Loading...
HomeMy WebLinkAboutCentury Farm Subdivision No 1ECEIVE JUN 2 20 BYs IDIAN� Community Development Department Surety Application Type of Surety: 8 Performance ❑ Warranty Improvements Covered under Surety: Construction of City required improvements including: internal sewer, internal water, street lights, landscaping, pathways (if any), fencing (if any), pressurized irrigation, and gravity irrigation (if any) Project Information Project name: Century Farm Subdivision No. 1 Location/street address: Eagle Road between Amity and Lake Hazel Roads Parcel number: S1133233630 Owner/Developer Information Owner/Developer name: Brighton Development Inc. Phone: 378-4000 Owner/Developer address: 12601 W Explorer Drive Ste 200 Zip: 83713 Contact e-mail: amccurry@brightoncorp.com Fax: Applicant Information Applicant: Brighton Development Inc. Phone: 378-4000 Applicant address: 12601 W. Explorer Drive Ste 200 Zi, 83713 Primary contact is: 9 Property Owner ❑ Applicant ❑ Other Contact e-mail: amccurry@brightoncorp.com Fax: Authorization Printed name: Blake R. Alder Signature: 6/23/2015 STAFF USE ONLY: Application# �2U(C+ 1Rt(-o_n)5-0099 Expiration Date: Staff approval: Date: Community Development . 33 E. Broadway Avenue, Ste. 102 Meridian, Idaho 83642 Phone: 208-884-5533 Fax: 208-888-6854 wvw.meddiaacitv.ore (11-24-2014) FOw" ozeO14Ciel®!9 He - BRIGHTON CORPORATION 12601 W. EXPLORER DRIVE SUITE 200 BOISE, ID 83713 ATTN:STEVE HART P.O. BOX <Be MYMPq. IU B Beyewae ] Ph 208.{Y8:0374 202."5-3632 /09.6.JB]2 e... -n. wunsat��eam��,.eem Item # itemDescription QTY UNITS HILL'$. CENTURY FARM SUBDIVISION- PHASE 1- R.2 TOTAL SCOPE .(SEE ATTACHED ITEMIZED SCOPE) SANITARY SEWER SYSTEM 1 LS DOMESTIC WATER SYSTEM 1 LS PRESSURE IRRIGATION SYSTEM 1 LS GRAIVTY IRRIGATION SYSTEM 1 LS STORM DRAIN SYSTEM 1 LS "SUBTOTAL" SCOPE OF WORK: EXCLUDES EROSION CONTROL, NOI, SWPPP, PERMITS, TRAFFIC CONTROL, ASPHALT/CONCRETE REMOVAL AND REPAIR, CONCRETE COLLARS, LANDSCAPE REPAIR, ROCK TRENCH REMOVAL, & IMPORTED TRENCH BACKFILL UNLESS OTHERWISE. NOTED IN ITEMIZED SCOPE. COMPACTION. TESTING INCLUDED. PRICE BASED ON PLANS DATED 3/27/2015 BY THE LAND GROUP, INC. AND SUBJECTTO.CHANGE ON RECEIPT OF APPROVED CONSTRUCTION PLANS. EXCESS MATERIAL FROM PIPE INSTALLATION TO BE LEFT ONSITE IDAHO PUBLIC WORKS PWC -C -10436 -AAA -1 4/9/2015 PROPOSAL R.2 PROJECT ILL'S CENTURY FARM SUBDIVISION- PHASE t- R.2 UNIT PRICE BID AMOUNT $ 296,484.25 $ 296,484.25 $ 253,572.75 $ 253,572.75 $ 187,441,75 $ 187,441.75 $ 75,593.00 $ 75,593.00 $ 237,802.25 $ 237,802.25 $ 1050,894.00 TOTAL $ 1,050,894.00 All material is guaranteed to beasspecified. All work to be completed in a workmanlike manner according to the standard practices. Any alteration or deviation from the specifications involving extra costs, will be executed only upon written orders, and will become an extras chargeover and above the estimate. All agreements contingent upon strikes, accidents or delays: beyond our control, This proposal may be: withdrawn by us if not accepted within 30 days. Authorized Signature: RICYART7 BROWN Acceptance of Proposal The: attached prices, specifications and conditions are satisfactory and are hereby accepted. You are. authorized to do the work specified. Payment will be made for material and services as outlined in attached quote, and due on the 10th of each month. ACCEPTED: Name: Signature: Date: HILL'S CENTURY FARM SUBDIVSION PH. 1- R.2 .Item Description QTY UNITS UNIT PRICE BIDAMOUNT STORM DRAIN: STORM DRAIN PIPE- 24" ADS HP PIPE 67 LF $ 56,50 $ 3,785.50 STORM DRAIN PIPE- 24" C905 96 LF $ 76.75 $ 7,368.00 STORM. DRAIN PIPE- 18" ADS HP 86 LF $ :39.75 $ 3,418.50 STORM DRAIN PIPE- 12" ADS HP 191 LF $. 