Loading...
HomeMy WebLinkAboutAmended Cooperative Agreement with ITD for I-84 Meridian Road InterchangeAMENDED COOPERATIVE AGREEMENT FOR IMPROVEMENTS AND MAINTENANCE OF THE INTERSTATE 84 MERIDIAN ROAD INTERCHANGE ITD Project No. A010(939) This Amended AGREEMENT ("Agreement") is made and entered into this ! F.0 day of �st12=_______. 2015, by and between the Idaho Transportation Department (hereinafter, "State"), and the City of Meridian, an Idaho municipal corporation, (hereinafter, "City") (collectively, the "Parties"). RECITALS WHEREAS, the City has requested that the State approve the expenditure of transportation funds for improvements associated with the State's Interstate 84 Meridian Interchange (IC), Project No. A010(939), at the junction of Interstate 84 and Meridian Road, in Meridian, Idaho, near Mile Post 44 (hereinafter, "Project"); and WHEREAS, the City is committed to protecting the investment of these funds by performing certain maintenance as agreed upon between the Parties; and +' WHEREAS, authority for this Agreement is established in Section 40-317, Idaho Code, which allows for cooperative agreements between the State and municipalities for the construction of and improvements to bridges and state highways; and NOW THEREFORE, in consideration of the mutual covenants and agreements herein contained, the Parties do mutually undertake, promise, and agree as follows: I. Appropriation of Funds This Agreement contemplates a) that the State will provide sufficient funds to design and construct improvements included in the Project and specifically detailed in Exhibit A, State Improvements, attached hereto and incorporated herein and b) that the City will provide sufficient funds for the costs of the labor, materials and equipment to perform the improvements specifically detailed in Exhibit A, City Improvements, attached hereto and incorporated herein. II. Responsibilities of State 2.1 State agrees it will pay for improvements for the Project, listed as State Commitments on Exhibit A, in accordance with the Project construction plans and specifications. 2.2 State agrees to notify the City of any future highway construction that would impact the improvements covered by this Agreement, and to seek mutually agreeable I-84 MERIDIAN ROAD INTERCHANGE COOPERATIVE AGREEMENT - 1 solutions to any such construction in order to minimize the destruction or removal of the improvements covered by this Agreement. If a solution is not found, both Parties understand and agree that the State shall be allowed to alter the improvements at its expense and that the City's obligations under this Agreement shall cease. In such event, State agrees to provide sixty (60) days written notice to the City prior to any construction or other actions to alter the improvements. 2.3 State agrees to hold contractors/subcontractors responsible for any and all damages to the improvements resulting from contracted work on the Project. 2.4 State shall maintain the Meridian IC bridge structure, including the irrigation pipe sleeves provided for installation of the pressurized irrigation system through the structure. 2.5 State will include the engineering and installation of railing art as part of the Project as detailed in Exhibit A and coordinate with the City for approval of the work as described in change order 27 to the Project for this work. 2.6 State will include the installation of landscaping as part of the Project as described in Exhibits A and B and detailed in change order 31 to the Project for this work. 2.7 Upon receipt of funds from the City paid to the State, as detailed and summarized in Exhibit A, the State agrees that is will construct the Railing Art and Landscaping described in paragraphs 2.5 and 2.6 above. 2.8 State shall maintain complete accounts of all project funds received and dispersed which will be used to determine the actual contract costs of the City's Railing Art and Landscaping constructed with the Project. 2.9 Upon acceptance of the Railing Art and Landscaping by the City and prior to project closeout, the State will meet with the City to reconcile the actual contract cost of the Railing Art and Landscaping as compared to the estimated costs detailed in City Commitments of Exhibit A. In the event that the amount paid by the City under paragraph 3.4 exceeds the actual contract cost of the complete installation, the State shall refund such amount to the City prior to project closeout. 2.10 State will coordinate with the City on future installations of MSE wall panel art as long as the art meets the specifications provided by the State and attached hereto as Exhibit C, including issuance of a permit and coordination of traffic control as necessary. State will allow installation of rods/bolts for abutment art that meets the specifications in Exhibit C. III. Responsibilities of City I-84 MERIDIAN ROAD INTERCHANGE COOPERATIVE AGREEMENT - 2 3.1 The City will have an opportunity to review and provide comment on the Project construction plans and specifications, prior to approval of the Project plans by the State. 