Loading...
HomeMy WebLinkAboutMemo from Claiborn Waite04/15/2004 09:59 FAX 2088888854 MERIDIAN P&Z DEPT. + City Clerk 04/14/04 tfED 16:28 FAX 208 884 8002 IInited 011-Mer3dienIdabo @ngirteE!fS ~ SYrV9~tOrS wet S. Teere Avenue j Mer9dlorL Id 83642 ~ ~oB) -298-2699 Far(toe) - BBA-9oo2 FAX Memo i ~ Wendy Kirkpaaidc, Plan0rleir, AAeridian Planning 8 Zoning, t~ Brenc a Cleiborn, PFJMP j oc nmattaa auasart DEVELOPARt?li, t1c tmeer April ta, 2gu4 Roe Sageland pn--ac,FID GraLoage swales @1001 X001 `' ~ . ,ECE~VEI~ APR 1.5 2004 City Of bleridiar,. City Clerk Office tnfenay, y q pl np regarding our need to revge the Sagelend Per your call lode and re uest, ease mferto the fdllowi ~ PD plans io utfi'ize the new ACl1D roadside drainage Swale altemative. i • Our development improvement plans were suDmiOed to ACHD ~orthelr review on February 23, 2004 and review mmmems mere received March 25, 21104. These review rarrnrtenls spedfiraly addressed the sformwffier drainage system and do not allow using the stortnvrater pond with lift station for ofE•site d'eschaige_ i • My 4ierd and I tetprested a meeting with ACRD to review their 4atemrination and dtl so On April 1.2064. Attha[ mewing, ACHD personnel confirmed that the ACHD drainage poGoy does not allow the pumping systems for stafmwater faeildres as designed for Sageland due to existing topography. i • During this meeling and white teviewiRq mnditi0ns existing (tapographie limitations and high gmundwatet} on the Sageland site, ACHD offered and rerammended that we investigate using their n~ly adopted Roadside IMitbation Swale as a drainage des~n allemalhre. Thi3 design altemative w3S only adopted by me ACHD Commission on FeDnrery 25.2004. ~r~~4 Folbwntg this meeting and tltekrnaetirrg wYlt you and l3nrce FtecldeWn, Meridian DPW, we evaluated this design alternative and have redesigned Sagelarid to utilize the ACRD Drainage Swale allemaive and intend w submit plans forihe Cr~r and ACHO review shortly. After eonstrlYurg with the Project Geotechnical F_ngineer, ACHD, and altemative i;,1hF~'olution for Sageland stormwatet drainage. doiborn ufoits consulting, Ilc City of Meriden we believe this APR 15 '04 11=12 2088886854 PAGE.01