Loading...
HomeMy WebLinkAboutExecuted Task Order 0596.a JUB South Black Cat Pressure Sewer CommissioningTASK ORDER NO. 0596.a Under the MASTER AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN CITY OF MERIDIAN (CITY) AND JUB ENGINEERS, INC (ENGINEER) This Task Order is made this 2nd day of February, 2015 and entered into by and between the City of Meridian, a municipal corporation organized under the laws of the State of Idaho, hereinafter referred to as "City", and accepted by JUB ENGINEERS, INC, hereinafter referred to as "Engineer" pursuant to the mutual promises, covenant and conditions contained in the Master Agreement (Category 1 b) between the above mentioned parties dated September 18, 2012. The Project Name for this Task Order 0596.a is as follows: CITY OF MERIDIAN SOUTH BLACK CAT PRESSURE SEWER COMMISSIONING I. PROJECT UNDERSTANDING Flows have increased at the South Black Cat Lift Station requiring the City to bring the reserve 18 - inch pressure into service. This project entails designing the necessary air release and vacuum relief valve upgrades, pump evaluations, leakage testing and other commissioning activities as described herein. II. OWNER INFORMATION, RESPONSIBILITIES and PROJECT ASSUMPTIONS 1. The City will provide J -U -B with the following: a) Available SCADA information at the South Black Cat Lift Station to estimate peak influent flows, pumping rates and discharge pressures. b) Operations staff contact to assist the Engineer with site visits at each air/vac manhole. c) Record drawings of: 1) South Black Cat Pressure Sewer, and other pertinent record information. d) Provide on-going review of J -U -B's work and timely consideration of policy issues with a time acceptable to the CITY and J -U -B. e) Pay for all permits and fees needed for the project. D Provide project manager to serve as a liaison with other City departments to facilitate the project reviews and approval process. Task Order 0596.a South Black Cat Pressure Sewer Commissioning Page 1 of 5 JUB ENGINEERS, INC 2. The City will provide the following during the bidding and construction process: a) All bidding and contract documents necessary to solicit bids for the project with incorporation of J -U -B's technical specifications and drawings. b) Provide all administration to solicit bids for the project. c) Following a review of the bids received, the CITY will award and execute the Agreement with the successful bidder. d) During construction of the project the City will provide construction engineering, administration and observation services as necessary, unless the City directs J -U -B to provide these as additional services. 3. Project Assumptions a) Exact locations of utilities are not known and may affect the upgrades during installation. b) Improvements at the South Black Cat Lift Station or the existing discharge structure are not anticipated. c) No topographic survey will be required. d) Contactor shall be responsible for securing an approved Traffic Control Plan (TCP) from the Ada County Highway District (ACHD). The project will have limited excavation in the public rights -of -ways, and therefore significant TCP will not be required. e) Contractor will be responsible for securing any necessary erosion and sediment control permits through the City. The project is anticipated only to include spot excavations that result in a total land disturbance well below the EPA's one acre threshold requiring a Construction General Permit. III. SCOPE OF WORK J -U -B's scope of services is specifically limited to the following: Task 1 — Project Meetings and Administration 1. Kickoff Meeting: Attend a kick-off meeting with CITY staff for the purpose of discussing the project approach, deliverables, schedule, and obtaining information that may be available from the CITY. 2. Progress Meetings: Attend progress meetings with the CITY staff as needed to discuss project status, provide task order status summaries, present deliverables, and receive direction from the CITY. It is anticipated that two (2) additional meetings will be necessary. 3. Project Administration and Tracking. Monitor team progress, action item lists, task deadlines, items needed from the CITY, provide documentation, permitting milestones, and critical path items as needed. J -U -B shall utilize to as practical extent as feasible, the City's project management software, for transmission of project documents to the City including invoicing, reports, any electronic plan submittals, and construction submittal review. Task Order 0596.a South Black Cat Pressure Sewer Commissloning Page 2 of 5 JUB ENGINEERS, INC Task 2 — Final Design Services 1. 90% Final Design, Plans and Technical Specifications (Agency Review): a. Field Review: J -U -B will review each existing air/vac relief manhole and the existing discharge box located at the WWTP. Input from CITY operations staff will be incorporated into the upgrades at each manhole. b. Existing Flows and Pump Operation Analysis: Review and analyze SCADA information to generalize seasonal peak and average day flows. Review pumping records for pumping performance with published information. Estimate operating points for the existing pumps over a variable speeds to aid in pump start up. c. Upgrade Design: Review pressure sewer flows and hydraulics for initial and final phasing conditions and size air/vac valve upgrades. Design connection details to the existing air/vac relief manholes. Review existing discharge box and detail actions needed by the Contractor to bring the pressure sewer on-line. Review flow meter and face piping at the lift station for any required upgrades. d. Base Drawings and Details: Prepare site vicinity mapping using available GIS base mapping. Sheets will be on 11 x17 or 8.5 x 11 size to be included as an appendix in the technical specifications. e. Technical Specifications: Prepare technical specifications for items that are not covered or are in addition (clarification) to the 2012 ISPWC and Meridian's Supplemental Specifications and Standard Drawings (2012 Edition). Technical Specifications will conform to the formatting in the ISPWC. The specifications will include requirements for testing and start up services of the 18 -inch pressure sewer, including monitoring of pumping equipment, discharge box start-up actions, and other necessary improvements. A bid schedule and estimate of probable construction cost will be prepared. f. OC Review: A senior engineer will complete an internal QA/QC review. g. Review Meeting: Submit 90% complete package to the CITY for review. Meet with the CITY to review submittal and receive comments and direction from the staff. The CITY will provide full review and comments from Public Works Engineering staff. Deliverables: L 90% Complete Plan/Technical Specification Package - four(4) hard copies, one (1) digital pdf. 2. 