HomeMy WebLinkAboutChange Order No 1 with Schmidt Construction for NW 8th St Sewer Trunk Phase 3C17YOF MISRIMAN
33 EAST BROADWAY
MERIDIAN, 10 83042
CONTRACT CHANGE ORDER
00*4000V 10 hdVaIiy dlioated to Mok4 tho.lbliowlno changes fr6rh the Coolvaot b0our"Ghtg; and Plans.
REFER TO ATTACHED CHANGE ORDER DOCUMENTS FROM SCHMIDT CONSTRUCTION
1060.00 fpr Change Order,
0DITIONAL-WORK'NEEDED. TO COMPLETE THE PROJECT (sea attached). ALSO ADDED THE
-OLLOWING QUANTITIESTO THE. PROJEOT.-2,690 SY OF -TYPr=.'P SURFACE RESTORATION; 03 LF
if 8 -INCH dRAVIT"Y �kftk_PIPE; -4,606 TON"6 OF 8 -INCH MINUS' UNORU-SHED AGGREGATE; -1
8 OF DEWATERING;' -1,188 SY'OF MISCELLANEOUS PAVEMENT; -80 LFOF 4 -INCH SEWER
ERVICE EINE,
I
'Original Cojv6k4j.pfjb6
Ofloi6s I contmot TIM60: days
NO C11006810TYn Pravlaft.6fiangs 6rdore
Net changes torn prov-1oulChano-o- Orders
No.— to $0,00
N6._,. to (eojoflldoroaya)
days
Contract Ofte Prior to this Chm"pOrder,
Coriftept Times Prlor to (his Change Order.
$34040340
("lefidir do") days
Nit Inoresse (d"vosss).of th4 Change Order.
Not i lhorosoo.(doorease) of this Chinp r
Orde
411$11*12."
—days
COA086t Price With Oil Apip�oi4d 0006jiOMew,
"iendardays)
days
APPROVED; (qtypol 'Ma l
ACCEPTED'
by:. Keith Waft
by:
Data: s
U41,
REMME _NDE0 ylp*d ma"aiii")
— — —
DATE ED:BY BY WUNCIL
BY!
15 It- AU,
-0
NO'S - ION ' ATURE REQUIRED
/�
IMO)v. do Wma�Elk�ID�;rk, joy44 L. Holffiso
Tq
. n;o <
JDED: (City Engineering Managerk,'_____7r%'_P_ALL
r
W
W
0
z
Q
2
V
M
W
U)
a
IL
z
Y
z
H
W
W
N
H
W
W
H
U)
H
co
z
0
0d
O
O
0
O
cqo
o
o
o
o
Nt
0
�0)
ti
w
L
LO
Cf)p
i
M
649,
It
M
00
64
i
i
6%
I"
W
N
d
OD
d
o
o
0
0
0
0
0
0.
='
N OD
M
O
O
�
O
N
Itc
pLL
0
J
0
o
U
J
>-
(n
w
J
'c
a
o
w
>
O
Y
Z CLY
C
z�
a�
�omw
wa`)
200 -0
- moo
�vwa,
Nc
�o
(D
Z>cs
WQf°
w - C
N coo
U) a
a
W a=
O
d-0
Cl U
a
F -Z
QQQ'c
d=>
Z�
af
o
d C
o•°
(>
�,
2
U) °-�0
J C N Q
w•o
Q
N
CO
w> N 2
-> m E
c
>
U
>
0
W N_
N`t
j Q Q
N
= Q
Q Q a
N c
LU X0
Q
U)
�
J U
W N _aw
a>w m>�
Z"= rn
Q
wa`� m
wa o a) .S
N>
N
V U
C
(V >'+�
U N 0 0
D
} of
'��
ao 0
W
W
�H �.Q
CO
2
F-cW
3
0
co>S c`-
U
U)
D
m
H
Q
T7
r-
r-
r-
Z
o0
o
ao
<.,
Q
OU
E o
r z I
M
N
00
LO
d'
LO
M
LL
W
J
F-
O
F-
s
• •
15883 Robber Place
Caldwell, Idaho 83807
208.459.2461 (Tel)
208.453.4988 (Fax)
208.941.1948 (Cell)
City of Meridian Change Order Request 3/20/2015 Bill Schmidt
NW 8th Street Trunk Sewer Main - Broadway to Cherry - Phase 3 President
Project #15-10330.A Id Public Works Lic #PWC-C-16406-AAA-1 Expires: 6/30/2015
Waterline Replacement
Line Al Qt Unit Description
Unit Cost
Extended Cost
1 20 LF 6" C900
$5.23
$104.60
2 2 EA 6" Long Sleeves
$87.50
$175.00
3 4 EA Accessory Packs
$60.79
$243.16
