HomeMy WebLinkAboutRaising Angles Hydrological Assessment Report Raising Daycare City of Meridian, Ada County, Idaho HYDROLOGICAL ASSESSMENT REPORT Prepared For: Engineered Structures Inc Boise, ID Prepared By: LEI ENGINEERS SURVEYORS PLANNERS 3023 E. Copper Point Dr. #201 Meridian, ID 83642 Scott Sherrow, PE Date: December 17, 2013 LEI I SURE F;g Raising Angles Daycare Hydrological Assessment Report I. Raising Angles Daycare INTRODUCTION 1 GENERAL PROJECT DESCRIPTION 1 PROJECT DESIGN CONCEPTS 1 HYDRAULIC ASSUMPTIONS: 2 POST DEVELOPMENT CONDITIONS 2 Table 1 —Basin Characteristics Summary 2 Table 2—Storm Water Summary 3 STORMWATER FACILITIES 3 SEEPAGE BED 3 Table 3—Seepage Bed Summary 3 ROADSIDE SWALE 4 Table 4—Roadside Swale Summary 4 OIL/SEDIMENT VAULTS 4 II. Tab 1: Drawing Documents Post Development Drainage Maps Grading & Drainage Plan III. Tab 2: Calculations, Spreadsheets and Computer Model Output DA#1- Seepage Bed —Volume and Flow DA#2- Seepage Bed —Volume and Flow DA#3- Roadside Swale —Volume and Flow IV. Tab 3: Engineering Support Documentation Strata's Geotechnical Report—August 14, 2013 Page 0 Project No. 13-30227—Raising Angles Daycare—Meridian- Hydrological Assessment Report LEI•E.3023 Copper Point Dr.•Meridian,ID 83642• P:208.846.9600 LEI I SUR E OR S PI P I. Raising Angles Daycare INTRODUCTION The Raising Angles Daycare project is situated within the City of Meridian, Ada County, being located in the southwest corner of the intersection of E. Pine Ave. and N. Nola Road. ESI is proposing to develop a +-5,000 sf building on approximately 0.94 acres. The purpose of this report is to determine the hydrologic impacts that the proposed development may have on the existing runoff patterns and flow characteristic from the site. This hydrological assessment was completed after review of the following information: The past development plans, topographic and boundary map information; historical storm data (Ada County); available SCS soil maps; and the Geotechnical Engineering Report prepared by Strata, Inc. This data was then analyzed with the Rational Method utilizing a computer modeling spreadsheet for the drainage basins. This program provides information on storm runoff volumes, peak rate of discharge, and storage design storage volume requirements. Design recommendations are based on the results of the analysis. GENERAL PROJECT DESCRIPTION The site is bounded on the north by E. Pine Ave., to the south by Oak Harbor Freight Line facilities, to the east by N. Nola Road and to the west by plated lots. Ground cover consists of bare dirt to light field grasses. PROJECT DESIGN CONCEPTS Storm water runoff from the portions of the building roof surface and hard scape areas will be conveyed to oil/sedimentation vaults and to the proposed infiltration facilities. Portion of the roof system and landscape areas not subject to vehicular traffic may be conveyed to depressed areas within the landscaped areas. The proposed entry road to be constructed on the adjacent lot to the east of the project site will drain to a temporary roadside swale. For additional information on the drainage basin locations and limits, refer to the drainage basin maps located in Tab 1 of this report. On-site storm water improvements for the project will consist of curb and gutters, catch basins, manholes, storm water conveyance pipelines, roadside swale, oil/sedimentation vaults (pretreatment water quality structure) and