HomeMy WebLinkAboutFinaled Sewer Pressure TestI
PROJECT: �rrywe IdAdmilo^1
TV Video
eViewed and accepted
Vacuum Test
Sewer Line ??
®Passed Air Test SPWOf' frrxforLf Ks1- 54-iy
Punchlist Compiled
FINALED SYSTEM
Water Line
Continuity Test
Passed Pressure Test Jfy dre- Sfs><r c
2 Bacteria Samples Taken - per location
Hydrates Activated
Punchlist Complied
FINALED SYSTEM
PI System - private system inspected
Road Base - not necessarily paved, but 3/4 chip down
Street Signs
B Temporary (makeshift)
Permanent (actual ACHD signs)
it MONTH INSPECTION
Date: 5-172- /5
NOTES FROM INSPECTORS: