Loading...
HomeMy WebLinkAboutChange Order No 1 with Schmidt Construction for NW 8th St Sewer Trunk Phase 3C17YOF MISRIMAN 33 EAST BROADWAY MERIDIAN, 10 83042 CONTRACT CHANGE ORDER 00*4000V 10 hdVaIiy dlioated to Mok4 tho.lbliowlno changes fr6rh the Coolvaot b0our"Ghtg; and Plans. REFER TO ATTACHED CHANGE ORDER DOCUMENTS FROM SCHMIDT CONSTRUCTION 1060.00 fpr Change Order, 0DITIONAL-WORK'NEEDED. TO COMPLETE THE PROJECT (sea attached). ALSO ADDED THE -OLLOWING QUANTITIESTO THE. PROJEOT.-2,690 SY OF -TYPr=.'P SURFACE RESTORATION; 03 LF if 8 -INCH dRAVIT"Y �kftk_PIPE; -4,606 TON"6 OF 8 -INCH MINUS' UNORU-SHED AGGREGATE; -1 8 OF DEWATERING;' -1,188 SY'OF MISCELLANEOUS PAVEMENT; -80 LFOF 4 -INCH SEWER ERVICE EINE, I 'Original Cojv6k4j.pfjb6 Ofloi6s I contmot TIM60: days NO C11006810TYn Pravlaft.6fiangs 6rdore Net changes torn prov-1oulChano-o- Orders No.— to $0,00 N6._,. to (eojoflldoroaya) days Contract Ofte Prior to this Chm"pOrder, Coriftept Times Prlor to (his Change Order. $34040340 ("lefidir do") days Nit Inoresse (d"vosss).of th4 Change Order. Not i lhorosoo.(doorease) of this Chinp r Orde 411$11*12." —days COA086t Price With Oil Apip�oi4d 0006jiOMew, "iendardays) days APPROVED; (qtypol 'Ma l ACCEPTED' by:. Keith Waft by: Data: s U41, REMME _NDE0 ylp*d ma"aiii") — — — DATE ED:BY BY WUNCIL BY! 15 It- AU, -0 NO'S - ION ' ATURE REQUIRED /� IMO)v. do Wma�Elk�ID�;rk, joy44 L. Holffiso Tq . n;o < JDED: (City Engineering Managerk,'_____7r%'_P_ALL r W W 0 z Q 2 V M W U) a IL z Y z H W W N H W W H U) H co z 0 0d O O 0 O cqo o o o o Nt 0 �0) ti w L LO Cf)p i M 649, It M 00 64 i i 6% I" W N d OD d o o 0 0 0 0 0 0. =' N OD M O O � O N Itc pLL 0 J 0 o U J >- (n w J 'c a o w > O Y Z CLY C z� a� �omw wa`) 200 -0 - moo �vwa, Nc �o (D Z>cs WQf° w - C N coo U) a a W a= O d-0 Cl U a F -Z QQQ'c d=> Z� af o d C o•° (> �, 2 U) °-�0 J C N Q w•o Q N CO w> N 2 -> m E c > U > 0 W N_ N`t j Q Q N = Q Q Q a N c LU X0 Q U) � J U W N _aw a>w m>� Z"= rn Q wa`� m wa o a) .S N> N V U C (V >'+� U N 0 0 D } of '�� ao 0 W W �H �.Q CO 2 F-cW 3 0 co>S c`- U U) D m H Q T7 r- r- r- Z o0 o ao <., Q OU E o r z I M N 00 LO d' LO M LL W J F- O F- s • • 15883 Robber Place Caldwell, Idaho 83807 208.459.2461 (Tel) 208.453.4988 (Fax) 208.941.1948 (Cell) City of Meridian Change Order Request 3/20/2015 Bill Schmidt NW 8th Street Trunk Sewer Main - Broadway to Cherry - Phase 3 President Project #15-10330.A Id Public Works Lic #PWC-C-16406-AAA-1 Expires: 6/30/2015 Waterline Replacement Line Al Qt Unit Description Unit Cost Extended Cost 1 20 LF 6" C900 $5.23 $104.60 2 2 EA 6" Long Sleeves $87.50 $175.00 3 4 EA Accessory Packs $60.79 $243.16 4 2 HR Pie Laborer / Foreman $112.50 $225.00 5 0.5 HR 225D Excavator $200.00 $100.00 6 2 HR Service Truck $50.00 $100.00 7 1 LS Per ISPWC, Article 12 allowance of 15% for OH & Profit $142.16 Total $1089.92 Subrnaftk .' ivaiazofvAiSahM4de6 Dates NarvA,20, 2015 William M Schmidt Schmidt Construction Co Inc d • • 15883 Robber Place Caldwell, Idaho 83607 208.459.2461 (Tel) 208.453.4968 (Fax) 208.941.1948 (Cell) City of Meridian Change Order Request 4/1/2015 Bill Schmidt NW 8th Street Trunk Sewer Main - Broadway to Cherry - Phase 3 President Project #15-10330.A Id Public Works Lic #PWC-C-16406-AAA-1 Expires: 6/30/2015 Waterline Break on Washington Street Line # Qty Unit Description Unit Cost Extended Cost 1 40 LF 6" C900 $5.23 $209.20 2 2 EA 6" Long Sleeves $87.50 $175.00 3 4 EA Accessory Packs $60.79 $243.16 4 6 HR Superintendent $125.00 $750.00 5 6 HR Foreman $60.00 $360.00 6 6 HR Operator $45.00 $270.00 7 6 HR Laborer $45.00 $270.00 8 6 HR Laborer $45.00 $270.00 9 6 HR Laborer 1HR $45.00 $270.00 10 3 350G Excavator $175.00 $525.00 11 1 HR 225CLC Excavator $125.00 $125.00 12 1 HR 724KLoader $195.00 $195.00 13 6 HR Service Truck $50.00 $300.00 14 1 LS Hydro Cleaning and Removal of Haz Waste $762.50 $762.50 15 1 LS Per ISPWC, Article 12, allowance of 15% for OH & Profit $708.73 Total $5,433.59 lry.' lye 'ia vel Schnu car Dates' �r:L1, 2015 William M Schmidt Schmidt Construction Co Inc s +� �_� ' • am 15883 Robber Place Caldwell, Idaho 83607 208.459.2461 (Tel) 208.453.4968 (Fax) 208.941.1948 (Cell) City of Meridian Change Order Request #3 4/6/2015 Bill Schmidt NW 8th Street Trunk Sewer Main - Broadway to Cherry - Phase 3 President Project #1 5-10330.A Id Public Works Lic #PWC -C-1 6406 -AAA -1 Expires: 6/30/2015 Explorato Excavation & Repair at 625 W. Carlton Line #1 Qty I Unitj Description Unit Cost I Extended Cost Exploratory Excavation 1 4 HR Su erintendant $125.00 $500.00 2 4 1HR HR Foreman $60.00 $240.00 3 4 HR Laborer Pie Layer) $45.00 $180.00 4 4 Laborer Pie Layer) $45.00 $180.00 5 4 HR 305 Cat Mini Excavator $95.00 $380.00 6 4 HR Service Truck $50.00 $200.00 TOTAL EXPLORATORY EE $1,680.00 Concrete Prep & Repair 1 2 HR Foreman $60.00 $120.00 2 2 HR Laborer General $30.00 $60.00 3 2 HR Laborer General $30.00 $60.00 4 1 HR Cat 225D Excavator $150.00 $150.00 5 1 HR Cat 279C Skidsteer $250.00 $250.00 6 1 HR Service Truck $50.00 $50.00 7 1 EA Traffic Rated Cleanout Materials Only) $142.00 $142.00 8 60 SF Concrete - Sidewalk 12' x 5' $15.75 $945.00 9 156 SF Concrete - Driveway (12'x 13' $15.75 $2,457.00 TOTAL CONCRETE & REPAIR $4,234.00 TOTAL EE & REPAIR $5,914.00 1 LS Per ISPWC, Article 12, allowance of 15% for OH & Profit $887.10 Total $6,801.10 Sal mared� by, .