12.25 $ 2,339.75 STORM DRAIN PIPE, 12" 6900 504 LF $ 28.25 $ 14,238.00 STORM DRAIN MANHOLE(S)-60" 2 EA $ 2,080.00 $ 4,160.00 STORM DRAIN MANHOLE(S)- 48"- INLCUDES 1 EA WITH 4 EA $ 1,828,00 $ 7,312.00 CONCRETE WEIR STORM DRAIN DIVERSION STRUCTURE(S)-48-MANHOLE(S)- 8 EA $ 1,735.00 $ 13,880.00 INCLUDES 8EACH 12" 90 DEGREE- ELBOWS- PRICED PER PHASE 2 SD DESIGN- SUBJECT TO CHANGE IF REQUIRED TO USE 14X4 DIVERSION STRUCTURE AS SHOWN ON PLANS 1500 GALLON SAND &GREASE TRAP(S) 1 EA $ 2,565.00 $ 2,565.00 1000 GALLON SAND & GREASE TRAP(S) 8 EA $ 3,245.00 $ 25,960.00 END SECTION W/ TRASH RACK- 18" 2 EA $ 356.00 $ 712.00 END SECTION W/ TRASH RACK -12" 1 EA $ 240.00 $ 240.00 SEEPAGE BED #1 1 LS $ 15,522.25 $ 15,522.25 SEEPAGE BED #2 1 LS $ 19,975.50 $ 19,975.50 SEEPAGE BED #3 1 LS $ 7,652.50 $ 7;652.50 SEEPAGE BED .#4 1 LS $ 10,640.25 $ 10,640.25 SEEPAGE BED #5 1 LS $ 20,523.25 $. 20,523525 SEEPAGE BED #6 1 LS $ 22,158.75 $ 22,158.75 SEEPAGE BED#7 1 LS $ 20,48400 $ 20,480.00. SEEPAGE BED #8 1 LS $ 18,788.00 $ 18,788.00 SEEPAGE BED#9 1 LS $ 15,713.00 $ 15,713.00 HUB END FLAP GATE: -12" 1 EA $ 370.00 $ 370.00 "SUBTOTAL" $ 237,802.25 TOTAL $ 237,802:25 HILL'S CENTURY FARM SUBDIVISION PH. I -R.2 Item. Description CITY UNITS UNIT PRICE BIDAMOUNT GRAVITY IRRIGATION: GRAVITY IRRIGATION PIPE- 18" PVC PIP 9180 1438 LF $ 37.25 $ 53,565.50 GRAVITY IRRIGATION PIPE -18"C905 67 LF $ 5.1.50 $ 3,450.50 GRAVITY IRRIGATION BOX(S)-4X4 5 EA $ 2,375.00 $ 11,875.00 GRAVITY IRRIGATION MANHOLE(S)- 48" 2 EA $ 2,120.00 $ 4,240.00 END SECTIONS W/ TRASH RACK -18" 2 EA $ 356.00 $ 712.00 CANAL GATE -18" 2 EA $ 875.00 $ 1,750.00 "SUBTOTAL" $ 75,593.00 TOTAL 75,593.00 9 HILL'S CENTURY FARM: SUBDIVISION PH. 1- R.2 Item Description QTY UNITS. UNIT PRICE BID AMOUNT SEWER: SEWER PIPE 12" 1513 LF $ 42.75 $ 64,680.75 SEWER PIPE SO" 54 LF $ 33.75 $ 1,822.50 - SEWER PIPE 8" 2765 LF $ 31.00 $ 85,715.00 SEWER MAN HOLE(S) 60" 5 EA $ 4,495.00 $ 22;475.00 SEWER MANHOLE(S). 48" 17 EA $ 2341.00 $ 39,797.00 SEWER SERVICE(S) 4" 80 EA $ 711.00 $ 56,880.00 SEWER SERVICE(S) 6" 1 EA $ 837.00 $ 837.00 SEWER SERVICE SLEEVES) -6" 320 LF $ 850 $ 2,720.00 SEWER CASING- 16"STEEL, W/ CALPICOS, END SEALS, .& 29 LF $ 220,00 $ 6,380.00 ANNULAR SPACE FILL- PVC SLEEVE AS SHOWN ON PLANS IS NOT PER .CITY OF MERIDIAN SPECIFICATION SW2 CCTV/TESTING 4332 LF $ 3.00 $ 12,996.D0 SEWER CLEAN-OUT ASSEMBLY 3 EA $ 727.00 $ 2,181.00 "SUBTOTAL" $ 296,484.25 DOMESTIC WATER: WATER PIPE I2" -C900 1460 LF $ 26.50 $ 38,690.00 WATER PIPE .8" -MO 3365 LF $ 17.75 $ 59,728.75 FIRE HYDRANT ASSEMBLY(S)-6" 9 EA $ 3,223.00 $ 29,D07.00 WATER BLOW -OFFS) -W13 ASSEMBLY(S) 4 EA $ 2,253.00 $ 9,012.00 WATER SERVICES) -3/4" DOUBLE SERVICE ASSEMBLY- 39 EA $ 1,462.00 $ 57;018.00 INCLUDES SLEEVING -160 LF 2" & 7 EACH DEEP WATER SERVICE ASSEMBLY PER