3.2 Before the Project is advertised for construction, the City shall certify in writing to the State that the right-of-way easements needed for the sidewalk extension east of Meridian Road north to the Waltman/Commercial and Meridian Road intersection and the new water line easement from Progress Avenue to the 1-84 westbound off -ramp have been acquired. 3.3 Upon the State and City's acceptance of the Project, City will assume responsibility for maintenance and care of the improvements in all irrigated areas shown on Exhibit B including: a. Remove trash, snow/ice and other roadside debris from sidewalk areas adjacent to Meridian Road in Project area b. Trim, prune, water and otherwise maintain the landscaping features and plantings in an attractive and healthy condition C. Operate and maintain the pressurized irrigation system, including main and distribution pipes, valves, sprinklers, and control system, after the Contractor warranty periods are complete d. Maintain sprinklers so that they do not wet the roadways 3.4 Within 30 days of the execution of this Agreement, the City to pay to the State the sum of four hundred and sixty nine thousand, six hundred and forty three dollars and seventy five cents ($469,643.75), which is the estimated cost of the labor, materials and equipment to perform the Railing Art and Landscaping as itemized in Exhibit A. In addition, within 60 days of the City's acceptance of the work, and completion of the cost reconciliation, pay to the State the amount that the actual contract cost of the labor, materials and equipment that exceeds the estimated costs itemized in Exhibit A. 3.5 City shall assume responsibility for maintenance and care of the railing art and maintain the art features in an attractive condition. 3.6 As part of future action(s), City may elect to pursue and assume responsibility for maintenance and care of additional enhancements described in Exhibit C, MSE wall panel art. 3.7 If the City installs improvements in Exhibit C, City shall maintain the art features in an attractive condition. j 3.8 City shall perpetually maintain the areas within the Project site as shown on Exhibit B, subject to annual appropriation of such maintenance cost by the City and in conformity with the provisions of Article VIII, Section 3 of the Idaho Constitution. I-84 MERIDIAN ROAD INTERCHANGE COOPERATIVE AGREEMENT - 3 3.9 Should the City desire additional enhancements after completion of the Project, City will comply with the State's standard permitting and approval process for work within the 1-84 and Meridian Interchange right-of-way. 3.10 City shall utilize State -approved highway safety procedures for City personnel during all times maintenance is underway within the State retained right-of-way. I-84 MERIDIAN ROAD INTERCHANGE COOPERATIVE AGREEMENT - 4 IV. Indemnity Should any part of the improvements within the State retained right-of-way and maintained by the City be damaged or destroyed though the wrongful or negligent act of any third party, the State will make every effort to determine the identity and whereabouts of the responsible party and the State will attempt collection of the costs of the repair or replacement. If the State is able to collect the cost of repair or replacement, it will advance the funds to the City, based on City estimates or repair invoices. City does hereby indemnify, save and hold harmless the State from and against any and all liability, damages or costs, known or unknown, relating to or as a result of City's maintenance of the Project site and not as the result of the negligence of the State. State does hereby indemnify, save and hold harmless the City from and against any and all liability, damages or costs, known or unknown, relating to or as a result of defects in the construction of the Project resulting in additional cost to the City to plant, repair, replace or maintain the improvements which are the subject of this Agreement and not as the result of the negligence of the City. V. Term of Agreement It is anticipated the term of this Agreement shall be perpetual, subject to annual appropriation of such maintenance cost by the City and in conformity with the provisions of Article VIII, Section 3 of the Idaho Constitution. Neither Party may terminate this Agreement without the prior written consent of the other Party, other than as set forth in this Agreement. VI. General Provisions 6.1 Contact Information: The contact for the Idaho Transportation Department shall be the District Three Engineer Manager at (208)334-8300. The contact for the City of Meridian shall be the Director of Parks at (208) 888-3579. 6.2 Termination of Interagency Agreement/Nonappropriation: Nothing in this Agreement shall be construed to be an indebtedness or liability in violation of Article VIII, Section 3 of the Idaho Constitution. 6.3 Attorney Fees: In the event of any controversy, claim, or action being filed or instituted between the Parties to enforce the terms and conditions of this Agreement, or arising from the breach of any provision hereof, the prevailing Party will be entitled to receive from the other Party all costs, damages, and expenses, including reasonable attorneys' fees. The prevailing Party will be that Party who was awarded judgment as a result of trial or arbitration. I-84 MERIDIAN ROAD INTERCHANGE COOPERATIVE AGREEMENT - 5 6.4 Choice of Law: This Agreement shall be governed by, and construed in accordance with, the laws of the State of Idaho. 