4 2 HR Pie Laborer / Foreman
$112.50
$225.00
5 0.5 HR 225D Excavator
$200.00
$100.00
6 2 HR Service Truck
$50.00
$100.00
7 1 LS Per ISPWC, Article 12 allowance of 15% for OH & Profit
$142.16
Total
$1089.92
Subrnaftk .' ivaiazofvAiSahM4de6
Dates NarvA,20, 2015
William M Schmidt
Schmidt Construction Co Inc
d
• •
15883 Robber Place
Caldwell, Idaho 83607
208.459.2461 (Tel)
208.453.4968 (Fax)
208.941.1948 (Cell)
City of Meridian Change Order Request 4/1/2015 Bill Schmidt
NW 8th Street Trunk Sewer Main - Broadway to Cherry - Phase 3 President
Project #15-10330.A Id Public Works Lic #PWC-C-16406-AAA-1 Expires: 6/30/2015
Waterline Break on Washington Street
Line #
Qty
Unit Description
Unit Cost
Extended Cost
1
40
LF 6" C900
$5.23
$209.20
2
2
EA 6" Long Sleeves
$87.50
$175.00
3
4
EA Accessory Packs
$60.79
$243.16
4
6
HR Superintendent
$125.00
$750.00
5
6
HR Foreman
$60.00
$360.00
6
6
HR Operator
$45.00
$270.00
7
6
HR Laborer
$45.00
$270.00
8
6
HR Laborer
$45.00
$270.00
9
6
HR Laborer
1HR
$45.00
$270.00
10
3
350G Excavator
$175.00
$525.00
11
1
HR 225CLC Excavator
$125.00
$125.00
12
1
HR 724KLoader
$195.00
$195.00
13
6
HR Service Truck
$50.00
$300.00
14
1
LS Hydro Cleaning and Removal of Haz Waste
$762.50
$762.50
15
1
LS Per ISPWC, Article 12, allowance of 15% for OH & Profit
$708.73
Total
$5,433.59
lry.' lye 'ia vel Schnu car
Dates'
�r:L1, 2015
William M Schmidt
Schmidt Construction Co Inc
s
+�
�_� '
•
am
15883 Robber Place
Caldwell, Idaho 83607
208.459.2461 (Tel)
208.453.4968 (Fax)
208.941.1948 (Cell)
City of Meridian Change Order Request #3 4/6/2015 Bill Schmidt
NW 8th Street Trunk Sewer Main - Broadway to Cherry - Phase 3 President
Project #1 5-10330.A Id Public Works Lic #PWC -C-1 6406 -AAA -1 Expires: 6/30/2015
Explorato
Excavation & Repair at 625 W. Carlton
Line #1
Qty
I Unitj Description
Unit Cost I
Extended Cost
Exploratory Excavation
1
4
HR Su erintendant
$125.00
$500.00
2
4
1HR
HR Foreman
$60.00
$240.00
3
4
HR Laborer Pie Layer)
$45.00
$180.00
4
4
Laborer Pie Layer)
$45.00
$180.00
5
4
HR 305 Cat Mini Excavator
$95.00
$380.00
6
4
HR Service Truck
$50.00
$200.00
TOTAL EXPLORATORY EE
$1,680.00
Concrete Prep & Repair
1
2
HR Foreman
$60.00
$120.00
2
2
HR Laborer General
$30.00
$60.00
3
2
HR Laborer General
$30.00
$60.00
4
1
HR Cat 225D Excavator
$150.00
$150.00
5
1
HR Cat 279C Skidsteer
$250.00
$250.00
6
1
HR Service Truck
$50.00
$50.00
7
1
EA Traffic Rated Cleanout Materials Only)
$142.00
$142.00
8
60
SF Concrete - Sidewalk 12' x 5'
$15.75
$945.00
9
156
SF Concrete - Driveway (12'x 13'
$15.75
$2,457.00
TOTAL CONCRETE & REPAIR
$4,234.00
TOTAL EE & REPAIR
$5,914.00
1