APPROVED VARIANCE DATED 4/7/2015 WATER SERVICE(S)3/4"SINGLE SERVICEASSEMBLY 3 EA $ 1,134.00 $ 3,402.00 TEES, ANGLES,MISCELLANEOUS 1 LS $ 20,186.00 $ 20,186.00 WATER GATE VALVE(S)-12p' 6 EA $ 1,897.00 $ 11,382.00 WATER GATE VALVE(S)-B" 8 EA $ 1,089:DC $ 8,712.00 WATER CASING- 24" STEEL, W/ CALPICOS, END SEALS,& 40 LF $ 222.50 $ 8900.00 DROP ASSEMBLY(S)-12" 1 EA $ 4,185.00 $ 4,185.00 CONNECTTO EXISTING 2 EA $ 1,675,00 $ 3,350.00 "SUBTOTAL" PRESSURE IRRIGATION: PRESSURE IRRIGATION PIPE- 12" CL2DO 465 LF $ 19.75 $ 9,183.75 PRESSURE IRRIGATION PIPE- 10" CL200 695 LF $ 15.75 $ 10,946.25 PRESSURE IRRIGATION PIPE -4" CL200 6275 LF $ 6.00 $ 37,650,D0 PRESSURE IRRIGATION SLEEVE(S)- 16"C900 165 LF $ 35.25 $ 5,816.25 PRESSURE IRRIGATION SLEEVE(S)- e" C900 670. LF $ 12.50 $ 8,375.00 TENMILE CREEK .CROSSING. INCLUDES 40 LF OF 18" PVC. 1 LS $ 8,386.00 $ 81386,00'.. CASING, DROP ASSEMBLY(S) PRESSURE IRRIGATION SERVICE(S) 106 EA $ 272.00 $ 28,832.00 PRESSURE IRRIGATION-. TEES, ANGLES, MISCELLANEOUS 1 LS $ 12,185.00 $ 12,185.00 PRESSURE IRRIGATION GATE VALVES) -12" 1 EA $ 1,648,00 $ 1,648.00 PRESSURE IRRIGATION GATE VALVE(S)-10" 7 EA $ 1,393.00 $ 9,751.00 PRESSURE IRRIGATION GATE VALVE(S)-4" 16 EA $ 508.00 $ 8,128.00 PUMP STATION VERTICAL.. CONNECTION ASSEMBLY 1 EA $ 1,703.00 $ 1,703.00 NET WELL- 96" MANHOLE W/ 147X19'CONCRETE PAD -PUMP 1 EA $ 18,817.00 $ 18,817.00 >TATION BY OTHERS- INLCUDES 12" DI VERTICAL ASSEMBLY 'OR CONNECTION TO PUMP STATION -10" FLOW METER, 10" .HECK VALVE, PUMP STATION BY OTHERS INTAKE PIPE -18" PVC-INLCUDES CW2000 SCREEN, 18" /ALVE, FITTINGS, FILTER LINES, ANCHOR BLOCK & PRESSURE IRRIGATION DRAIN ASSEMBLY(S) PRESSURE IRRIGATION AIR VENT ASSEMBLYS) 66 LF P.$ 378,75 ! $ 24,997.50 1 EA $ 582.00if $ 582.00 1 EA $ 441.00 $ 441.00 167,441.75 .-f4&M,W cy 0 S&Ctfr& Gia., *%roc. " VO 701" 6ad � 502 E. 45`h St. Boise, Idaho 83714 Tel. (208) 344-2508 Fax (208) 345-9844 www.aflowayelectric.com To: Brighton Corp. Date: Jan. 23, 2015 12601 W. Explorer Dr. Suite 200 Boise, Idaho 83713 Tel. 378-4000 Fax 377-8962 Attn: Daniel Frisby email dfrisby@brightoncorp.com Bid for Brighton Corp. to provide street lighting for the Hill's Century Farm #1 Subdivision located in Meridian, Idaho. This quote is per the requirements preliminarily approved by the City of Meridian street light department. Scope of work to include the following: (1) Provide and install (4 ea.) Type I City of Meridian street lights, consisting of 30 ft. anchor base galvanized round poles with 8 ft. cobra arms and 250 watt high pressure sodium fixtures. These poles will be mounted on reinforced concrete bases poured flush with the ground. These poles are for the E. Taconic Dr. frontage and the entry off S. Eagle Rd. (2) Provide and install (15 ea.) Type Il City of Meridian street lights, consisting of 25 ft. anchor base 4" x 4" square steel bronze poles, fitted with 100 watt high pressure sodium shoebox type light fixtures. These poles will be mounted on reinforced concrete bases poured flush with the ground. They will be for the interior of the subdivision. (3) Provide City of Meridian specification dual metered cabinet for the Taconic Dr. poles, consisting of cabinet mounted on concrete base with main bkr., circuit bkrs., def. purp. lighting contactors, bypass switch, and photo control. Includes a 2" pvc conduit between the cabinet and the nearest Idaho Power junction box (approx. 