• I.tha,zs Al Schm4& Date,, 6, 201 S William M Schmidt Schmidt Construction Co Inc 1 + ^ I J • • I 15883 Robber Place Caldwell, Idaho 83607 208.459.2461 (Tel) 208.453.4968 (Fax) 208.941.1948 (Cell) City of Meridian Change Order Request #4 4/6/2015 NW 8th Street Trunk Sewer Main - Broadway to Cherry - Phase 3 Project #15-10330.A id Public Works Lic #PWC -C -16406 -AAA -1 Expires: Bill Schmidt President 6/30/2015 Ex lorato Excavation & Repair at 613 W. Carlton Line #1 Qty I Unitj Description Unit Cost I Extended Cost Exploratory Excavation 1 5 HR Foreman $60.00 $300.00 2 5 HR Laborer Pie Layer) $45.00 $225.00 3 5 HR 305 Cat Mini Excavator $95.00 $475.00 4 5 HR Service Truck $50.00 $250.00 TOTAL EXPLORATORY EE $1,250.00 Concrete Prep & Repair 1 2 HR Foreman $60.00 $120.00 2 2 HR Laborer General $30.00 $60.00 3 2 HR Laborer General $30.00 $60.00 3 1 HR John Deere 225D Excavator $175.00 $175.00 4 1 HR Cat 279C Skidsteer $250.00 $250.00 5 1 HR Service Truck $50.00 $50.00 6 1 EA Traffic Rated Cleanout Materials Only) $142.00 $142.00 7 60 SF Concrete -Sidewalk (12'x 5' $15.75 $945.00 TOTAL CONCRETE & REPAIR $1,802.00 TOTAL EE & REPAIR $3,052.00 1 LS Per ISPWC, Article 12, allowance of 15% for OH & Profit $457.80 Total $3,509.80 sulrmarea lry • waz; M schmat Dates• fi ra 6, 2015 William M Schmidt Schmidt Construction Co Inc s 1 • • 15883 Robber Place Caldwell, Idaho 83607 208.459.2461 (Tel) 208.453.4968 (Fax) 208.941.1948 (Cell) City of Meridian Change Order Request #5 4/6/2015 Bill Schmidt NW 8th Street Trunk Sewer Main - Broadway to Cherry - Phase 3 President Project #15-10330.A Id Public Works Lic #PWC-C-16406-AAA-1 Expires: 6/30/2015 Exploratory Excavation at 561 W. Carlton Line #1 Qty I Unit Description Unit Cost I Extended Cost Exploratory Excavation 1 4 HR Foreman $60.00 $240.00 2 4 HR Laborer Pie Layer) $45.00 $180.00 3 5 HR Laborer (Pipe Layer) $45.00 $225.00 4 4 HR 305 Cat Mini Excavator $95.00 $380.00 5 4 HR Service Truck $50.00 $200.00 TOTAL EXPLORATORY $1,225.00 1 LS Per ISPWC, Article 12, allowance of 15% for OH & Profit $183.75 Total j $1,408.75 S"bm, tte.-.i�rry" Gt a&a4,;vMSchmtidt Data) >4 `r.L6, 2015 William M Schmidt Schmidt Construction Co Inc s = I Lidian 15883 Robber Place Caldwell, Idaho 83607 208.459.2461 (Tel) 208.453.4968 (Fax) 208.941.1948 (Cell) Change Order Request #6 4/6/2015 Bill Schmidt NW 8th Street Trunk Sewer Main - Broadway to Cherry - Phase 3 President Project #15-10330.A Id Public Works Lic #PWC -C -16406 -AAA -1 Expires: 6/30/2015 Explorato Excavation at 650 W. Washington St. Line # Qty jUnitjDescription I Unit Cost I Extended Cost Exploratory Excavation 4/2/2015 1 4 HR Foreman $60.00 $240.00 2 4 HR Laborer Pie Layer) $45.00 $180.00 3 4 HR 305 Cat Mini Excavator $95.00 $380.00 4 4 HR Service Truck $50.00 $200.00 TOTAL EXPLORATORY $1,000.00 Exploratory Excavation 4/3/2015 1 1.5 HR Superintendent $125.00 $187.50 