the infiltration facilities. Stormwater utility improvements provided for the project will be in accordance with ACHD's Storm Water Management Manual, and per ACHD's storm water management policies as amended by the City of Meridian. The infiltration facilities will consist of underground seepage beds and a roadside swale. For the purpose of hydrological analysis and for computer modeling of the Raising Angles Daycare project, the following basin conditions were modeled utilizing an Excel Spreadsheet Seepage Beds+ Post-Development runoff - 100 yr event to determine storage and infiltration requirements and the 25 yr event to determine conveyance system sizing requirements, Rational Method Runoff. Page 1 Project No. 13-30227—Raising Angles Daycare—Meridian- Hydrological Assessment Report LEI•E.3023 Copper Point Dr.•Meridian,ID 83642• P:208.846.9600 LEI HYDRAULIC ASSUMPTIONS: LEI utilized the following assumptions in establishing the post-development stormwater runoff conditions for the proposed Raising Angles Daycare project hydrological assessment/report: Runoff Evaluation Method: A spreadsheet program based on the Rational Method was utilized. The following Items were reviewed: • Established values from the Intensity-Duration-Frequency Curve Chart for the Boise area from the ACHD's Storm Water Management Manual • The 100-yr storm event with 60 minute duration was evaluated to determine the developed runoff volume. • Existing site conditions • Drainage patterns Runoff Coefficient"C": Per Section 8012.2.1 ACHD's Storm Water Management Manual, C values were chosen. C=0.95, which represents the asphalt paving was used and a value of C = 0.2,which represents landscape areas. Rainfall Intensity "I": I values, are determined from the Intensity-Duration-Frequency's listed in Section 8202.1 ACHD's Storm Water Management Manual. Time to Concentration "Tc": Tc values are calculated for each basin using the FAA Method (Used by City of Boise). This method analyzes the combination of sheet flow, shallow concentrated flow, and channel flow characteristics associated for each drainage basin to arrive at an overall time which represents the length of time required for a particle of water to flow hydraulically from the most distant point in the watershed to the outlet or design point. The minimum value of 10 minutes was used in the analysis. POST DEVELOPMENT CONDITIONS Computer modeling of the design storm for the post-development condition of the Raising Angles Daycare project utilizing the Rational Method produced the following results, see Table 1&2: Table 1 —Basin Characteristics Summary Basin Area Impervious Pervious I Avg. Runoff Coeff. (Acres) (Acres) (Acres) DA#1 0.54 0.34 0.20 0.69 DA#2 0.41 0.16 0.25 0.52 DA#3 0.10 0.10 0.00 0.95 See computer spreadsheets Tab 2 for details. Page 2 Project No. 13-30227—Raising Angles Daycare—Meridian- Hydrological Assessment Report LEI:'3023 E.Copper Point Dr.•Meridian,ID 83642• P:208.846.9600 LEI Table 2—Storm Water Summary Basin Flow Rate Flow Rate Storage (Q25) (Q100) 100 yr Vol. Time of Conc. (cfs) (cfs) (cu-ft) (min) DA#1 0.88 1.15 1,767 10.00 DA#2 0.50 0.66 1,013 10.00 DA#3 0.22 0.29 440 10.00 See computer spreadsheets Tab 2 for details. STORMWATER FACILITIES The stormwater disposal systems are designed to contain the 100-year storm event. The location and parameters of the seepage bed facilities have been detailed in the construction plans. Construction plans