80 ft.) for service entrance conduit. Service entrance conductors to be pulled in by Idaho Power, not a part of this contract. (4) Provide fourteen non -metered ground junction box services. (5) Provide approximately 1608 ft. of trench, conduit, wire, and backfill to tie these street lights to the Idaho Power source. (6) Provide City of Meridian electrical permit. Labor and Materials -$68,700.00 Thank you for considering Alloway! Michael L. Johnson 66 A14A Signature: Please sign and return when accepted. Quotes are valid for 30 days unless otherwise noted. QUOTATION ELITE VINYL, LLC 11811 Purple Sage Rd. Middleton, Id, 83644 (208) 866-4185 Fax: 965-8285 DATE: February 28, 2015 TO: Brighton Corp. Century Farm Subdivision Phase #1 General Notes: • Elite Vinyl, LLC is licensed and insured • It is the responsibility of the customer to identify and assure proper location, such as: property boundaries, specific locations of utilities, etc. for installation. For the purpose of this quote, it is assumed that all underground utilities and sprinkler systems will not interfere with installation. Any damage to sprinkler systems shall be the responsibility of the customer to arrange repairs. Any associated cost due to the damaged sprinkler system or water lines shall not be the responsibility of Elite Vinyl. Should interference occur with underground lines, extra costs associated therewith will be the responsibility of the customer. • Elite Vinyl will not be responsible for settling where trenches or foundations have been excavated and the replacement soil has not been adequately compacted • It is the customer's responsibility to obtain any necessary permits • Gate prices are in addition to the total linear fence line of the entire project. The gate prices on the estimate have already discounted the amount the customer pays for the linear footage where the gates will be located. NOTE 1: A disclaimer is added to this quote regarding the drilling of holes since the. exact soil conditions are unknown at this time. In the event that lava rock, river rock, or other unusual circumstances axe encountered. which cause an unusual amount of labor and equipment time, it shall be the responsibility of the customer to reimburse Elite Vinyl for the additional costs. NOTE 2: Ground should be kept dry in order to prevent damage due to sinking of the equipment into the ground. The schedule for installation shall be agreed to between the two parties upon entering into a Purchase Agreement. Type 6' Cedar Post Length: 8' Rails: 2" X 6" X 8' Centers: 8' Prod uct/Installation Color Footage Price/ft. Brighton 6' Privacy#3 Color 2736 $11.54 Installation 2735 $5.50 Stain Brighton Colors 5472 $1.00 Installation 5472 $0.75 Price $31, 566.05 $15, 048.00 $5,472.00 $4,104.00 Subtotal $56,190.05 Sales Tax $2,222.28 Estimated Quote Thank you for your interest in Elite Vinyl, LLC. If you have any questions, please call Vaughn (208) 866-4185. Acceptance (signature): Dai (After signing, please mail, fax, email, or call Elite Vinyl) LITEc INYL EES DECK & RAD.ING visitus az.w .elitevinyl.net • •' Installation Estimate PO Box 5393, Boise, Idaho 83705 Cali, . Proposal Number: Century Farm Sub Phone: 208-344-1351 DIGLINE: Email: fencequestions@robellfence.com Completion Date: Proposal Submitted to Estimate Date: 04/03/2015 Brighton Homes Email: Home: Daniel Frisby Cell: 208-577-1000 12601 W Explorer Dr, Suite 200 Dfrisbv@brightoncorp.com Fax: Boise, ID 83713 Other: Length 3154 Height 6' and 5' Walk Gates Drive Gate Chain Link: Wire Gauge Term Post Diam Line Post Diam Line Post Soaci Wood Type Port Orford Cedar Style 3 Rail Picture Frame Contour: Level x Rolling Hillside Special Instructions: Posts Cedar 4x6 Wood on inside Wood on outside x Type of gate Wrought Iron: Western 3 Rail Deposit Due Due Upon Completion Total Cost Of Installation 1 $63,223.00 Installation Details Tear Down: Fence Placement will be per the Fence Specifications for the Hill Century Farms Subdividions (attached). House Vinyi: I I Street Customer is responsible for property lines, obtaining permits and identifying sprinkler systems. Any cast incurred from the above will be the responsibility of the customer. THE CUSTOMER IS ALSO RESPONSI BLE TORE MOVE ANY EXTRA DIRT CAUSED BY DIGGING POST HOLES WHEN NECESSARY. The customer further agrees to remit one half of the total cost of the installation before oosts are set and the remain unt upon satisfactrory completion of the work. We accept VISA & MASTERCARD credit cards. We will contact DIGUNEfor assistance in locating underground utilities 342-1585.The prices of this proposal will be effective for 30 Days. Acceptance Of Installation Proposal The above prices, specifications and conditions are satisfactory and are hereby accepted. 1 authorize Robell Fence to do the work as specified. Payments will be made as outlined above. Payments not made within 60 days will be subject to a lien on your property. Signature Date If Accepting this proposal, please sign and return this form to Robell Fence PO Box 5393, Boise, ID 83705 SA 12 c�5 168,4945F tacos` N BLOCK 1 F,. 1 8,8385E BLOCK 8 A/ HILL'S CENTURY FARM SUBDIVISION - PHASE 1 I LOT AREA EXHIBIT 13,668 SF ;: BLOCK 9 1 10 6 53 TSF8,633 2 18,242 SF 10,015 SF 9 8,8145E 8 7 9,fi75 SF 9,0495E 6,53]SF 8,8485E 8,598 SF 8,57]SF 9,4965f BLOCK 1 2 7,9205E 11 3,920 SF E. Rockhampton St. 3 13 7,9205F 8,235 SF 27 28 B 9,6835F 9,191 SF 9,591 SF 4 14 9,I455f 7,200 SF 8,046 SF 26 29 5 9 7,623 SF 8,280 SF 8,6405f 7,2005F 15 8,4995F y 7,920 SF > 5 25 3016 v 7,9 0 SF 10 7,6175F 8,280 SF 8,6405F BLOCK3 7,919 SF 7,7915F u BLOCK2 m BLOCK CK2 q .q 3 w 7,6115E c 24 31 '� 7,920SF 17 81280 SF 8,6405E vi F 7,919 SF Q F,791 3 c 7,6055E ],920 SF 18 7,5905F 7,9205F g 7,918 SF 1791 5F 6 � 2 22 33 E. Lachlan St. 19 7,7915E 9.5645E 7,569 SF 7,9205E I 10 7,918 SF 1,791 SF JI 14 21 34 9 20 7,7915E 7,1805F 7,9205F 7,920SF ],200 SF 1 9,937 SF 20 35 8 21 15 8,3575E 8,8505F 7,920 SF 7,9205F 8,1235E I 36 7 22 16 7,9835F 7,823 SF 30,187 SF 9.3345F 37 6 17 8,590 SF 8,1555F 23 9,0475F 19 12,5515F 61,9335F BLOCK4J 'O day, 18 BLOCK 2 24 9,4075F 5 10,2425F 70 13,0085E 9� ySt 25 8,945 SF 4 26 F: 3 2 7,6325E 30,]]95F 9,4925F 8,043 SF F 7,886 SF 27 $� 8,9665F i Q 32,1485E 29 10, 955F 13,833 5F 12 c�5 168,4945F tacos` N BLOCK 1 F,. 