6.5 Exhibits: All exhibits to this Agreement are incorporated by reference and made a part of this Agreement as if the exhibits were set forth in their entirety in this Agreement. 6.6 Entire Agreement: This Agreement and the exhibits hereto constitute the full and entire understanding and agreement between the Parties with regard to the transaction contemplated herein, and no Party shall be liable or bound to the other in any manner by any representations, warranties, covenants and agreements except as specifically set forth herein. 6.7 Acknowledgments and Modifications: No acknowledgments required hereunder, and no modification or waiver of any provision of this Agreement or consent to departure there from, shall be effective unless in writing and signed by State and City. 6.8 Headings: The headings used in this Agreement are used for convenience only and are not to be considered in construing or interpreting this Agreement. t' 6.9 Counterparts: This Agreement may be executed in two or more counterparts, each of which shall be deemed an original, but both of which together shall constitute one and the same instrument. End of Agreement [Signature page follows.] I-84 MERIDIAN ROAD INTERCHANGE COOPERATIVE AGREEMENT - 6 IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of the date first above written. CITY OF MERIDIAN IDAHO TRANSPORTATION DEPARTMENT Mayor, City • eridian istrict Engineer, District Three Attest: V-,osp, En4tic: j Recommended by: / citv tL 1' ,r / ..0101°' t.�_i_ 1�ate- .TANk. l City C"-rk �— —'� GARVEE Program Manager °'54e TRE Abk,°.4�v Approved As To Form: Deputy Attorney General Idaho Transportation Department I-84 MERIDIAN ROAD INTERCHANGE COOPERATIVE AGREEMENT - 7 EXHIBIT A State Commitments: 1. Design for Area A and Area B as shown on Exhibit B a. Irrigation design b. Planting plan c. Provisions for future well connection to irrigation system 2. Improvements of Area A (Ramp islands only) as shown on Exhibit B a. Pressurized irrigation delivery b. Surface distribution system c. Mow strip and concrete adjacent to Meridian Road for maintenance access/parking 3. Improvements of Area B as shown on Exhibit B a. Pressurized irrigation delivery b. Surface distribution system 4. Extend 7 -foot sidewalk on east side of Meridian Road to Waltman/Commercial/ Meridian intersection 5. Formliners a. MSE wall panels b. Center pier c. Outer parapet d. Inner parapet 6. Color treatment of concrete (stain/dye) a. MSE wall panels b. Center pier c. Outer parapet d. Inner parapet 7. SPUI raised island concrete pattern City Commitments: 1. Estimated Landscape costs for Areas A and B as shown on Exhibit B and outlined in change order 31 to the Project. Item Number Item Description Est. Quantity Unit Unit Price Item Total NC31-SP100 Landscaping Improvements* 1 LS $111,000.00 $111,000.00 NC31-SP200 Topsoil* 1971 Ton $73.00 $143,883.00 NC31-SP300 2" Crushed Basalt Rock* 514 Ton $70.00 $35,980.00 NC31-SP400 Lava Basalt Dec. Boulders* 736 Ton $120.00 $88,320.00 NC31-S904- 05N Modify Irrigation * Irri System* g y 1 LS $740.00 $740.00 626-105A Traffic Control Maintenance 120 HR $55.75 $6,690.00 626-076A Advanced Warning Arrow Panel 480 HR $1.80 $864.00 630-005A Flagging 240 HR $53.00 $12,720.00 NC31-Sign Welcome to Meridian Sign* 1 LS $25,838.50 $25,838.50 NC31-Prime I Prime Contractor Overhead and 1 CA 1 $7,392.08 $7,392.08 I-84 MERIDIAN ROAD INTERCHANGE COOPERATIVE AGREEMENT - 8 Profit Net Estimated Increase $433,427.58 2. Estimated Railing Art costs for engineering and installation as outlined in change order 27 to the Project and detailed below. Railing Art Specifications: • Art piece(s) may have 50% coverage of railing panels. • Art piece(s) must not weigh more than 50 lbs. per linear foot. • Art piece(s) must adhere to railing with no more than a 6" off -set from railing panel. Item Number Item Description lEst.Quantityl Unit I Unit Price I Item Total NC27-Engineering Design Engineering* 1 LS $2,247.20 $2,247.20 NC27-Art Railing Mounted Art* 1 LS $31,768.20 $31,768.20 NC27-Prime Prime Contractor Overhead and Profit 1 LS $2,200.77 $2,200.77 Net Estimated Increase $36,216.17 I-84 MERIDIAN ROAD INTERCHANGE COOPERATIVE AGREEMENT - 9 Legend: Arcas'A s� •: Arens'B' Irrigated Areas I-84 MERIDIAN ROAD INTERCHANGE COOPERATIVE AGREEMENT - 10 �d Legend: Arcas'A s� •: Arens'B' Irrigated Areas I-84 MERIDIAN ROAD INTERCHANGE COOPERATIVE AGREEMENT - 10 EXHIBIT C POTENTIAL FUTURE ENHANCEMENTS BY CITY MSE Wall Panel Art Specifications: 1. Art work should be no larger than 12 feet in height and 25 feet in width. 2. Material should be steel — with a thickness of 1/4" to 3/8" with a maximum weight of any one piece up to 5000 pounds, 3. Artwork connected to the panels require a minimum of 4 supports (3/4" bolts or rods) which should be installed by drilling and epoxying following construction and settlement of the wall panels. The support locations should be specified once art work size is determined and supports installed with the artwork, not with the overall project. I-84 MERIDIAN ROAD INTERCHANGE COOPERATIVE AGREEMENT - 11