Loading...
HomeMy WebLinkAboutScentsy South Campus Drainage Calculations_Page_3_Page_08,� Project Information: �ICS. Project Name: SCENTSY CDC WARE 2 Storm-gig Location: Trench C Oa/nn/iyn•µgsMinn-FedwDe Date: 11/11/2014 Subsurface Stormwater Management"" Engineer. Ston-Tech RPM: MC-3500 Site Calculator System Requirements System Sizing Units Number of Chambers Required 2 each Required Storage Volume CF Number of End Caps Required 6 each Stone Porosity (Industry Standard = 40%)% Bed Size (including perimeter stone) 220 square feet Stone Above Chambers (12 inch min.) inches Stone Required (including perimeter stone) 47 tons Stone Foundation Depth (9 inch min.) inches Volume of Excavation 53 cubic yards Overage Cover over Chambers (24 inch min.) inches Non-woven Filter Fabric Required (20% Safety Factor) 110 square yards Sed size controlled by WIDTH or LENGTH? Length of Isolator Row 11.9 feet -imiting WIDTH or LENGTH dimension feet Nan-woven Isolator Row Fabric (20% Safety Factor) 21 square yards Woven Isolator Row Fabric (20% Safety Factor) 26 square yards Storage Volume per Chamber 178.9 CF Storage Volume per End Cap 46.9 CF - Installed Storage Volume 639 cubic feet Controlled by Width (Rows) r— daximum Width = 25 feet1.98 MIMIC mm) _ - inches 2 rows of 1 chamber 1 row of 0 mm. MIN, - - - chambers h orches s daxlmum Length = 11.9 feet 4s'• Aaximum Width= 22_8 fret (1143 mm) e �]T'(1956'mm)---�, IOCheS This represents the estimated material and site work costs (US dollars) for the project. Materials excluded from this estimate an: conveyance pipe, pavement fesign, eta It is always advisable to seek detailed construction costs from local installers. Please contact STORM ECH at 988-892-2694 for additional cost ifonnation.