100% Complete Design, Plans and Technical Specifications: J -U -B shall complete the following subtasks in preparation of the 100% complete agency review package. a. Incorporate applicable CITY and Agency review comments into the plans and technical specifications. Complete remaining final design items. b. Update the preliminary opinion of probable construction costs and Bid Schedule. c. Submit final 100% package including final opinion of probable construction cost. Deliverables: i. 100% Complete Plans/Technical Specifications Package - four (4) copies, one (1) digital pdf. ii. Bid Schedule and Final opinion of probable construction cost. Task Order 0596.a South Black Cat Pressure Sewer Commissioning Page 3 of 5 JUB ENGINEERS, INC Task 3 — Agency Coordination 1. ACHD Coordination and Permitting a. J -U -B will coordinate with the Ada County Highway District (ACHD) to determine permitting required for the project. 90% complete plans and technical specifications will be submitted to ACHD for review and comment. 2. IDEQ Submittal Packages a. J -U -B will contact the Boise Regional office of IDEQ to determine project review and submittal requirements, if any to commission the pressure sewer. It is anticipated that a checklist and a summary letter explaining the project will be required. The CITY will provide QLPE review and approval of the design package once completed. Task 4 — Bidding and Construction Assistance Services J -U -B will furnish the services specifically limited to the following at a time and materials, not to exceed basis. 1. Bidding Services a. J -U -B will provide 8 sets of the Plans and Special Provisions and the bid schedule for the City's incorporation into its standard bidding documents for bidding purposes. b. The City will prepare all "front-end" documents and all bidding documents will be distributed through the City's Purchasing office. c. Legal notice for advertisement of Bids will be prepared by the City. d. J -U -B will assist the City in responding to technical questions that the City is unable to answer through review of the Contract Documents for City's use in preparation of addenda. 2. Construction Services: J -U -B's project manager/engineer will be available during construction to assist the CITY as described below or specifically requested by the CITY; a. Preconstruction Conference: J -U -B will attend the pre -construction conference with the contractor, CITY and agencies. b. Construction Assistance: J -U -B's project manager will be available during construction as requested by the CITY. Items that will be included in this portion of the task may include: i. Shop Drawing and Product Data Reviews: J -U -B will review shop drawing and product data submittals for compliance with the design and contract documents. ii. Construction Administration: As requested by the City, J -U -B will assist the City in review of claims, change order and work directive preparation, address questions or RFI's, and other construction administration activities. C. Close-out Procedures: i. J -U -B may conduct a walk through with the City if requested, and prepare a tentative punchlist to supplement the City's RPR list. ii. J -U -B will assist the CITY in the start-up of the pressure sewer and provide consultation start-up procedures at the SBCLS. Task Order 0596.a South Black Cat Pressure Sewer Commissioning Page 4 of 5 JUB ENGINEERS, INC TIME OF COMPLETION and COMPENSATION SCHEDULE The following schedule is based on a Notice to Proceed (NTP) from the City by February 2015 and resulting in Final Design being completed by April 2015. A NTP issued on a different date will change the schedule accordingly. The Not -To -Exceed amount to complete all services listed above for this Task Order No. 0596.a is sixteen thousand eight hundred ninety five dollars ($16,895.00). No compensation will be paid over the Not -to -Exceed amount without prior written approval by the City in the form of a Change Order. The hourly rates for services and direct expenses shall be billed per the approved Rate Schedule and Master Agreement (by this reference made a part hereof) and will be the basis for any additions and/or deletions in services rendered. Travel and meals are excluded from this Task Order unless explicitly listed in the Scope of Services AND Payment Schedule. CITY OF MERIDIAN BY: /' Z' KEIT TT ur/chasing WHager Dated: Department Approval BY: CAI--'-� 0 11��, CLINT DOLSBY, Asst. City En neer Dated: t h y I (S City Project Manager Garrick Nelson JUB ENGINEERS, INC BY: L5V7 I/ V 1 41 LA*A3q 9 bonift Dated:I(W/ I Task Order 0596.a South Black Cat Pressure Sewer Commissioning Page 5 of 5 JUB ENGINEERS, INC COMPENSATION AND COMPLETION SCHEDULE Task Description Due Date Compensation 1 Project Meetings & Administration On-going throughout other tasks. $1,919 2 Final Design Services Completed within 60 calendar days of kickoff meeting $8,342 3 Agency Coordination On-going as required $1,656 4 Bidding and Construction Services Completed as required by City's bidding and contract award dates $4,978 TASK ORDER TOTAL $16,895 The Not -To -Exceed amount to complete all services listed above for this Task Order No. 0596.a is sixteen thousand eight hundred ninety five dollars ($16,895.00). No compensation will be paid over the Not -to -Exceed amount without prior written approval by the City in the form of a Change Order. The hourly rates for services and direct expenses shall be billed per the approved Rate Schedule and Master Agreement (by this reference made a part hereof) and will be the basis for any additions and/or deletions in services rendered. Travel and meals are excluded from this Task Order unless explicitly listed in the Scope of Services AND Payment Schedule. CITY OF MERIDIAN BY: /' Z' KEIT TT ur/chasing WHager Dated: Department Approval BY: CAI--'-� 0 11��, CLINT DOLSBY, Asst. City En neer Dated: t h y I (S City Project Manager Garrick Nelson JUB ENGINEERS, INC BY: L5V7 I/ V 1 41 LA*A3q 9 bonift Dated:I(W/ I Task Order 0596.a South Black Cat Pressure Sewer Commissioning Page 5 of 5 JUB ENGINEERS, INC