HomeMy WebLinkAboutExecuted TASK ORDER 10520.a Civil Survey Waterline Replacement - Elm Linder to EndTASK ORDER NO. 10520.a
Pursuant to the
MASTER AGREEMENT FOR PROFESSIONAL SERVICES
BETWEEN
CITY OF MERIDIAN (OWNER) AND CIVIL SURVEY CONSULTANTS (ENGINEER)
This Task Order is made this Ig7%ay of November, 2014 and entered into by and between
the City of Meridian, a municipal corporation organized under the laws of the State of Idaho,
hereinafter referred to as "City", and accepted by CIVIL SURVEY CONSULTANTS. hereinafter
referred to as "Engineer" pursuant to the mutual promises, covenant and conditions contained
in the Master Agreement (Category 1b) between the above mentioned parties dated
September 18, 2012. The Project Name for this Task Order 10520.a is as follows:
CITY OF MERIDIAN
WATERLINE REPLACEMENT
W. ELM PLACE - LINDER ROAD TO EAST END
DESIGN AND CONSTRUCTION SERVICES
PROJECT UNDERSTANDING
The Engineer shall provide professional engineering services related to the replacement of
approximately 462 linear feet of 4" water main in Elm Place with a new fire hydrant at the end
of the cu -de -sac.
SCOPE OF WORK
Task 1 — Administration
1.1 Set up the contract and submit written communication through the City's project
management software. This includes but is not limited to the following:
• Reports
• Drawings
• Requests for Information
• Request for Action by City
• General Project Documentation & Communication
• Pay Invoices
TASK ORDER 10520.a - Waterline Replacement — W. Elm Place -Linder Rd to East End Page 1 of 5
Civil Survey Consultants
Task 2 — Design Surveying
2.1 This task includes field work associated with performing topographic survey
required to complete the design. Topographic survey shall cover all existing
items from back of sidewalk to back of sidewalk, existing water meters and any
items that may impact the installation of a new meter or hydrant. This task also
includes opening the existing water meter cover and identifying existing water
service size and if meter is a single or a double. The existing utilities shall be
marked by dog -line to allow for potholes.
2.2 This task includes office work associated with drafting the topographic survey,
establishing the public right-of-way, and establishing property lines. We
anticipate that for the purposes of this project we will be able to define the
existing public right-of—way and property lines from the subdivision plat recorded
with Ada County.
2.3 This task includes office and field work associated with potholing existing water
main. The existing water main in Elm Place shall be potholed in two locations to
determine pipe type and depth. The existing water main in Linder Road shall be
potholed in one location to determine pipe type and depth to assist with new
water main connection.
Task 3 — Design Improvements
3.1 This task includes designing water system improvements. Approximately 462
linear feet of water main shall be replaced in Elm Place with a new fire hydrant
at the east end of Elm Place. The existing water meters and service lines shall
be replaced at locations identified by the City. The existing site conditions and the
pothole results shall be reviewed with the City to determine if pipe bursting is an
acceptable method of replacement
3.2 This task includes sending letters to property owners fronting project notifying
them of the project and its anticipated construction schedule. A separate letter
shall be sent to notify any property owners of the projects intention to place a
hydrant on their property. The letters shall be submitted to City staff for approval
prior to the mailing of the letter. City will provide property owner names and
mailing addresses as needed. This task also includes time responding to
telephone calls from property owners.
Task 4 — Construction Document Preparation and Review
4.1 Develop plans, specifications, cost estimate and bid schedule that meet current
design standards and standard specifications of the City and ISPWC. Technical
Specifications will conform to the formatting of the ISPWC.
TASK ORDER 10520.a - Waterline Replacement — W. Elm Place -Under Rd to East End Page 2 of 5
Civil Survey Consultants
• If it is deemed that pipe bursting is an acceptable method of replacement then
plans and specifications shall be developed to allow project to be bid and
constructed by either the open trench method or the pipe bursting method.
• A Traffic Control Plan will be prepared and included in the construction plans.
The traffic control plan will be submitted to ACHD for review. Engineer will
revise plans as necessary and resubmit.
o The contractor will use the plan to assist in obtaining a permit from ACHD.
o The contractor will make all necessary revisions to the traffic control as
required by ACHD.
• An Erosion and Sediment Control Plan (ESCP) will be prepared and
submitted to the City and ACHD for review. The ESCP will be prepared in
accordance with the City of Meridian Construction Stormwater Management
Program. Engineer will revise plans as necessary and resubmit.
