Loading...
HomeMy WebLinkAboutConnections Credit Union Fall Storm Drainage Calculations Connections Credit Union Ten Mile Road Branch - Meridian, Idaho Storm Drainage Calculations (Addendum 10-14-14) Y•T �'F, (', 10{1411 4, cps rF oF ote. s K ER\C* Fall 2014 erickson civil I i I I z O CSII I— Q et J I I . '•• E V vx cvv vvv v :v vv• .vv v y' •vv - ' y. • . , •vvv � , \ \ .\•, v vv' vvv vvv ,` vv Ivv v� Z v y` v ,"t . \ ,.� vvv ���, \ •v � • • rvv 1 vvv i-. •� vv: .\. !4. ,_ vvv yvv vvv *� , v , yvI vv, ,� ;' .1 i \ LV p W II \ \ \\ \, \ t vvv , e g z •vv ;vv vv vv ,v vv • \ I - Z L. W \LI •\ \\ -.I•\•\\ \ `z \ I 1,,f \ k A v v 1 v v y v - c v A A ' �.v v v v. \s a ' I, • vvv vvyv s•vy • •5:", 'vv x } vv vvvv l.vy vyv vv vnv vvv . n. vA �vva y -vAv vvv . ' •\v•v v v v-v # v v v v c 0 V A • \> vv PCA :, vvv r vvv vyv v vvv � v v v: v v. y.A vv v. P cvv Vvv- vvv � • v a y a s v v \) \ vvvv `c vvy yyvv �` , v vv ay, x II \s. '`v\ y\`\ • \ a s ,<\\\ • CO OC 0. V '.\\ \ \\\i \\\ _ \\\ v v ••• v v •v• S v c•y v v v v v v a,' • >„\ ?+ xx,•„ ` \\,\ se\ \\\\ --h••, \\\\ A •A ')?'b 'AV A•a c i� -A A A . A •V A A Y to • o • �q V a•A 00 � MtZti `:• Pr. zel” Z � i tis t to \ \•\ • • 5 pg /Q lo'inns \ \ • W Bis t� V x• x• 1 I'\ \ \\ !, v\\ \\\\ \\\ v v v v v y v v v v v v v v v y \\ • \\ a0�. \ ,C I \\ \\\ • \,.2,,,_______,_,.._.‘ \.\\ '. •\\ \\ --\ ,, I I Basin-5 Pretreatment: 1000 gallon sand and grease trap Storage: Infiltration Gallery #1 C-Value Roof 2115 Sq. Ft. 0.95 Concrete&Asphalt 13007 Sq. Ft. 0.95 Landscape 1169 Sq. Ft. 0.15 Not Used 0 Sq. Ft. 0 Total Area 16,291 Sq. Ft. Run Off Coefficient 0.89 Basin Length: 133 feet Delta Z: 1.65 ft Average Basin Slope: 1.24 % Time of Concentration: 10.00 min Intensity(WQ Event) 0.34 in/hr Qp(WQ): 0.11 cfs Intensity(2-year): 1.0 in/hr Qp (2-year): 0.34 cfs Intensity(25-year): 2.5 in/hr Qp (25-year): 0.83 cfs Intensity(50-year): 2.8 in/hr Qp (50-year): 0.92 cfs Intensity(100-year): 3.2 in/hr Qp(100-yr): 1.06 cfs Sand & Grease Trap Throat Velocity The target throat velocity design value is 0.5 ft/sec through the baffles of the S&G trap for the 2-year water quality design storm. 1000 GAL AREA= 8 SF Baffle/Box Width = 48 inches Throat Width = 24 inches 1500 GAL AREA= 10.42 SF DB-350 Baffle/Box Width = 62.5 inches 41 inches Baffle Spacing = 24 inches 5 inches 2-Year WQ EVENT(0.34") 100-Year Throat Qp Throat Vel Qp Throat Vel Throat Vel SIZE Structure Area SF CFS ft/sec CFS ft/sec Qp ft/sec 1000 SG-1 8.00 0.34 0.04 0.11 1.06 0.13 All of the S&G trap throat velocities are near or below the 0.5 ft/sec guideline. f , (Basin#5) Infiltration Gallery No. 1 CONNECTIONS CREDIT UNION TEN MILE ROAD BRANCH Storm Drain Infiltration Trench Sizing 100-Year Recurrance Interval Using ITD Zone A Chart Interpolated For A 100 Year Storm C-Value Roof 2115 Sq.Ft. 0.95 Concrete&Asphalt 13007 Sq. Ft. 0.95 Landscape 1169 Sq.Ft. 0.2 NOT USED 0 Sq.Ft. 0 Total Area 16291 Sq.Ft. Run Off Coefficient 0.90 Bed Length*** 62 Ft. Bed Width 14 Ft. Bed Depth 3 Ft. Percolation Rate 8 In./Hr. Include Percolation Credit for Desig y (Y/N) Predevelopment Discharge Rate 0 CFS(for 1-hour storm) Storm Storm Run Off Run Off Percolation Storage Duration Intensity Rate Volume Volume Required in/hr cfs ft3 ft3 ft3) 5 Min. 4.38 1.46801 440 17 424 30 = 1.73 0.57983 1,044 101 942 1 Hr. 1.06 0.35527 1,279 203 1,076 2 = 0.61 0.20445 1,472 405 1,067 6 Hr. 0.26-_- 0.08714 1,882 1,216 666 12 Hr. 0.150 0.05027 2,172 2,432 260 24 Hr. 0.081 0.02715 2,346 4,864 (2;518 Drain Bed Voids 40 % 18"Pipe Volume 1.77 Cu. Ft./Ft. Bed Storage Volume 17.86 Cu. Ft./Ft. Stormwater Volume 1,076 Cu. Ft. Required Seepage Bed Volume 1,076 Cu.Ft. Increase 0% 0 Cu.Ft. Total 1,076 Seepage Bed Storage Volume 1,107 Cu.Ft. Swale Storage Volume 0 Cu. Ft. Pre-Development Discharge Volume 0 Cu. Ft. Total Storage Available 1,107 Cu.Ft. Perc Volume Per Hour 202.7 cuft/hr Time to infiltrate 90%of the design storm= 5.3 hours * Rational Formula Q=CiA ** Percolation Area=2/3 of trench wall height along bed perimeter(excluding freeboard) INFILTRATION GALLERY-1.xls 7/31/2014