Loading...
HomeMy WebLinkAboutChange Order No 8 with Contractors NW for WWTP Fermentation and Odor ControlCITY OF MERIDIAN 33 EAST BROADWAY MERIDIAN, ID 83642 CONTRACT CHANGE ORDER CHANGE ORDER NO. 8 PROJECT NO. 10045a DATE: 4/15/2015 EFFECTIVE DATE: 4/15/2015 CONTRACTOR: Contractors Northwest, Inc. PROJECT: WWTP Fermentation and Odor Control Project The Contractor is hereby directed to make the following changes from the Contract Documents and Plans. Description: The addition of a fermentation tank scum overflow wasting pipe, upgraded mixer motors and electrical, and the addition of scum busting pump and spray nozzles. Reason for Change Order: To implement improvements to the fermentation tank in an effort to eliminate the potential for scum and foam accumulation in the fermenter. Attachments: Pricing for COR 42 CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price $ $2,221,500.00 Original Contract Times: 400 Net changes form previous Change Orders Net changes form previous Change Orders No _1_ to 6_ No._1_, to 6_ (calendar days) $ 372,791.00 120 Contract Price Prior to this Change Order: Contract Times prior to this Change Order: (calendar days) $ 2,594,291.00 520 Net Increase (decrease) of this Change Order. Net Increase (decrease) of this Change Order. (calendar days) $ 197,881.00 180 Contract Price with all Approved Change Orders: Contract Times with all Approved Change Orders: (calendar days) $ 2,792,172.00 700 APPROVED: (City Purchasing ana ) ACCEPTED: (Contractor) / W1,IR'ti�� 1517J11�VCV� By: Keith Watts Date: % Date: RECOM ED: (Public Yorks) DATE APPROVED BY COUNCIL By: NO SIGNATURE REQUIRED Date: G DATE: PROVED- t/) Goo ST:By: ;By: i Clerk,Wycee L. Holman MayorTammy a Weerd +Cityof Date: ., /YL E IDI— x Fy ., 1fr '4" �I the TAFA9'1V�' SPA0.00 , % 0:00, 42422.OU A2.00 ;. 8&00 - HR 1020 00 _ 80;00 , HR 12=00 4A0,,, _ 40.00 HR , 160;`00 . Subtotal 42422.OU 4202-20 Overhead &-ProfiLCN1 provided,Q 10%' 1,00 _,_ 4202200 ;, 0,10 693.36 Bond ra#e 1.00 46224,200.01500 tiiabillty Insurance ' r 1.00 46917,56 0.00550 '. 256:05 Builders risk itrsurance :. 1.00 47175,61 "0,00350 1651.11 Total.$47,341 *4/1712015 Pap 1 Sheet3COR 42.1 Scum foam line4ev2.xls E Contractor. CONTRACTORS NORTHWEST, INC. Project: Meridian WWTP Fermentation & Odor control - project# 424845 Reference: Scope of change: Mixer motor upgrade Change Order Request No: 42.2 Revised 4/17/2015 2:05 PM4/17/2015 Page 1 Sheet3COR 42.2 Mixer motor-rev2.xls Item # Description Quantity Price Unit Cost 1 Westech equipment 1.00 24900.00 Is 24900.00 2 Electrical 1.00 29500.00 is 29500.00 3 CNllabor 40.00 45.00 hr 1800.00 4 small tools 1.00 125.00 Is 125.00 7 Misc materials & consumables 1.00 159.00 Is 159.00 9 0.00 10 0.00 11 0.00 12 0.00 13 0.00 0.00 0.00 14 0.00 0.00 0.00 0.00 0.00 Sales tax @ 6% 0.06 0.00 % 0.00 Project Manager 16.00 85.00 HR 1360.00 Superintendent 24.00 80.00 HR 1920.00 Clerical - office 2.00 40.00 HR 80.00 Labor - clean-up 0.00 32.00 HR 0.00 Sub -total 59844.00 Overhead & Profit: CNI provided @ 10% 1.00 59844.00 0.10 5984.40 Bond rate 1.00 65828.40 0.01500 987.43 Liability insurance 1.00 66815.83 0.00550 367.49 Builders risk insurance 1.00 67183.31 0.00350 235.14 Total j $67,418 2:05 PM4/17/2015 Page 1 Sheet3COR 42.2 Mixer motor-rev2.xls Contractor: CONTRACTORS NORTHWEST, INC. Project: Meridian WWTP Fermentation & Odor control - project # 424845 Reference: Scope of change: Scum Foam Buster Change Order Request No 42.3 Revised 4/17/2015 2:05 PM4/17/2015 Page 1 Sheet3COR 42.3 Scum foam buster-rev2.xis Item # Description Quantity Price Unit Cost 1 IScum foam buster system 1.00 19700.00 Is 19700.00 2 storage building 1.00 3186.00 Is 3186.00 3 CNI tabor 80.00 45.00 hr 3600.00 4 Electrical 1.00 22575.00 Is 22575.00 7 Misc piping & materials 1.00 398.00 Is 398.00 8 0.00 9 0.00 10 0.00 11 0.00 12 0.00 13 0.00 0.00 0.00 14 0.00 0.00 0.00 0.00 0.00 Sales tax C 6% 0.06 0.00 % 0.00 Project Manager 8.00 85.00 HR 680.00 Superintendent 28.00 80.00 HR 2240.00 Clerical - office 2.00 40.00 HR 60.00 Labor - clean-up 0.00 32.00 HR 0.00 Sub -total 52459.00 Overhead & Profit: CNI provided 10% 1.00 52459.00 0.10 5245.90 Bond rate 1.00 57704.90 0.01500 865.57 Liability insurance 1.00 58570.47 0.00550 322.14 Builders risk insurance 1.00 58892.61 0.00350 206.12 Total $59,099 2:05 PM4/17/2015 Page 1 Sheet3COR 42.3 Scum foam buster-rev2.xis Contractor: CONTRACTORS NORTHWEST, INC. Project: Meridian WWTP Fermentation & Odor control - project # 424845 Reference: Scope of change: Mixer Impeller replacement Change Order Request No 42.4 Revised 4/17/2015 2:07 PM4/17/2015 Page 1 Sheet3COR 42.4 Mixer impeller rev-2.xls Item # Description Quantity Price Unit Cost 1 Westech material 1.00 11500.00 Is 11500.00 2 CNllabor 72.00 45.00 hr 3240.00 3 small tools 1.00 125.00 is 125.00 4 Misc materials & consumables 1.00 159.00 Is 159.00 7 Crane & equipment 1.00 4600.00 Is 4600.00 8 Is 0.00 9 0.00 10 0.00 11 0.00 12 0.00 13 0.00 0.00 0.00 14 0.00 0.00 0.00 0.00 0.00 Sales tax G 6% 0.06 0.00 % 0.00 Project Manager 4.00 85.00 HR 340.00 Superintendent 16.00 80.00 HR 1280.00 Clerical - office 2.00 40.00 HR 80.00 Labor - clean-up 0.00 32-00 HR 0.00 Sub -total 21324.00 Overhead & Profit: CNI provided 10% 1.00 21324.00 0.10 2132.40 Bond rate 1.00 23456.40 0.01500 351.85 Liability insurance 1.00 23808.25 0.00550 130.95 Builders risk insurance 1.00 23939.19 0.00350 83.79 Total $24,023 2:07 PM4/17/2015 Page 1 Sheet3COR 42.4 Mixer impeller rev-2.xls