1 8,8385E BLOCK 8 A/ HILL'S CENTURY FARM SUBDIVISION - PHASE 1 I LOT AREA EXHIBIT 13,668 SF ;: BLOCK 9 OOD • VIhIYL Robell Fence �NAIN LINK . WFIOUGNI IRON Paramount Style Fence Specifications Posts • Post material—Cedar • Post Size —4x6,8'tall • Posts Cemented — 2' into the ground using wet cement. • Post Spacing -8' between posts. Rails • Rail Material - 3 Douglas Fir • Rail Size - 2x6, 8' in length. • Each section will have a top, middle and bottom rail. • Rails are attached by toenailing the rails to the post using three ring shanked screws or nails. Pickets • Picket Materials - Port Orford cedar pickets. • Picket six is 6' in length, 5 W width, and'W thick. • Pickets attached using eight ring shanked screws or nails. Three for the top rail, two for the middle rail, and three for the bottom rail. • Pickets are attached in a board on board style, with spacing of 4" between pickets on the back and top layer of pickets. Trim • Trim Material - Cedar trim. • 2 Pieces of trim will be used. One piece of trim placed on the top, and one piece on the bottom of the fence. • Trim size -1x6 and 8' in length. • Trim attached using ring shanked screws or nails. Stain • Cedar fence will be stained using the Tahoe Brown stain color per Brighton Homes specification. • Both side of the fence will be stained. rAv00D • VItVYL RobeII Fence CHAIN LINK . WROUGHr IRON Western 3 Rail S' Fence Specifications Posts • Post material —16 gauge Steel • Post Size — 2x2, 7' height • Posts Cemented —2' into the ground using wet cement. • Post Spacing -8' between posts. Panels • 3 Rails - 16 gauge steel • Rail Size —1x1, • Picket size — 5/8", 18 gauge steel • Picket spacing -3%:" • Panels are attached to posts using 4 mounting brackets and screws. Powder Coating • All wrought iron is powder coated black Proposal Submitted To: LANDSCAPE CONTRACTORS INC. BRIGHTON Corp. Hill's Century Farm #1 Meridian, Idaho February 3, 2015 Landscape & Irrigation: ( No streetscapes by lots) Plans Dated — 12/17/14 L1.0 to L1.3, Revisions noted none Excavate out road mix & pit run : by others J Place Topsoil from Onsite stockpile : by others Rough Gradin w skid : none Fine Gradin handgrade) 190,000sf. $7,440.00 Sod 173,500: $66,800.00 Mulch & 185 Tree Rings: $7,100.00 Trees. No Pl. Notes: • No rootbarrier WARRANTY Eagle Landscape provides a one-year warranty on all workmanship. One year or one replacement warranty on all plant material. Perennials are warranted for 90 days and annuals have no warranty. There is nowarranty for transplanted material. There is no. warranty against loss due to lack of improper maintenance. There is no plant warranty for plantings not watered with an automatic irrigation system. Examples of lack of proper maintenance include- over or under - watering plant material, fertilizer or chemical damage, insects or diseases acquired after the first 30 days of project completion, vandalism, unusual weather conditions. Hydro seed carries no warranty. No warranty is. provided on accounts that are not paid in full. TOTAL: $2134b.Q4 Brighton, Date Jason Aird, Eagle Landscape, Date 3931 N. Ballantyne Ln., Eagle, ID 83616 - (208) 939-8723 - veww.eaglelandscape.com Page 1 Phone u 208-890-6584 Fax 208-229-3014 HASTRITER CONSTRUCTION Public Works