Loading...
HomeMy WebLinkAboutChange Order No 2 with DC Engineering for SCADA System UpgradesCITY OF MERIDIAN CHANGE ORDER NO. 2 33 EAST BROADWAY PROJECT NO, 10417.4 MERID€AN, ID 83642 DATE: June2572015 EFFECTIVE DATE: CONTRACT CHANGE ORDER CONTRACTOR: DC Engineering PROJECT: SCADA System Upgrades -Water SCADA Application Development The Contractor 1s hereby directed to make the fol lovAng changes from the Contract Documents and Plans. Description: 1. Add into the system platform application additional wells 11, 17 and 25 2. Add into the system platform application additional wells 12, 16, 18, 23 and 26. 3. Specify new SCADA hardware, 4. Setup temporary SCADA hardware. S. Remove VVIN911 mobile. 6, Add coordination time for the condition based monitoring software installation project. Reason for Change order: Changes were not Included in the original scopo. Additional time required. Attachments; Change order request from DC Engineering dates May 29, 2015. CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price $47,600.00 Original Contract Ttmas: 192 days Not changes form previous Changs Orders Net ehangea farm previous Change Orders Me—to— No,_._,to_, (catendardays) $23,500,00 7 days Contract Price Priorto this Change Order. Contract Times prior to this change order: (ealendardaya) $71,100.00 199 days Net Increase (decrease) of this Change Order. Not Increase (decrease) of this Change Order. (ca)eedardays) $20,900.00 90 days Contract Price With all Approved Change orders: Contrac€ Times with sit Approved Change Orders: (mlandardaYa) $92,000,00 289 days APPROVED: (City Pumhasrng�r) ACCEPTED: (con By: Keith Watts Date: �30�5"®.. (tractor) BY: /Vt. c t i JGJ f e Dater 115 RECOMMENDED: (city Pmjw manager) DATE APPROVED BY COUNCIL f�. t l T ^` By- `' `" `' NO S(DNATURE REQUIRE Dote: 619,51,s oRPteonue�s T6: APPROVED: (c" City of By: �, P IDIA Data: .' / ,onx yClerk, cc .Hot d a �r iris TAE aS�A May 29, 2015 Mr. Clint Worthington City of Meridian Public Works 33 East Broadway Ave Meridian, ID 83642 440 E. Corporate Drive Suite 103 Meridian, Idaho 83642 Phone: 208.288.2181 Fax: 208.288.2182 Subject: SCADA Application Development - Programming Additional Services — Add Well 11, 17, 25, 12, 15, 18, 23, 26 and Condition based monitoring coordination. Mr. Worthington, The following additional services have been requested for the above referenced project. These changes were not included in the original estimate and require additional time to complete. As a result we are asking for an increase to our not to exceed amount of $20,900.00 (Twenty Thousand Nine Hundred Dollars) to complete the programming and startup. Project changes; • Add into the system platform application additional wells 11, 17 and 25. o Includes configure system platform objects for use in the application, populating displays, configuring 1/0, and testing operation from remote site to Wonderware application. • Add into the system platform application additional wells 12, 15, 18, 23 and 26. o Includes configure system platform objects for use in the application, populating displays, and configuring UO. Testing from the remote site to the Wonderware is not included due to the fact that these sites have not been upgraded and connected to the new colmmunication network yet. • Specify New SCADA hardware (monitors, PC's, cabling) • Setup temporary SCADA hardware • Remove WIN911 mobile (due to IT restricting web access this will not be feasible and it is not currently supported on Win91 I Enterprise Edition) • Add coordination thne for the condition based monitoring software installation project. An allowance of 40 hours to be billed T&M for support and coordination as needed. DC Engineering Pee breakout Additional wells currently in-service: $ 8,000.00 Additional future wells: $ 6,000.00 Specify SCADA Hardware: $ 2,500.00 Setup temporary SCADA Hardware: $ 1,200.00 Deduct for WIN911 mobile $ -1,000.00 Condition based monitoring coordination T&M $ 4,200.00 Total: $ 20,900.00 If you have any questions, or require additional information, please do not hesitate to ask. Sincerely, DC FNGINEERTNG, P.C. Law l-tuddlest-Dtt. Lane Huddleston DC Engineering