provided in note about slope and length calculation methodology (typ. all sewer sheets). Sheet 5.2: Water & Sewer Plan & Profile 4. Checklist Item 410 has been addressed. 5. Checklist Item #26 has been addressed. 6. Keynote added referring to Water Note 3. 7. Keynote added referring to Water Note 2. Sheet 5.3: Water & Sewer Plan and Profile 8. Redline comments about water separation have been addressed. 9. Checklist Item #8 has been addressed. 10. An easement for the access road is in progress. The surveyor is currently writing up a legal and exhibit. I will deliver the legal and exhibit upon their completicn. Scott Noriyuki, our developer will collect signatures when the easement is ready. Sheet 6.1: Pressure Irrigation & Street Lighting Plan 11. Street lights changed to `Type 2' with maximum 220' spacing. If you have any questions or comments, please give me a call at (208) 938-0013 Sincerely, Kevin Craig Project Engineer cc: Project #C2014-003 4242 N. Brookside Lane ♦ Boise, Idaho 83714 ♦ Tel.: 208-938-0013