Licence #15478-C-4(4,9,16,28,44) Proposal Date 1/22/2015 Customer Contact Customer Phone Customer Fax Customer Mobile Steve Hart 3784000 377-8962 Steve(208)871-3812 Name / Address Project Name Brighton Corporation CENTURY FARM NO. 1 12601 W. Explorer Dr., Suite 200 Engineer Date of Plans Boise, Idaho 83713 KM 12/17/2014 No. Description Qty Cost Per Unit Total 1 Vertical Curb & Gutter 1,814 8.95 LF 16,235.30 2 6" x 18" Vertical Curb - no gutter 318 8.95 LF 2,846.10 3 Rolled Curb & Gutter 6,996 7.95 LF 55,618.20 4 Sidewalk Adjacent to Curb - 5' 685 11.95 LF 8,185.75 5 Detached Sidewalk Parallel to Curb - 5' 9,323 11.95 LF 111,409.85 6 Detached Sidewalk Parallel to Curb - 8' 351 19.12 LF 6,711.12) 7 Valley Gutter -4' 380 24.00 LF 9,120.00 8 Regular Fillet 16 300.00 EA 4,800.00 9 Driveway Approach (6" thick) 185 3.50 SF 647.50 10 Pedestrian Ramp and Truncated Dome 32 500.00 EA 16,000.00 11 Catch Basin 18 800.00 EA 14,400.00 12 Manhole Adjust 10 100.00 EA 1,000.00 13 Monitoring Well Adjust (device by others) 21 100.00 EA 2,100.00 14 Sleeve Installation 125 25.00 EA 3,125.00 Subtotal of Above Items 252,198.82 NOTE DIscount of Above ** 1. All p rmits, bonding, piping, staking, grading plus 2" by others. 2. All In ap and removal by others. To be prepped to use curb machine. 3. Curb measured through fillets. Sidewalk measured through ped ramps. 4. Cold Neather protection extra, if needed. 5. This s an estimate. To reach the cost of this work you multiply the units of work completed by he unit price. 6. In IN event of litigation the prevailing party shall be entitled to reasonable attorney's fees. 7. All h ms as per ACHD standards, unless otherwise stated. 8. Themount due shall bear interest at the highest rate allowed by law from date of billing. Please sign and return to our office. Retain a copy for your use.'* Payment to be made as follows: Upon billing. No retainage. No penalties. All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices. Any alteration or deviation from above Total $234,544.89 specifications involving extra costs will be executed only upon written orders, and will become an extra charge over and above the estimate. All agreements contingent upon Signature strikes, accidents or delays beyond our control. Owner to carry fire, tornado and other necessary insurance. Our workers are fully covered by Worker's Compensation This proposal may be withdrawn by us if not Insurance. accepted within THIRTY days. ACCEPTANCE OF PROPOSAL - The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. Date of Acceptance Signature Signature 12961 North Ninth Avenue Boise Idaho 83714 dhastriter@cableone.net Sonya Watters From: Sonya Watters Sent: Wednesday, July 01, 2015 8:35 AM To: Bruce Freckleton Cc: Amanda McCurry <AMcCurry@brightoncorp.com> (AMcCurry@brightoncorp.com) Subject: Hill's Century Farm Sub. 1 Surety Bruce, I've reviewed the surety application for Planning approval and found there are no bids for the street buffer landscaping, fencing (open vision metal) and pathway/sidewalk along Eagle & Taconic. (The bid is not required to include the trees and parkway strip in front of building lots.) Unless these items have already been installed, bids need to be submitted. Thanks, Sonya