HomeMy WebLinkAboutExecuted Task Order 10507.e Strata WWTP Safety Improvements Special InspectionsTASK ORDER NO. 10507.e
Under the
MASTER AGREEMENT FOR PROFESSIONAL SERVICES
BETWEEN
CITY OF MERIDIAN (CITY) AND STRATA (ENGINEER)
This Task Order is made this 3 0 Oday of December, 2014 and entered into by and between the
City of Meridian, a municipal corporation organized under the laws of the State of Idaho,
hereinafter referred to as "City", and accepted by STRATA, hereinafter referred to as "Engineer"
pursuant to the mutual promises, covenant and conditions contained in the Master Agreement
(Category 4a) between the above mentioned parties dated October 1, 2014. The Project Name for
this Task Order 10507.e is as follows:
CITY OF MERIDIAN
MERIDIAN WWTP - SAFETY IMPROVEMENT PROJECT -
SPECIAL INSPECTIONS
PROJECT UNDERSTANDING
We prepared our proposed scope of services and the corresponding fee estimate based on our
review of the project plans prepared by Mountain Waterworks (civil), dated October 6, 2014; and
Axiom (structural), dated October 8, 2014.
We understand the proposed construction will be comprised of the fabrication and installation of
multiple stair and platform assemblies. We also understand that the stair assemblies will be placed
atop existing and new cast -in-place concrete and attached using post -installed fasteners.
SCOPE OF SERVICES
At the time of the preparation of this Proposal, STRATA did not have the opportunity to review the
contractor's construction schedule. Therefore, we are only able to provide a preliminary fee
estimate which may be subject to change due to construction schedule, workforce, weather, or
jurisdictional requirements which cannot be anticipated. We have based our attached Preliminary
Fee Estimate (Attachment A) on certain assumptions; specifically, the quantity of site visits for
various construction aspects which we believe are consistent with current construction practices.
These assumptions are detailed on the corresponding Estimate. We request the opportunity to
review this document as it becomes available, and make appropriate modifications to our
Estimate.
On this project we anticipate STRATA's primary scope of services will consist of the following
activities:
1) Observation and compaction testing during soil improvements, site grading, utility trench backfill
and earthmoving activities.
Task Order 10507.e Meridian WWTP Safely Improvement Project Special Inspections Page 1 of 6
STRATA
2) Special inspection of the placement of reinforcing steel and items embedded in concrete.
3) Sampling and quality control testing of concrete.
4) Special inspection during placement, consolidation, and curing of concrete.
5) Structural steel construction, including special inspection of field and in -shop welding.
6) Special inspection during the installation of post -installed -anchors (chemical epoxy and
expansion type anchors).
7) Sampling and laboratory testing of various construction materials (i.e. concrete, soils,
aggregates, etc.).
SERVICE DESCRIPTION
STRATA has assigned Mr. Don Hill as our Project Manager to provide supervision and technical
oversight of our services. Mr. Hill will be responsible to interact with your designated project
representative to coordinate and schedule our special inspection, field observation and laboratory
testing services. Staff assignment will be dependent on the nature of the testing required. Our
intention is to assign a primary special inspector with multiple certifications and experience that will
provide the majority of the required testing; thereby increasing the continuity, effectiveness and
efficiency of our services. This individual will be supported by other testing professionals as
dictated by the project schedule and testing requirements.
Pre -Construction Meetings
STRATA's Project Manager will attend a pre -construction conference with you, appropriate
subcontractors, and the local jurisdictional agency to review the inspection and materials testing
requirements for the project and to establish report distribution protocol. If requested, we will also
attend subsequent project meetings with the contractor and subcontractors for specific
construction applications (i.e. earthwork, concrete, and structural steel) as you deem necessary.
Earthwork Observation and Testing Services
We will provide field professionals to perform observation and compaction testing services during
site grading, placement and compaction of structural fill, backfilling of utility trenches, soil
improvement activities, placement and compaction of subgrade and aggregate base material.
Compaction testing will generally be performed as required by the project specifications. Our
personnel will sample on-site and imported materials used for backfill and transport these samples
to our laboratory for appropriate testing. These visits will be provided on a periodic basis which will
be coordinated with the contractor's project superintendent.
Special Inspection of the Placement of Reinforcing Steel and Embedded Items
We will provide and International Code Council (ICC) certified special inspectors to verify the
placement of reinforcing steel and embedded items prior to the placement of concrete. Our
inspection of reinforcing steel and embedded items will include verification of type, grade, size,
cleanliness, lap splice, clearance, coverage, general placement of reinforcing steel/embedded
items and conformance with project plans and specifications. Deficiencies will be reported to the
contractor for correction prior to the placement of concrete. If deficiencies are uncorrected, we will
notify you and other designated persons of non-compliant conditions.