2 1.5 HR Foreman $60.00 $90.00 3 1.5 HR Foreman $60.00 $90.00 4 1.5 HR Laborer (Pipe Layer) $45.00 $67.50 5 1.5 HR Laborer Pie Layer) $45.00 $67.50 6 1.5 HR 305 Cat Mini Excavator $95.00 $142.50 7 1.5 HR Service Truck $50.00 $75.00 TOTAL EXPLORATORY $720.00 Exploratory Excavation 4/6/2015 1 1 HR Foreman $125.00 $125.00 2 0.5 HR 305 Cat Mini Excavator $95.00 $47.50 3 1.5 HR Service Truck $50.00 $75.00 TOTAL EXPLORATORY $247.50 GRAND TOTAL EXPLORATORY $1,967.50 1 LS Per ISPWC, Article 12, allowance of 15% for OH & Profit $295.13 Total $2,262.63 S"bm ttew' Iry - wr; &r* m schmat Data• -6,2015 William M Schmidt Schmidt Construction Co Inc 1Caldwell, • I 666.61ffl- 15883 Robber Place Idaho 83607 208.459.2461 (Tel) 208.453.4968 (Fax) 208.941.1948 (Cell) City of Meridian Change Order Request #7 4/6/2015 NW 8th Street Trunk Sewer Main - Broadway to Cherry - Phase 3 Project #15-10330.A Id Public Works Lic #PWC -C -16406 -AAA -1 Expires: Bill Schmidt President 6/30/2015 Ex lorato Excavation at 651 W. Washington St. Line #1 Qty I Unitj Description Unit Cost I Extended Cost Exploratory Excavation 1 2 HR Foreman $60.00 $120.00 2 2 HR Laborer Pie Layer) $45.00 $90.00 3 2 HR 305 Cat Mini Excavator $95.00 $190.00 4 2 HR Service Truck $50.00 $100.00 TOTAL EXPLORATORY $500.00 1 LS Per ISPWC, Article 12, allowance of 15% for OH & Profit $75.00 Total $575.00 sul>y1 at W i,)I. • way 1v schmr, r vat&' 6, 2015 William M Schmidt Schmidt Construction Co Inc s = ' • � • 15883 Robber Place Caldwell, Idaho 83607 208.459.2461 (Tel) 208.453.4968 (Fax) 208.941.1948 (Cell) City of Meridian Change Order Request #8 4/6/2015 Bill Schmidt NW 8th Street Trunk Sewer Main - Broadway to Cherry - Phase 3 President Project #15-10330.A Id Public Works Lic #PWC -C -16406 -AAA -1 Expires: 6/30/2015 Explorato Excavation at 1401 NW 7TH Street Line #1 Qt I Unitl' Description Unit Cost I Extended Cost Exploratory Excavation 1 4 HR Foreman $60.00 $240.00 2 4 HR Laborer Pie Layer) $45.00 $180.00 3 4 HR 305 Cat Mini Excavator $95.00 $380.00 4 4 HR Service Truck $50.00 $200.00 TOTAL EXPLORATORY $1,000.00 1 LS Per ISPWC, Article 12, allowance of 15% for OH & Profit $150.00 Total $1,150.00 sabm ate' lry wa&-1 "M/V sc mals t Date/ 6, 2015 William M Schmidt Schmidt Construction Co Inc s 15883 Robber Place Caldwell, Idaho 83607 208.459.2461 (Tel) 208.453.4968 (Fax) 6• 208.941.1948 (Cell) City of Meridian Change Order Request #9 4/15/2015 Bill Schmidt NW 8th Street Trunk Sewer Main - Broadway to Cherry - Phase 3 President Project #15-10330.A Id Public Works Lic #PWC-C-16406-AAA-1 Expires: 6/30/2015 NW 7TH Street - Excavation and Replacement of Soft Spots Line # Qty I Unitj Description Unit Cost Extended Cost 1 1 1 LS Knife River CO #1 $20,850.00 $20,850.00 (A). Change Order to include, excavation of 12" of unsuitable material, placing geotextile fabric, importing 16" of Pit Run and 4" of 3/4" road mix,by direction of ACRD. Tina Loiue (B). Contract bid price on Line Item #307.4.1.G.1 Type P Surface Restoration to remain the same as original to offset additional work required to use end dump trucks, back into the area, cover and fill over fabric to avoid pumping of the subgrade. 1 LS Per ISPWC, Article 12, allowance of 15% for OH & Profit $3,127.50 Total $23,977.50 Submared by." Ula& *;vA/ Sc,/ midt Data) 15, 2015 William M Schmidt Schmidt Construction Co Inc 7CONSTR'UCT-OIN 15883 Robber Caldwell, Idaho f 208.459.2461 208.453.4968 208.941.1948 City of Meridian Change Order Request #10 4/21/2015 Bill Schmidt NW 8th Street Trunk Sewer Main - Broadway to Cherry - Phase 3 President Project #15-10330.A Id Public Works Lic #PWC -C -16406 -AAA -1 Expires: 6/30/2015 NW 7TH Street - Excavation and Replacement of Soft Spots & Concrete Collars Line # Qty Unit Description Unit Cost Extended Cost 1 1 LS Knife River CO #2 $3,465.00 $3,465.00 2 7 EA Concrete Collars on existing water va ves no included in original contract $200.00 $1,400.00 Chan a Order Sub -Total $4,865.00 1 LS Per ISPWC, Article 12, allowance of 15% for OH & Profit $729.75 Total $5,594.75 S� Uy' ���'1 S� Date-' i4prz L21, 2015 I I I (William M Schmidt Schmidt Construction Co Inc (A). Change Order includes, excavation of additional 12" to 16" of unsuitable material, re -placing geotextile fabric, importing additional 12" to 16" of Pit Run and reshaping and recompacting the 4" of 3/4" road mix,by direction of ACHD. Tina Louie (B). Contract bid price on Line Item #307.4.1.G.1 Type P Surface Restoration to remain the same as original to offset additional work required to use end dump trucks, back into the area, cover and fill over fabric to avoid pumping of the subgrade. `1 I �_! 6" • • 15883 Robber Place Caldwell, Idaho 83607 208.459,2461 (Tel) 208.453.4968 (Fax) 208.941.1948 (Cell) City of Meridian Change Order Request #11 4/30/2015 NW 8th Street Trunk Sewer Main - Broadway to Cherry - Phase 3 Project #15-10330.A Id Public Works Lic #PWC -C -16406 -AAA -1 Expires: Bill Schmidt President 6/30/2015 LLe_! Qty Unit Description Unit Cost Extended Cost 1 1 LS Concrete Work Washington Street $1,075.00 $1,075.00 1 LS Per ISPWC, Article 12, allowance of 15% for OH & Profit $161.25 Total $1,236.25 skew' 1y -1T a&a v11 Schoudr vlatra.' 30, 2015 William M Schmidt Schmidt Construction Co Inc (A). Change Order includes, removal of existing concrete curb/gutter and sidewalk, removal of additional native material to allow 4" of 3/4" road mix placed and compacted, placement of new concrete curb/gutter and sidewalk.