for the sheets relating to the storm water seepage beds have been included in the Tab 1 of this report. Storm water from surface runoff and the building will ultimately be conveyed either to the infiltration facilities or retained on site within the landscape areas. The storm water infiltration facilities will be configured in accordance with the general guidelines published by ACHD associated with storm water treatment/retention/infiltration and in accordance with ACHD's storm water management policies as amended by the City of Meridian. A typical oil/sedimentation vault has been designed into the stormwater system to provide water quality treatment of the flowrate of run-off associated with the 100 yr storm event before discharging into the seepage/infiltration beds. Secondary water quality treatment is provided by maintaining a three foot separation between the bottom of the facilities and the seasonal high ground water elevation. SEEPAGE BED The seepage beds for the Raising Angles Daycare project have been designed to fully contain the 100- year storm event. For the design of seepage beds, Strata's Geotechnical Report was referenced to determine soil characteristics & infiltration rates to size the seepage beds and to determine depth to bedrock. Using the data from the computer modeling spreadsheet and geotechnical reports recommended infiltration rates, the required storage volume for the seepage bed was determined. A void space (e) of 40% was assumed and used to size the seepage beds. The Table 3 summarizes seepage beds sizing results. Table 3—Seepage Bed Summary I Seepage dge I Width Length Depth Infiltration Actual Rate Storage (ft.) (ft.) (ft.) (in/hr) (cu.ft.) DA#1 15 50 6 8 1,800 DA#2 15 30 6 8 1,080 See computer spreadsheets Tab 2 for details Page 3 Project No. 13-30227—Raising Angles Daycare—Meridian- Hydrological Assessment Report LEI:•3023 E.Copper Point Dr.•Meridian.ID 83649• P:208.846.9600 LEI ROADSIDE SWALE The temporary roadside swale providing storm water management for the entry road for the Raising Angles Daycare project was designed to fully contain the 100-year storm event. Strata's Geotechnical Report was referenced to determine soil characteristics & infiltration rates to size the facility and to determine depth to bedrock. Using the data from the computer modeling spreadsheet and geotechnical reports recommended infiltration rates, the required storage volume for the roadside swale was determined. A minimum or 6" of freeboard is provided above the 100 yr ponding elevation. The Table 4 summarizes roadside swale sizing results. Table 4— Roadside Swale Summary BTM. Side Infiltration Actual Swale Width Length Slope Depth Rate Storage* (ft.) (ft.) (ft.) (in/hr) (cu.ft.) DA#3 3 62 4 1 8 478 See computer spreadsheets Tab 2 for details OIL/SEDIMENT VAULTS The project's oil/sediment vaults will sized per ACHD's Storm Drain Policy Manual (page 8200-21). ACHD's Storm Drain Policy Manual specifies the maximum allowable flow through 1000 gallon trap with 20"baffle to be 3.33 cfs. The maximum flow off the site's drainage basins is 1.15 cfs for the 100 year event. Therefore 1000 gallon trap with 20"baffle spacing will be used. Page 4 Project No. 13-30227—Raising Angles Daycare—Meridian- Hydrological Assessment Report LEI:•3023 E.Copper Point Dr.•Meridian,ID 83642• P:208.846.9600 TAB 1 DRAWING DOCUMENTS a 133NS 113AOO 0H WcWt-'1 3b Phial aaI rw Z � ZJ =_ ffi3 ti. .;`—:' Y oxvai'xaaaw E I Va ; ¢ s Ib . � 1W wa Ztt 3111/0AVO S31ONV ONISIVII .. _ . .. 