4.2 Submit five (5) full size copies of plans and two (2) copies of specifications to City
Engineering for departmental review and comment. Engineer will revise plans as
necessary and resubmit.
4.3 Submit three (3) full size copies of revised plans and one (1) set of specifications
to City Engineering for Development Services and Environmental review.
Engineer to revise plans as necessary and resubmit.
4.4 Submit one (1) full size copies of plans and specifications to ACHD for review
and approval. Engineer will revise plans as necessary and resubmit.
4.5 Submit four (4) full size copies of plans and one (1) set of specifications to City
Engineering for QLPE review and approval. Engineer will revise plans as
necessary and resubmit.
4.6 Prepare final construction documents with inclusion of any changes from the
review phases and provide the following copies during and after the bidding
phase:
• Twenty (20) copies for bid and distribution purposes.
• Up to five (5) copies for contractor's use.
Task 5 — Construction Services
5.1 Provide one set of construction stakes for the design improvements. We
anticipate that all staking will be completed in one trip to the site.
TASK ORDER 10520.a - Waterline Replacement — W. Elm Place -Linder Rd to East End Page 3 of 5
Civil Survey Consultants
Stakes will be provided for the water main at each valve, tee, or bend. An
intermediate point will be provided when the distance between stakes is
greater than 300 LF. Vertical control will not be provided.
Stakes will be provided for one new fire hydrant and sixteen new water
services.
Staking will be completed within 48 hours when requested in writing by the
Contractor.
5.2 Engineer will attend the pre-bid meeting.
5.3 Engineer will attend the pre -construction meeting.
5.4 Answer RFPs from contractor during bidding and construction about the design.
5.5 Review material specifications submitted by contractor.
5.6 Prepare record drawings meeting the City of Meridian Acceptance of
Record/Electronic Drawings, dated October 25, 2012.
ASSUMPTIONS
• Right-of-way or boundary surveys are not included in this scope of work. Easement
preparation is not part of the scope of work.
• Title reports are not part of the scope of work.
• There are no irrigation district facilities located within project area.
• The City Project Manager and Water Division shall conduct a field survey of the existing
water services and identify which services shall be replaced and what size they shall be.
TIME OF COMPLETION and COMPENSATION SCHEDULE
The following schedule is based on a Notice to Proceed (NTP) from the City by November
2014 and Final Plans by September 2015. A NTP issued on a different date will change the
schedule accordingly.
TASK ORDER 10520.a - Waterline Replacement —W. Elm Place -Linder Rd to East End Page 4 of 5
Civil Survey Consultants
COMPENSATION AND COMPLETION SCHEDULE
Task
Description
Due Date
Compensation
1
Administration
■ 30 days after completion of construction
$484.00
2
Design Surveying
■ September 2015
$4,520.00
3
Design Improvements
■ September 2015
$1,694.00
4
Construction Documents
■ Se tember 2015
$5,584.00
5
Construction Services
■ 30 days after completion of construction
$3,586.00
Misc Printing and Potholina
■ 30 days after completion of construction
$1,025.00
TASK ORDER TOTAL: $16,893.00
TASK ORDER 10520.a - Waterline Replacement —W. Elm Place -Linder Rd to East End Page 4 of 5
Civil Survey Consultants
The Not -To -Exceed amount to complete all services listed above for this Task Order No.
10520.a is Sixteen Thousand Eight Hundred Ninety -Three dollars and 00/100 ($16,893.00).
No compensation will be paid over the Not -to -Exceed amount without prior written approval by
the City in the form of a Change Order. The hourly rates for services and direct expenses shall
be billed per the approved Rate Schedule and Master Agreement (by this reference made a
part hereof) and will be the basis for any additions and/or deletions in services rendered.
Travel and meals are excluded from this Task Order unless explicitly listed in the Scope of
Services AND Payment Schedule.
CITY OF MERIDIAN
BY: - ��, r�,X4,1 W, //, X,,�
KEITHJWATTS, /Purchasing Manager
Dated:
Department Approval
BY:
Kyle Radek, Assistant City Engineer
DATE: �1�g,%1
CIVIL SURVEY CONSULTANTS
BY:
TIM BU GESIS. ,Ace en
Dated: /L_- 16--A-1
Project Manager
Dean Stacey
TASK ORDER 10520.a - Waterline Replacement — W. Elm Place -Linder Rd to East End Page 5 of 5
Civil Survey Consultants