Loading...
HomeMy WebLinkAboutAgency CommentsENGINEERING plm ning and engineering communities for the future July 30, 2014 Ms. Dinae Edwards City of Meridian Public Works 33 E. Broadway Avenue, Suite 102 Meridian, ID 83642 Re: The Oaks South Subdivision No. 2 Dear Dinae: 1029 N. Rosario Street, Suite 100 Meridian, ID 83642 Phone: (208) 938-0980 Fax: (208) 938-0941 E-mail: es-kathys@qwestoffice.net Please find enclosed the following: 1. Two sets of the revised construction drawings for The Oaks South Subdivision No. 2. 2. Your redline set. 3. The check for QLPE review. Check number 6354 for $500.00. Please send to QLPE as soon as you have reviewed them. The Pressure Irrigation Operation and Maintenance Manual for The Oaks South Subdivision No. 1 and No. 2 was just submitted with The Oaks South Subdivision No. 1. I am enclosing the 11"x 17 pressure irrigation construction drawings to put in the report. The following addresses the "mark need items" of the plan review checklist: 1-3. Were checked okay. 4. Thomas Coleman was added to the title sheet as the contact person. 5-8. Were checked okay. 9. Plans are enclosed. 10. The size of the off-site water line was added. Sorry about that. 11-20. Were checked okay. 21. The water services were moved per your redline. 22-51. Were checked okay. 52. The pressure irrigation will be privately owned. The Homeowner's Association will operate and maintain the system. The secondary source is an existing well. The Operation and Maintenance Manual was submitted with The Oaks South Subdivision No. 1. 53-60. Were checked okay. C:\2013\07\130702 - Oaks South No. 2\Correspondence\Out-going\Edwards-Mer-Cty.doc Ms. Dinae Edwards July 30, 2014 Page 2 61-82. Were marked N.A. 83. A street light plan will be provided as soon as we can get the Idaho Power plan. Until then, the street lights are shown on the street sheets. I spoke with Austin about this and sent him an e-mail from Vic Steelman of Idaho Power who stated that they had not completed their design yet. I believe Austin was going to allow the pre -con without the street light plan. 84. The easements will be provided as soon as they are completed and prior to the pre -con, 85. The inspection fees will be paid as soon as we get the amount. Please send them to me as soon as you can. 86-89. All items will be provided prior to scheduling the pre -con. 90. A US Army Corps of Engineers 404 Permit is not required for this project. 91. The developer has already applied for the NPDES Permit as required. The NOI has been filed. Please call me if you have any questions or require additional information. Sincerely, Engineering Solutions, LLP Kat y Stros Enclosures Cc: Thomas Coleman C:\2013\07\130702 - Oaks South No. 2\Correspondence\Out-going\Edwards-Mer-Cty.doc