9 El i qg N 2 L y, 2 O CD a B} 1ml I 1 11 1 1 0811/ i y§i; I IS >, �. 330 of 1 iR'1 00 ' a1a Ii I II f III 4 Cm !iIgytH IISCD -o !11 of i ;t 1i;. I I J` � • ' i 1 0' CU 1 0,,, 1 P p W 4j 4 —� 'W' 2�li i `','i ! 1 I 1 I I I A ¢ �"C .� gg o y "€ z ly U kk W 'snaaa n g[ 1 LV11— _ UVU2I VlON 'N 1111 A9 E se1g.01100t i • '(r —i _ e __- -- zuz m )) .g..z. ga / I r�/111 11 r 1-1-11—.._r L sew. ,` I. +—i+ — #g q sI I I I I I Z .I stz ga11€11I$€S iN!j j ! i 1 I_:h If8�!3�t 000+++���r �, s ►1m 1...ps MI! l' . w s N AR 0', w- j' — q < Z y * i �i R11 / ill o E o, 1'Fir• ffi �l w }' ( let �4' Q 1 _ 2 /4• , � 1, ; vA11 _.....:6, ,."1 t 74-44 1 ii I I- c' .r1. 1 $' -- I 'II F Stlf Illm' I I; "II ,I , IIR _ I I NVld 301/NIVUO ONY Decay's° o _411:'s A w V2 ,az,-,g1 tt S :.-_, 121,110!,10i .4: -,,,,._t 011100110/1011131/1 ' 6 6 n• .1.7,NE 44,, 3111V3AVOI S319NV ONISIVN i _ . Z a 1 0 r...: F a 1 - ' i . ili I Ce i I-- oi- 0 I 1 i 4! w : 1 ifd 6rg .1 CO '11.1 li • Wil " INg )s Z ° klg R kil 11 ! '114:'1 2 0 s 2 1 :1, k1 1 - 1 . ,,,•! ; g 11 11-1 1 ,, t ! • Vt . • Of : Oiling' t C.) (3 • A, 1 t). olq :, , ilyip ;,, Iiipttili • CC F. a rigm 77 E IP 1, 11;ii , i iii! 03; u .;I , .1L,g i e A.4k 0 kW ',.. libk ! W WWWW ] 1 L 1 1 I CP/011 V1ON 'NI V, a I ------ -g - . - - 1 ---;,= 7--..'" T,•ei'''''-''''''''' I _._) 1 I / ilif' ,„; f : 1 I f i 1 i °'" ' rktmemeese.,....moncgiNom_frAr—wor,g-3*-4',..t4 r: 4 1 ,e,,, 1 _ mutooviztostaismi 1p 21.40.4%. ,, ,, ., ,7.,.. SI 1 ii CM. Priff. 0101:414 •;, A „ I I w t 14 .-- ME, \ ,1'1;7' , 12 1[ 11 i z 11 1 1 1' :I \ -2 g`,',,' ,,,' , :? 1 '1, I rj ,., ' , I i ,z It' . l' ,. ' , / 4')i I ' ; I I I,_ ri,,,,,, 41550411i111M111111',.. "/ I , 1 so—s. —9r 1 ; _ , Iii; 1 1 SF, • - , , 1 I ///till,1 r,1 I 2,0 \ • 'Z'''' , I f ,70 / iVH1 i A , - , — ' r erzu 3.0v.z.00w , 0 0 I I / N .II , / _,--- I , , , ; / ___--- I I / i 1 1 1 't,,'ii (----_- I , ,1,E . II / ,:, ii '''. .' .., I fill . tr., I „ g..7., I 1 I ,I c2L op _ 1 . 4 N - I l' il I III I _ r .. h •,. ,L.I 1,-,,,,, nAid i -----, - -,,, , I 1.4 ir . L ,,,IL, I, r ii,ii;,'., , Ii . II R 14 R. , I I i i 1---- . 71 L., N '--' % I I f 1 I I I I I I i 11 , 1 i I ! I 1 I 1 I I I I i TAB 2 CALCULATIONS SPREADSHEETS COMPUTER MODEL OUTPUT Raising Angles Daycare:Storage Volume and Pond Sizing Calculations Basin# DA#1 Seepage Bed# 1 Ste• 1:Wei•hted Coefficient of Runoff for Areas Contributin s to See.a:e B Building Area 0.00 0.95 0ed Building/Parking Area/Sidewalk 0.34 0.95 0.3211 0.25 0.05 Landscape Area 0.2 0.54 0.3711 I Cw= 0.69 I Ste 2:Time to Concentration* nr .z. Runoff Flow Length 0 )00.005 0.00 10.00 *Tc was computed with the Kirpitch Method:Tc=.0078(L77(Sa„9) -°.385 **Per ACHD min.Tc allowed shall be 10 minutes Ste• 3:Peak Dischar•e for Prima Conveyance S stems Drainin.Y •e to See•a Bed - Seepage Bed 0.69 2-Year 10.00 1.21 0.54 0.45 0.69 25-Year 10.00 2.37 0.54 0.88 0.69 100-Year 10.00 3.11 0.54 1.15 *Intensity based of Tc(from step 2)and a Storm Interval of 100 years. **Peak Flow Calculation is based on ACRD requirements for Primary Conveyance in an urban area setting. Step 4:Calculate Storage Volume(VS)Contributing to Seepage Bed Seepage Bed 0.69 100-year 1.15 1 0.54 1766.81 *Intensity based on duration of one hour and a storm interval of 100 years. **Storage Volume Calculation = V=(CiA(3600))*1.15,Tc=60min, 15%Sed Storage Volume Step 5:Calculate Seepage Bed