Loading...
HomeMy WebLinkAboutAJ Inc. Drainage CalculationsWHPacific DRAINAGE CALCULATIONS FOR NEW BUILDING, AJ INC. MERIDIAN, IDAHO DECEMBER 2014 3130 SOUTH OWYHEE STREET - BOISE, IDAHO - 83705 PHONE: (208) 342-5400 FAX: (208) 342-5353 DRAINAGE CALCULATION SUMMARY Project: New Building - AJ Inc. Project #: 0005917W Date: 12/12/2014 The stormwater runoff on the project site will be collected and treated via sand/ grease traps. The stormwater will then be treated by sand filtration prior to discharging into the receiving soils. The runoff was calculated using a 100yr, 1 h design storm (1" runoff), for volume and a 50 yr storm for sizing the sand/ grease traps. The "c" value used in calculating the runoff is based upon the hardscape due to the lack of landscaping draining to the system. Roof runoff from the building is assumed to drain to the system. SYSTEM AREA "C" Value 1 20, 970.00 0.9 2 57;490.00 0.9 3 2,870.00 DrnCalcs-AJ Building.xls Summary 0.9 4 20, 890.00 0.9 DrnCalcs-AJ Building.xls Summary New Building - AJ Inc. Drainaqe Area # 1 C value: 0.90 Initial Trench Volume = 1 in x (Area (ac) x 43560cu.ft./ac) x 1ft./12in. x "C" Volume = 1572.75 cu. ft. Req'd Storage Vol. = 1573 ft' Trench Dimensions = 8 Depth (ft) 10 Width (ft) 42 Length (ft) Storage/ft = (Vr)(D)(W) D = 8 ft Depth = 32 ft2 W= 10 ft Width Bottom Perc/ft = (W)(Pr)(1ft/12") Vr = 40 % Drain Rock Void Ratio = 6.67 ft2 Pr = 8 in./hr Percolation Rate Trench Volume = (Length)(Storage/ft + Bottom perc/ft) Trench Volume = 1624 ft' Velocity in throat Flow = Q21 =C*i25*a 62 3.1 time of concentration < 5min (in/hr) Q25= 1.3 cfs Velocity = Q25/A A= area of throat in box' A= W*T A= 4.17 sq. ft. A= width of box . throat o W= 4.17 1000 gal s/g trap T= 1.00 Velocity = 0.32 ft/ sec DmCalcs-AJ Building.xls System #1 2 New Building - AJ Inc. Drainaae Area # 2 Area (acres): 1.32 C value: 0.90 Initial Trench Volume = 1 in x (Area (ac) x 43560cu.ft./ac) x 1ft./12in. x "C" Volume = 4311.75 cu. ft. Req'd Storage Vol. = 4312 W Trench Dimensions = 8 Depth (ft) 12 Width (ft) 95 Length (ft) Storage/ft = (Vr)(D)(W) D = 8 ft Depth = 38.4 ft2 W= 12 ft Width Bottom Perc/ft = (W)(Pr)(1ft/12") Vr = 40 %e Drain Rock Void Ratio = 8.00 ftz Pr= 8 in./hr Percolation Rate Trench Volume = (Length)(Storage/ft + Bottom perc/ft) Trench Volume = 4408 ftp Velocity in throat Flow= Q21=C*i25*a i25= 3.1 time of concentration < 5min (in/hr) Qts= 3.7 cfs Velocity = Q25/A A= area of throat in box A= W*T A= 7.69 sq. ft. A= width of box . throat o W= 5.13 1500 gal s/g trap T= 1.50 Velocity = 0.48 ft/ sec DmCalcs-AJ Building.xls System #2 3 I New Buildina - AJ Inc. I Area (acres): 0.07 C value: 0.90 Initial Trench Volume = 1 in x (Area (ac) x 43560cu.ft./ac) x 1ft./12in. x "C" Volume = 215.25 cu. ft. Req'd Storage Vol. = 215 ft' Trench Dimensions = 4 Depth (ft) 6 Width (ft) 18 Length (ft) Storage/ft = (Vr)(D)(W) D = 4 ft Depth = 9.6 ft2 W = 6 ft Width Bottom Perc/ft = (W)(Pr)(1ft/12") Vr = 40 % Drain Rock Void Ratio = 4.00 ft2 Pr= 8 in./hr Percolation Rate Trench Volume = (Length)(Storage/ft + Bottom perc/ft) Trench Volume = 245 ft' Velocity in throat Flow = Q25 =C*its*a i25= 3.1 time of concentration < 5min (in/hr) Q25= 0.2 cfs Velocity = Q25/A A= area of throat in box A= W*T A= 1.50 sq. ft. A= width of box . throat o W= 3.00 350 gal s/g trap (DB1) T= 0.50 Velocity = 0.12 ft/ sec DrnCalcs-AJ Building.xls System #3 4 New Building - AJ Inc. Drainaae Area # 4 Area. (acres): 0.48 D = C value: 0.90 Depth Initial Trench Volume = 1 in x (Area (ac) x 43560cu.ft./ac) x 1ft./12in. x "C" Volume = 1566.75 cu. ft. Req'd Storage Vol. = 1567 ft' Trench Dimensions = 6 Depth (ft) = 6.67 ft2 10 Width (ft) 8 in./hr 55 Length (ft) Storage/ft = (Vr)(D)(W) D = 6 ft Depth = 24 ft2 W = loft Width Bottom Perc/ft = (W)(Pr)(1ft/12") Vr = 40 % Drain Rock Void Ratio = 6.67 ft2 Pr = 8 in./hr Percolation Rate Trench Volume = (Length)(Storage/ft + Bottom perc/ft) Trench Volume = 1687 ft' Velocity in throat Flow = Q21 =C`izs*a i25= 3.1 time of concentration < 5min (in/hr) Q25= 1.3 cfs Velocity = Q2s/A A= area of throat in box A= W'T A= 1.50 sq. ft. A= width of box . throat o W= 3.00 (3)-350 gal s/g trap (DB1) T= 0.50 Velocity = 0.30 ft/ sec DmCalcs-AJ Building.xls System #4 1 vx wx wx wx wx wx wx , w ssx SSrTF ssx ssx S x SSx SS ssx SDx SD SDx �Dx SDx SDx R PIIS= NAGE AREA 20,970 sf DRAINAGE AREA 2 O 57,490 sf 5 a PROPOSE BUILDING a DRAINAGE AREA 3 2,870 sf � o •'. uurvn-a �a 7771777, -wx wx wx wx wx wx wx— SSx SSx SSx SSx—F—SSx SSx— 1 Eo DRAINAGE AREA 4 1 0 20,890 sf 1 PIRR --- ......... ...-. I — SCALE — — — N 0 25 N 100 I=I I INN =SOFT. =mac a 1 n � — >�ED= I I�II— LL IIS IT - I O IDAHO DAIRY PRODUCTS COMMISSION IFF — 35.67 0 A �P 3 'o �ooai SHEET NUMBER 1 OF 1