Loading...
HomeMy WebLinkAboutChange Order No 1 with Cascade Enterprises for the WWTP Safety UpgradesCITY OF MERIDIAN 33 EAST BROADWAY MERIDIAN, ID 83642 CONTRACT CHANGE ORDER CHANGE ORDER NO. 1 PROJECT N0. 10507.B DATE: 5/19/2016 EFFECTIVE DATE: 6/19/2015 CONTRACTOR: CASCADE ENTERPRISES, INC. PROJECT: WWTP SAFETY UPGRADES The Contractor Is horeby directed to make the following changes from the Contract Documents and Plans, Doscription: THE CONTRACTOR PRESENTED A BETTER SOLUTION FOR THE DIGESTER #3 STAIRS AND A NEW LADDER TO ACCESS THE TOP OF THE DIGESTER. Reason for Change Order: THE CONTRACTOR PRESENTED A BETTER SOLUTION FOR THE DIGESTER #3 STAIRS TO MODIFY THE ANGLE THE STAIRS WERE PLACED AND ADJUST THE WIDTH. ALSO THE EXISTING LADDER TO THE ROOF OF THE DIGESTER WAS REPLACED WITH A NEW LADDER THAT TIED INTO THE NEW STAIRS AND PLATFORM. Attachments: CONTRACTOR ESTIMATE CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price $ $ 48,928.00 Original Contract Times: 60 Net changes form previous Change Orders Net changes form previous Change Orders No.`to_, No._lo_ (calendardays) $ 0 Contract Price Prior to this Change Order: Contract Times prior to [his Change Order: (calendardays) $ 48,928.40 60 Net Increase (decrease) of this Change Order: Net Increase (decrease) of this Change Order: (calendardays) $ 11,072.00 60 Contract Price with all Approved Change Orders: Contract Times vdth all Approved Change Orders: (calendardays) $ 60,000.00 120 APPROVED: (CITY PURCHASING AGEN ACCEP�gD. onlfactof)CAS EFJtTERPMSES 113y: Keith Walls / Y Date: G ! 5/ Dale: CSS�cr RECOMMENDEEP: (Pro%ject,ivul ger) ., Gprrick'tlelson '-'' nPrena Dale: 18 May -15 p4° 0 co sr IAI ItKI� ,y City of jJaycee L. Holman -?//s- TRF Asea 03/03/15 Emily Skoro, C/o City of Meridian 33 E. Broadway Ave. Suite 200 Meridian, ID 83642 Project#10029A Re: W WTP Safety Improvement Project Digester No.3 Alternate Pricing Scope of Work: Access Stairs & Cantilevered Platform: Cell: (208) 991.7146 Office: (208) 343.4009 Fax: (208)343.4838 7512 Lemhi St. Suite 3 — Boise, ID 83709 ryan@cascade-enterprises.com PWC -C -003516 -AA -1-3-4 1) Galvanized Stairway w Aluminum Handrail & Cantilevered Landing (Straight) .................$ 18,860.00 a. Includes Saw -cutting Existing Asphalt b. Includes 3ea 8" X 24" X 48" Slab Footings C. Includes Mid -Landing at half -way point of stairs d. Includes Ships Ladder Access to Digester Lid e. Includes Shop Drawings f. Does not Include Engineering Original Scope @ Digester Access: 1) Platform & Access Modifications.................................................................................................$ 9,516.00 Total Change (Add) to Original Contract: 1) New Stair Proposed less Original Scope......................................................................................$ 9,344.00 a. Request additional 20 days for Change in Scope (pending approvals) Final Design Additions: 1) Grating & Treads $ 698.00 2) Channel/HSS $ 473.67 3) Extra lbs to Galvanize $ 339.78 4) Detailing $ 500.00 5) Railing $ 992.00 6) Labor S 520.00 7) Subtotal $3,523.45 8) Subs OH& P @ 15% $ 528.52 9) Cascade OH& p @ 10% $ 405.20 10) Cost Impact $4,457.17 Total Change (Add) to Original Contract 1) Upon Approval of Additional Costs.............................................................................................$ 13,801.17 Sincerely, Ryan Steinwand Account/Project Manager "We Specialize in helping clients meet their business demands".