Dimensions and Storage Volume Provided(V,) Seepage Bed 50 15 6 40 1800 OK Step 6:Calculate Storage Volume(V5)Requirements of Seepage Bed Seepage Bed 4 750.00 8.00 500.00 3.18 *Drain per hour in Cu.Ft./Hr=Area*IR/12 **Hours to completely Drain=(0.90*Req'd volume)/Drain per hour Raising Angles Daycare:Storage Volume and Pond Sizing Calculations Basin# DA#2 Seepage Bed# 2 Ste• 1:Wei hted Coefficient of Runoff for Areas Contributin, to See•a,e Bed Building Area 0.00 0.95 0 Building/Parking Area/Sidewalk 0.16 0.95 0.1501 Landscape Area 0.25 0.25 0.0625 0.41 0.2126 I Cw= 0.52 Ste• 2:Time to Concentration* Runoff Flow Length 0 0.005 0.00 10.00 *Tc was computed with the Kirpitch Method:Tc=.0078(L)'77(Savg)-°385 **Per ACHD min.Tc allowed shall be 10 minutes Ste. 3:Peak Dischar.e for Prima Conve ance S stems Drainin. toSee.a.eBed Seepage Bed 0.52 2-Year 10.00 1.21 0.41 0.26 0.52 25-Year 10.00 2.37 0.41 0.50 0.52 100-Year 10.00 3.11 0.41 0.66 *Intensity based of Tc(from step 2)and a Storm Interval of 100 years. **Peak Flow Calculation is based on ACHD requirements for Primary Conveyance in an urban area setting. Step 4:Calculate Storage Volume(Vs)Contributing to Seepage Bed b a . s Seepage Bed 0.52 100-year 1.15 1 0.41 1012.19 *Intensity based on duration of one hour and a storm interval of 100 years. **Storage Volume Calculation = V=(CiA(3600))*1.15,Tc=60min, 15%Sed Storage Volume Step 5:Calculate Seepage Bed Dimensions and Storage Volume Provided(Vs) Seepa.a Bed 30 15 6 40 1080 OK Step 6:Calculate Storage Volume(Vs)Requirements of Seepage Bed Seepage Bed 450.00 8.00 300.00 3.04 *Drain per hour in Cu.Ft./Hr=Area*IR/12 **Hours to completely Drain=(0.90*Req'd volume)/Drain per hour Raising Angles Daycare:Storage Volume and Pond Sizing Calculations Basin# DA#3 Pond# Ste• 1:Wei,hted Coefficient of Runoff for Areas Contributin• to See•a•e Bed : 1-A,-::::-A- -fi' Building Area 0.00 0.95 0 Parking Area/Sidewalk (Hardscape) 0.10 0.95 0.09215 Landscapee Area 0 0.25 0 0.10 0.09215 I Cw= 0.95 I Ste• 2:Time to Concentration* -i ' a: ' � ri" '- ,ate,: ' „ ; ,, Runoff Flow Length 0 0.005 0.00 10.00 *Tc was computed with the Kirpitch Method:Tc=.0078(L)'"(San)-8 385 **Per ACHD min.Tc allowed shall be 10 minutes Ste 3:Peak Dischar.e for Prima Conve ance S stems Dramin• to Pond Pond 0.95 2-Year 10.00 1.21 0.10 0.11 0.95 25-Year 10.00 2.37 0.10 0.22 0.95 100-Year 10.00 3.11 0.10 0.29 *Intensity based of Tc(from step 2)and a Storm Interval of 100 years. **Peak Flow Calculation is based on ACHD requirements for Primary Conveyance in an urban area setting. Step 4:Calculate Storage Volume(V,)Contributing to Pond Pond 0.95 NNW= 0.34 WQ*** 0.10 N/A 0.95 100- ear 1.15 1 0.10 439 *Intensity based on duration of one hour and a storm interval of 100 years. **Storage Volume Calculation = V=(CiA(3600))*1.15,Tc=60min, 15%Sed Storage Volume ***lps 0.34"at Boise Airport-80th Percentile Storm Step 5:Calculate Pond Dimensions and Storage Volume Provided(V) • • ,..?, a ",.i " :ro ,.. WQ-Pond 0 0 0 0 0 FAIL 100 yr Pond One Cell 62 3 1 4 478 OK *Calculation of Vp(Storage Volume Provided)subtracts 1-feet of depth,and subsequent storage volume, of seepage bed for freeboard per ACHD requirements. Step 6:Calculate Storage Volume(Vs)Requirements of Pond s. A • -- ; A rf ,'. . o WQ-Pond 0.00 80.00 0.00 #DIV/0! 100 yr Pond One Cell 30.00 8.00 20.00 11 *Drain per hour in Cu.Ft./Hr=Area*IR/12 **Hours to completely Drain=(0.90*Req'd volume)/Drain per hour