HomeMy WebLinkAboutChange Order No. 1 to Task Order 10461 with SPF Engineering for Well 29 Water Test Well DesignCITY OF MERIDIAN CHANGE ORDER NO. 1
33 EAST BROADWAY PROJECT NO. 10451
MERIDIAN, ID 63642 DATE; 3/4/15
EFFECTIVE DATE: $/1115
CONTRACT CHANGE ORDER
NTRACTOR: SPF Engineering
PPR0JECT,
Well 1129 Water Test Well (Design)
Contractor Is hereby directed to make the f0110WIng changes from the Contract Documents and Plana.
Description: Adding "Services During Construction to the current task order.
Reason for change order: These required services were not a part of the original task order
Attachments: Change Order Request memo from SPF Engineering dated February 17, 2015.
CHANGE IN TASK ORDER PRICE:
CHANGE IN TASK ORDER TIMES:
Original Contract Price $ 75,000.00
Original ContractTimes; _ Calender Days
Net changes from previous Change Orders
Net changes from previous Change Orders
No._ to _
No._ to _ (ralandar days)
$0.00
0
Contract Price Prior to this Change Order: Contract Times prior to this Change Order:
(calendardays)
$75,000.00
Net Increase (decrease) of this Change Order: Net Increase (decrease) of this Change Order:
(ralendardays
$35,500.00
Contract Price with all Approved Change Orders:
Contract Times with all Approved Change Orders:
(calendar days)
$110,500.00
RECOMMENDED: (PROJECT MANAGER) -n.6
A o�"
�"
aQ'(iP�TED„(SPF Engineering)
'h.<'`,
By: Brent Blake ' -
3 _5 'ZQ /5
By: Te* 6ca n
Date: 01
Dale: 3/1//.7d
J" F rj'-
APPROVED: (CITY PURCHASING MANA R)
APPROV L�
yygj��
C
By: Keith Wafts /� r""'' r, SE,
rFq
jDats: ' r 1/
3 !0/( l
Data. 3 S s
APPROVED: (Cl an Cy -f— .:.'..y=.-'=�.'ATTEST:
c,c,� P,aweta, Cla,r. Zr �+ r
By: Msyer3ama de•WeBrtf
By: City Clark, Jaycee Holman
Date; g.1, o L
Data: 3110 r f
SPF WATER
ENGINEERING
February 17, 2015
Brent Blake
City of Meridian Public Works Department
33 East Broadway Avenue, Suite 200
Meridian, ID 83642-2300
Sent via email to bblakell�meridiencliv.dro
Subject: Budget Update — Test and Production Well 29 Design, PermlfNng, and
Construction Management
Dear Brent
This letter serves to provide an update on our budget for the Test and Production Well 29
project. The original project budget from our proposal dated October 25, 2013 totaled
$75,000, and included $34,000 for Subtasks 1 through 4 associated with the test well. A
budget breakdown was provided In the proposal and the budgeted amounts are listed below
In Table 1. The work completed to date Includes the water right permit, test well design, teat
well bidding and permitting, test well borehole drilling to 1,000 feet, geophysical logging and
final design, and construction and development of the Zone 1 and 2 wells.
Table 1. Budget vs Invoice Comparison
Subleak
Budget
Amount
Invoiced
Amount
Work Com ate
1. Wafer RightPemtxAmendment
2. ToWei
000
$6,000
$3000
$7,000
waterdailL misoctrujilutg@nnitm
design memo, well design, specs,
SSCP
it Ted Well Bidding, PemJltlng,
Construction Lob fees
$20000
a. Bid recon
$2,000
bid and n mea d notes
b. Conetrudlorr 10/16-11/20
$4.000
aIle prop, Install surface caft, dg mob
o. Construction 11/20.12x9
000
well ddIllng. water gushy samplina
d. Construction 12/10.12111
$2,50D
neoph0call toggling. final well de lailan
St. Construction 12/12-12131
K0110
bottom east Zone 1 construction
I. Construction 1/1-1/1814.000
Zone 2construction
Tramiel pipe lose 1/211.1128
$2.500
site via0, meetin s vAlh City
h. Completion of well 2/3
0
elle visit
I. Oevelo 2/13
11000
site visit coordination MIT C
4. Test Wei FinalRe
$6000
S0
Toil for Subbsks 1 4
$ 000
sagoo
For Subtaske 1 (water right permit) and 2 (test well design), the budget and Invoiced
amounts are comparable. The $1,000 exceedance for Sublask 2 can primarily be attributed
to preparation of the ESCP and associated work items that were not Included In the original
e. Mallard Brr,e, Suite 350, Boise. Idaho 63606 Tali 206-363-4140 Fui 206-363-4156
Brent Blake February 17, 2015
proJect Scope, For Sublask 3, SPF will have Invoiced approximately $32,000 through
January 31, 2015 with an additional $1,500 of fees Incurred through February 13 for a total of
$33,500. The budget amount for Subtask 3 is $20,000, which Includes $3,000 for laboratory
fees. We have therefore exceeded the labor budget amount of $17,000 for Subtask 3 by
$18,500. The December 2014 and January 2015 Invoices are attached. The February 2015
Invoice will be sent to the City at the end of February.
We developed the Subtask 3 budget based on 17 days of oversight of construction and
testing: 6 days of drilling/geophysical logging, 8 days for well construction, and 3 days for
development and sampling. Based on our experience with other test wells for Meridian and
Nampa, this construction timeline seemed reasonable. To date we have 30 days In the field
plus numerous shorter visits to check on progress and office time to prepare field reports and
coordinate with the contractor. We have prepared more than 40 daily reports. Project delays
have resulted from difficulties In constructing the well, muddy site conditions, equipment
problems, and lose of a tremle pipe down the borehole.
A second test well Is planned due to the loss of the tremae pipe In the first well. Up to seven
teat well tubes will be Installed In this second well. We anticipate 20 days for oonstruatlon
and testing of this second well: 6 days of drilling/geophysical logging, 10 days for well
construction, and 4 days for development and sampling. Our labor costs are anOcipated to
be $18,000. This estimate assumes on-a@e oversight during all construction to promote
project success and efficient project completion. Alternatively, we can reduce our on-site
presence and associated fees at the request of the City. Lab fees and the final well
completion report will be covered under our original scope.
To summarize, we are requesting a budget Increase of $35,500 to cover additional labor
associated with delays on the first test well and for construction and testing of the second
well. Please let us know if you have any questions regarding this request. The December
2014 and January 2015 Invoices are attached.
Respectfully submitted,
SPF WATER ENGINEERING, LLC
Bye
Terry M , 'REP.G.
Manager
By c=;;e. IV
Jason W. Thompson, P.E.
Project Engineer
Page 2
Z
Q
m
we
LL
U
m
r
H n LLI
a.
0.
W Cl)
O
WQ
Cq
U' Z
y >