LS Per ISPWC, Article 12, allowance of 15% for OH & Profit
$887.10
Total
$6,801.10
Sal mared�
by, .• I.tha,zs Al Schm4& Date,, 6, 201 S
William M Schmidt
Schmidt Construction Co Inc
1 + ^ I
J
• • I
15883 Robber Place
Caldwell, Idaho 83607
208.459.2461 (Tel)
208.453.4968 (Fax)
208.941.1948 (Cell)
City of Meridian Change Order Request #4 4/6/2015
NW 8th Street Trunk Sewer Main - Broadway to Cherry - Phase 3
Project #15-10330.A id Public Works Lic #PWC -C -16406 -AAA -1 Expires:
Bill Schmidt
President
6/30/2015
Ex
lorato Excavation & Repair at 613 W. Carlton
Line #1 Qty I Unitj Description
Unit Cost I
Extended Cost
Exploratory Excavation
1
5 HR Foreman
$60.00
$300.00
2
5 HR Laborer Pie Layer)
$45.00
$225.00
3
5 HR 305 Cat Mini Excavator
$95.00
$475.00
4
5 HR Service Truck
$50.00
$250.00
TOTAL EXPLORATORY EE
$1,250.00
Concrete Prep & Repair
1
2 HR Foreman
$60.00
$120.00
2
2 HR Laborer General
$30.00
$60.00
3
2 HR Laborer General
$30.00
$60.00
3
1 HR John Deere 225D Excavator
$175.00
$175.00
4
1 HR Cat 279C Skidsteer
$250.00
$250.00
5
1 HR Service Truck
$50.00
$50.00
6
1 EA Traffic Rated Cleanout Materials Only)
$142.00
$142.00
7
60 SF Concrete -Sidewalk (12'x 5'
$15.75
$945.00
TOTAL CONCRETE & REPAIR
$1,802.00
TOTAL EE & REPAIR
$3,052.00
1 LS Per ISPWC, Article 12, allowance of 15% for OH & Profit
$457.80
Total
$3,509.80
sulrmarea
lry • waz; M schmat Dates• fi ra 6, 2015
William M Schmidt
Schmidt Construction Co Inc
s
1
• •
15883 Robber Place
Caldwell, Idaho 83607
208.459.2461 (Tel)
208.453.4968 (Fax)
208.941.1948 (Cell)
City of Meridian Change Order Request #5 4/6/2015 Bill Schmidt
NW 8th Street Trunk Sewer Main - Broadway to Cherry - Phase 3 President
Project #15-10330.A Id Public Works Lic #PWC-C-16406-AAA-1 Expires: 6/30/2015
Exploratory Excavation at 561 W. Carlton
Line #1 Qty I Unit Description
Unit Cost I
Extended Cost
Exploratory Excavation
1 4 HR Foreman
$60.00
$240.00
2 4 HR Laborer Pie Layer)
$45.00
$180.00
3 5 HR Laborer (Pipe Layer)
$45.00
$225.00
4 4 HR 305 Cat Mini Excavator
$95.00
$380.00
5 4 HR Service Truck
$50.00
$200.00
TOTAL EXPLORATORY
$1,225.00
1 LS Per ISPWC, Article 12, allowance of 15% for OH & Profit
$183.75
Total j
$1,408.75
S"bm, tte.-.i�rry" Gt a&a4,;vMSchmtidt
Data) >4 `r.L6, 2015
William M Schmidt
Schmidt Construction Co Inc
s
= I
Lidian
15883 Robber Place
Caldwell, Idaho 83607
208.459.2461 (Tel)
208.453.4968 (Fax)
208.941.1948 (Cell)
Change Order Request #6 4/6/2015 Bill Schmidt
NW 8th Street Trunk Sewer Main - Broadway to Cherry - Phase 3 President
Project #15-10330.A Id Public Works Lic #PWC -C -16406 -AAA -1 Expires: 6/30/2015
Explorato
Excavation at 650 W. Washington St.