Concrete Observation and Testing
We will provide special inspectors certified by the ICC to observe concrete placements and
sampling and field testing. Our field services include testing for slump, temperature (concrete and
Task Order 10507.e Meridian WWTP Safety Improvement Project Special Inspections Page 2 of 6
STRATA
ambient), air content, verification of mix design as indicated on the batch tickets, and fabricating of
compressive strength test specimens, as required by the project specifications. Concrete sampling
and field-testing is conducted by personnel certified by the American Concrete Institute (ACI) as a
Concrete Testing Technician — Field Grade I.
Please refer to the Estimate for anticipated amount of concrete test cylinders on this project. We
have estimated these quantities based on IBC specifications, which require 1 composite sample
and 1 set of compressive strength specimens for every 150 cubic yards (c.y.) placed. We will test 1
concrete compressive strength specimen at 7 days, 3 at 28 days, and a specimen will be held in
reserve pending successful results of the 28 -day tests. STRATA will notify those person(s)
identified by you via telephone should the test results of the 7 -day test achieve less than 70
percent of the specified compressive strength (f c), or if the 28 -day test results do not achieve f c.
Hold specimens will be discarded if the 28 -day tests achieve f c, unless we receive specific
instructions otherwise. Results of concrete compressive strength testing will be distributed via
email to the distribution list established during the pre -construction meeting, unless directed
otherwise.
We based this Proposal on the assumption that compliance testing of other materials (i.e.
aggregates, cement, etc.) will not be required. Therefore, we have not included these activities in
our anticipated scope of services. If it becomes necessary, we can provide these services for an
additional fee.
Structural Steel Field Welding Observation
We will provide special inspectors certified by either the American Welding Society (AWS-CWI) or
ICC to observe welding operations during structural steel erection and connection at the project
location. We accomplish this on a periodic basis as dictated by the approved drawings and
applicable codes. Our services include the observation of welder certifications, material
identification, joint fit -up, pre/post-weld heat treatment, and general compliance of structural steel
construction to the project requirements and applicable codes.
In -shop Structural Steel Fabrication Inspection
STRATA anticipates the need for in -shop structural steel fabrication inspection based on our
review of the project specifications. We will provide a special inspector certified by either the
American Welding Society (AWS-CWI) or ICC to observe the in -shop fabrication process. This will
be done on a periodic/continuous basis as dictated by the approved drawings and applicable
codes. Our services include the observation of welder certifications, material identification, joint fit -
up, pre/post-weld heat treatment, and general compliance of structural steel construction to the
project requirements and applicable codes. STRATA can also provide non-destructive examination
(NDE) ( i.e. PT, MT, UT) of welded connections if required, however we do not anticipate the need
for NDE of welded connections for the in -shop fabrication portion of this project and have not
included this service in our estimated budget.
Post -Installed Anchors (Epoxy/Expansion Anchors)
We will provide an ICC -certified special inspector to observe the installation of reinforcing
steel/anchor bolts using a chemical epoxy, as specified. Our field services will include verification
of the size, depth, spacing, and cleanliness of holes to receive the reinforcing steel/anchor. We will
also verify adherence with the manufacturer's specification for the chemical epoxy anchor. If
required, we can perform pull/load/torque-testing services of reinforcing steel bars/anchor bolts
installed using the above referenced applications as part of our scope of services.
Task Order 10507.e Meridian WWTP Safety Improvement Project Special Inspections Page 3 of 6
STRATA
Laboratory Testing
We anticipate that compliance testing of soil (moisture -density relationship curve, gradation) and
concrete (compressive strength), will be required during construction.
Technical Management & Reports
Our Project Manager reviews the daily field reports generated by our field staff during construction.
Items found in non-compliance with the project requirements are brought to the immediate
attention of the construction superintendent. If the situation is not corrected, we will subsequently
notify the designated design professional and those designated by the client. As re -inspection
items can have a serious impact on our budget, our Project Manager will review the daily field
reports to monitor items requiring re -inspection and the hours involved in these re -inspections.
Upon project completion, we will provide a final summary report to document the materials testing
and special inspection services conducted.
TIME OF COMPLETION and COMPENSATION SCHEDULE
Strata will provide our services on a time -and -expense basis in accordance with the rates
established in the attached Estimate. These rates will remain in effect through the duration of the
project. Overtime for our field staff will incur a 50% per hour increase to our standard rate for time
in excess of 8 hours during one day (Monday through Friday), non-standard construction hours
(before 8:00 AM or after 5:00 PM), and all hours on weekends and holidays. This Proposal
excludes the cost of any equipment (i.e. scaffold, scissor lifts, telescopic booms, ladders, trench
shoring) to gain access to any area requiring inspection or sampling of materials.
In order to better service your project, Strata requests that you please schedule at least 24 hours
in advance of the needed service. Calls for services with less than 8 hours notification may incur a
Short Notice Fee equivalent to an overtime hourly rate. When Strata receives a short notice call,
Strata will apply the overtime rate to all hours the short notice covers. Calls for service that are
cancelled within 2 hours of the scheduled arrival time may incur a charge equivalent to 2 hours at
the regular hourly rate.
Our actual fees charged will be directly affected by the contractor's schedule, performance, work
force, jurisdictional requirements and events which occur during the duration of the project which
cannot always be predicted in advance.
The Not -To -Exceed amount to complete all services listed above for this Task Order No. 10507.e
is four thousand seven hundred twenty two dollars ($4,722.00). No compensation will be paid over
the Not -to -Exceed amount without prior written approval by the City in the form of a Change Order.
Task Order 10507.e Meridian WWTP Safoty Improvement Project Special Inspections Page 4 of 6
STRATA
COMPENSATION AND COMPLETION SCHEDULE
Task
Description
Compensation
1
Earthwork Observation and Testing
$783.00
2
Special Inspection of Concrete Construction
$423.00
3
Special Inspection of Post -Installed Anchors
$678.00
4
Special Inspection of Structural Steel Construction
$1,918.00
5
Project Management and Administration
$920.00
TASK ORDER TOTAL $4,722.00
The Not -To -Exceed amount to complete all services listed above for this Task Order No. 10507.e
is four thousand seven hundred twenty two dollars ($4,722.00). No compensation will be paid over
the Not -to -Exceed amount without prior written approval by the City in the form of a Change Order.
Task Order 10507.e Meridian WWTP Safoty Improvement Project Special Inspections Page 4 of 6
STRATA
The hourly rates for services and direct expenses shall be billed per the approved Rate Schedule
and Master Agreement (by this reference made a part hereof) and will be the basis for any
additions and/or deletions in services rendered. Travel and meals are excluded from this Task
Order unless explicitly listed in the Scope of Services AND Payment Schedule.
CITY OF MERIDIAN
BY: J4_
KEIT ATTS, Pu chasing Manager
Dated:
Department Apprrovval4,
BY: ttmA�
EMILY SKOR, taff Engineer
ST
BY
l_Nz�z.� sr2A—a�,
Dated: 17Cc if 416,F,2- 3'r'1 20 i 4
Task Order 10507.e Meridian WWTP Safety Improvement Project Special Inspections Page 5 of 6
STRATA
67thf"c elr—
ATTACHMENT A
4
s TRa-ra
nior Field Professional - Subgrade Inspection
';ma!" f visit of 4 hour.^ incfudea travef f nia
Id Professional - Soil Density Testing
'imates f visit of 4 hours incArdec travel time
clear Densometer
Id Professional - ObtainfTransport Samples
;mate.- f -;Ie vici! of 2 hours, includes travel time
isture Density Relationship
eage
imah� 3 round tripe of 25 mite.^ each
Special Inspector - Reinforced Concrete
Eatimates f site waits of 4 hours each. includes trav
Feld Professional - ObtairvTransport Samples
Eatimatec f a be wait of 2 hours. i Nudes travel time
Concrete Compressive Strength Cylinders
Estimates f zeta of 5 cybnderc per se!
Mileage
Estimates 2 round tripc of 25 mite.^ each
Meridian WWTP
Safety Improvement Project
Meridian, ID
Quantity Unit @ Rate Totals
and Testing
i
el
hours
:u:
$56 S
4
hours
rim
$49 $
4
tours
ry
S13 $
2
hours
349 $
1
each
5183 $
75
miles
50.58 $
ESTIMATED FEE: $
on of Concrete Construction
4
hours
t^�r
$53 $
bme
hours
$49 $
5
each
r
S17 $
50
miles
1W
50.58 $
ESTIMATED FEE: $
ecial Inspector - Post -Installed Anchors
imales 3 visit.^ of 4 hour: each, includes travel brne
eage
ima!e^ 3 round tny. or 25 nules each
Special Inspection of
?sial Inspector - Structural Steel Welding
;mares 7 visits of 4 hours each rcludec travel time
eage
;mates 7 round trip of 25 mt'es
12
hours $53 $
75
miles +tls 50.58 $
ESTIMATED FEE: $
Structural Steel Construction
25
hours S 365 $
1'8
miles gy SO 58 $
ESTIMATED FEE: $
Project Management and Administration
at Manager 8 each Cw S90 $
at Administrator 4 each @ 345 $
Summary Report 1 each @ 5200 $
Task Order 10507.e Meridian WWTP Safety Improvement Project Special Inspections Page 6 of 6
STRATA
23200
19600
6200
9800
16300
42.00
98
85
28
423.
630
42
679.
1,B20
9a
1,918.
540
180,
200.