HomeMy WebLinkAboutExecuted Task Order 10340.i DC Well 21 Treatment Facility- SCADA Programming ProjectTASK ORDER NO. 10340.1 Pursuant to the MASTER AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN CITY OF MERIDIAN (OWNER) AND DC ENGINEERING (ENGINEER) This Task Order is made this 11h day of February, 2015 and entered into by and between the City of Meridian, a municipal corporation organized under the laws of the State of Idaho, hereinafter referred to as "City", and accepted by fQC -ENGINEER INQ), hereinafter referred to as "Engineer" pursuant to the mutual promises, covenant and conditions contained in the Master Agreement (Category 7a) between the above mentioned parties dated September 18, 2012. The Project Name for this Task Order 10340i is as follows: CITY OF MERIDIAN MERIDIAN WELL 21 TREATMENT FACILITY SCADA PROGRAMMING PROJECT SCOPE OF WORK Our scope is to provide control system software services, programming, and field testing which will be used for monitor and control of the new water filtration system currently under construction. Task 1 — Process Development and Process Design Review • Develop process loop descriptions Task 2 - Programming and Offsite Validation Testing • Modify existing Well 21 logic to interface with the new filter package • Develop standard filter objects for Wonderware to be used on this and future filter projects. • Complete the SCADA HMI programming for the new systems • Perform offsite testing to verify proper operation of PLC and HMI Task 3 — Software Implementation, Validation, and Operator Training • Implement programming efforts defined in Task 2 TASK ORDER NO. 103401- Meddlan Well 21 Tran neat FadAly SCADA Programming Project Page 1 of 3 00 ENGINEERING • Complete the Win 911 programming for existing system • Validate control and monitoring system operations • Provide Operator Training Deliverables • Initial process loop descriptions • f=inal process loop descriptions • Electronic copy of the PLC and HMI programs that are created and modified during the project. ASSUMPTIONS While preparing our scope of services and fee estimate, we have made the following assumptions: • Programming will be completed offsite • Site construction design and drawings will be provided • All field wiring will be complete prior to onsite testing TIME OF COMPLETION and COMPENSATION SCHEDULE The following schedule is based on a Notice to Proceed (NTP) from the City by February 15, 2015 and resulting in Final Programming and Startup services being completed by May, 2015, A NTP issued on a different date will change the schedule accordingly. COMPENSATION AND COMPLETION SCHEDULE Task Description Due Date Compensation I Process Development and Process Design Review . March 1, 2015 ■ $2,760 2 Programming and Offsite validation Testing ■ March 15, 2015 - $6,500 3 Software implementation, Validation, and Operator Training ■ March 20, 2015 w $2,760 TASK ORDER TOTAL $12,020 The Not -To -Exceed amount to complete all services listed above for this Task Order No. 10340i is twelve thousand twenty dollars ($12,020). No compensation will be paid over the Not -to -Exceed amount without prior written approval by the City in the form of a Change Order. The hourly rates for services and direct expenses shall be billed per the approved Rate Schedule and Master Agreement (by this reference made a part hereof) and will be the basis TASK ORDER NO. 103401. Meridian Well 21 Treatment Facility SCADA Programming Project Page 2 013 DO ENGINEERING for any additions and/or deletions in services rendered. Travel and meals are excluded from this Task Order unless explicitly listed in the Scope of Services AND Payment Schedule. CITY OF MERIDIAN BY: KEIT TT , Purchasing anager Dated: Department Approval _ _ CLING RTHjNG70N, Siaff Engineer� II Dated: Z A i 5 DC ENGINEERING BY: C C Dated. a , TASK ORDER NO. 1 UH01- Merman Weft 21 Treatment Fac[6ty SCADA Programming Project Page 3 013 DC ENGINEERING