Line #
Qty
jUnitjDescription
I Unit Cost I
Extended Cost
Exploratory
Excavation 4/2/2015
1
4
HR Foreman
$60.00
$240.00
2
4
HR Laborer Pie Layer)
$45.00
$180.00
3
4
HR 305 Cat Mini Excavator
$95.00
$380.00
4
4
HR Service Truck
$50.00
$200.00
TOTAL EXPLORATORY
$1,000.00
Exploratory
Excavation 4/3/2015
1
1.5
HR Superintendent
$125.00
$187.50
2
1.5
HR Foreman
$60.00
$90.00
3
1.5
HR Foreman
$60.00
$90.00
4
1.5
HR Laborer (Pipe Layer)
$45.00
$67.50
5
1.5
HR Laborer Pie Layer)
$45.00
$67.50
6
1.5
HR 305 Cat Mini Excavator
$95.00
$142.50
7
1.5
HR Service Truck
$50.00
$75.00
TOTAL EXPLORATORY
$720.00
Exploratory
Excavation 4/6/2015
1
1
HR Foreman
$125.00
$125.00
2
0.5
HR 305 Cat Mini Excavator
$95.00
$47.50
3
1.5
HR Service Truck
$50.00
$75.00
TOTAL EXPLORATORY
$247.50
GRAND TOTAL EXPLORATORY
$1,967.50
1
LS Per ISPWC, Article 12,
allowance of 15% for OH & Profit
$295.13
Total
$2,262.63
S"bm
ttew' Iry - wr; &r* m schmat
Data• -6,2015
William M Schmidt
Schmidt Construction Co Inc
1Caldwell,
• I
666.61ffl-
15883 Robber Place
Idaho 83607
208.459.2461 (Tel)
208.453.4968 (Fax)
208.941.1948 (Cell)
City of Meridian Change Order Request #7 4/6/2015
NW 8th Street Trunk Sewer Main - Broadway to Cherry - Phase 3
Project #15-10330.A Id Public Works Lic #PWC -C -16406 -AAA -1 Expires:
Bill Schmidt
President
6/30/2015
Ex lorato Excavation at 651 W. Washington St.
Line #1 Qty I Unitj Description Unit Cost I
Extended Cost
Exploratory Excavation
1 2 HR Foreman $60.00
$120.00
2 2 HR Laborer Pie Layer) $45.00
$90.00
3 2 HR 305 Cat Mini Excavator $95.00
$190.00
4 2 HR Service Truck $50.00
$100.00
TOTAL EXPLORATORY
$500.00
1 LS Per ISPWC, Article 12, allowance of 15% for OH & Profit
$75.00
Total
$575.00
sul>y1 at W i,)I. • way 1v schmr, r vat&' 6, 2015
William M Schmidt
Schmidt Construction Co Inc
s
= '
• � •
15883 Robber Place
Caldwell, Idaho 83607
208.459.2461 (Tel)
208.453.4968 (Fax)
208.941.1948 (Cell)
City of Meridian Change Order Request #8 4/6/2015 Bill Schmidt
NW 8th Street Trunk Sewer Main - Broadway to Cherry - Phase 3 President
Project #15-10330.A Id Public Works Lic #PWC -C -16406 -AAA -1 Expires: 6/30/2015
Explorato Excavation at 1401 NW 7TH Street
Line #1 Qt I Unitl' Description Unit Cost I
Extended Cost
Exploratory Excavation
1 4 HR Foreman $60.00
$240.00
2 4 HR Laborer Pie Layer) $45.00
$180.00
3 4 HR 305 Cat Mini Excavator $95.00
$380.00
4 4 HR Service Truck $50.00
$200.00
TOTAL EXPLORATORY
$1,000.00
1 LS Per ISPWC, Article 12, allowance of 15% for OH & Profit
$150.00
Total
$1,150.00
sabm ate' lry wa&-1 "M/V sc mals t Date/ 6, 2015
William M Schmidt
Schmidt Construction Co Inc
s 15883 Robber Place
Caldwell, Idaho 83607
208.459.2461 (Tel)
208.453.4968 (Fax)
6• 208.941.1948 (Cell)
City of Meridian Change Order Request #9 4/15/2015 Bill Schmidt
NW 8th Street Trunk Sewer Main - Broadway to Cherry - Phase 3 President
Project #15-10330.A Id Public Works Lic #PWC-C-16406-AAA-1 Expires: 6/30/2015
NW 7TH Street - Excavation and Replacement of Soft Spots
Line #
Qty I Unitj Description
Unit Cost Extended Cost
1
1 1 LS Knife River CO #1
$20,850.00 $20,850.00
(A). Change Order to include, excavation of 12" of unsuitable material, placing geotextile
fabric, importing 16" of Pit Run and 4" of 3/4" road mix,by direction of ACRD. Tina Loiue
(B). Contract bid price on Line Item #307.4.1.G.1 Type P Surface Restoration to remain the
same as original to offset additional work required to use end dump trucks, back into the
area, cover and fill over fabric to avoid pumping of the subgrade.
1 LS Per ISPWC, Article 12, allowance of 15% for OH & Profit $3,127.50
Total $23,977.50
Submared by." Ula& *;vA/ Sc,/ midt Data) 15, 2015
William M Schmidt
Schmidt Construction Co Inc
7CONSTR'UCT-OIN
15883 Robber
Caldwell, Idaho f
208.459.2461
208.453.4968
208.941.1948
City of Meridian Change Order Request #10 4/21/2015 Bill Schmidt
NW 8th Street Trunk Sewer Main - Broadway to Cherry - Phase 3 President
Project #15-10330.A Id Public Works Lic #PWC -C -16406 -AAA -1 Expires: 6/30/2015
NW 7TH Street - Excavation and Replacement of Soft Spots & Concrete Collars
Line #
Qty
Unit
Description
Unit Cost
Extended Cost
1
1
LS
Knife River CO #2
$3,465.00
$3,465.00
2
7
EA
Concrete Collars on existing water va ves no
included in original contract
$200.00
$1,400.00
Chan a Order Sub -Total
$4,865.00
1
LS
Per ISPWC, Article 12, allowance of 15% for OH
& Profit
$729.75
Total
$5,594.75
S� Uy' ���'1 S� Date-' i4prz L21, 2015
I I I (William M Schmidt
Schmidt Construction Co Inc
(A). Change Order includes, excavation of additional 12" to 16" of unsuitable material, re -placing geotextile fabric,
importing additional 12" to 16" of Pit Run and reshaping and recompacting the 4" of 3/4" road mix,by direction of
ACHD. Tina Louie
(B). Contract bid price on Line Item #307.4.1.G.1 Type P Surface Restoration to remain the same as original to
offset additional work required to use end dump trucks, back into the area, cover and fill over fabric to avoid
pumping of the subgrade.
`1 I
�_!
6"
• •
15883 Robber Place
Caldwell, Idaho 83607
208.459,2461 (Tel)
208.453.4968 (Fax)
208.941.1948 (Cell)
City of Meridian Change Order Request #11 4/30/2015
NW 8th Street Trunk Sewer Main - Broadway to Cherry - Phase 3
Project #15-10330.A Id Public Works Lic #PWC -C -16406 -AAA -1 Expires:
Bill Schmidt
President
6/30/2015
LLe_! Qty Unit Description Unit Cost
Extended Cost
1 1 LS Concrete Work Washington Street $1,075.00
$1,075.00
1 LS Per ISPWC, Article 12, allowance of 15% for OH & Profit
$161.25
Total
$1,236.25
skew' 1y -1T a&a v11 Schoudr vlatra.' 30, 2015
William M Schmidt
Schmidt Construction Co Inc
(A). Change Order includes, removal of existing concrete curb/gutter and sidewalk, removal of additional native
material to allow 4" of 3/4" road mix placed and compacted, placement of new concrete curb/gutter and sidewalk.