Loading...
HomeMy WebLinkAboutSolterra Subdivision Final Acceptance Letter Mayor Tammy de Weerd '- City Council Members: Keith BirdJoeBorton Luke Cavener Genesis Milam jIDIIIAAHN0 Charlie Rountree David Zaremba December 18, 2014 Mr. Jim Conger Mr. Christopher Thomas Schmidt Construction, Inc. C13, LLC. CT Holdings, LLC 15883 Robber Place 1627 S. Orchard, Suite 24 5191 N. Brookmeadow Way Caldwell, Idaho 83607 Boise, Idaho 83705 Boise, Idaho 83713 Rev. Kenneth Wilde Capital Christian Center Inc. 2760 E. Fairview Ave Meridian, Idaho 83646 RE Solterra Subdivision Phase 1 — Final Acceptance Installation of this project's sanitary sewer and/or domestic water systems has been satisfactorily completed in accordance with the approved plans. These systems have passed the required testing in accordance with City of Meridian Standard Specifications and Drawings, and therefore are hereby accepted by the City for ownership and normal maintenance. Record drawings submitted to us for this project are also accepted and are being forwarded to the Idaho Department of Environmental Quality. The engineer olf record is responsible for certification of the record drawings as to horizontal and vertical location of all public water and sewer facilities installed. In accordance with the City of Meridian's Unified Development Code §11-5C-3, and the City of Meridian's Supplemental Specifications and Drawings to the Idaho Standards for Public Works Construction, 2013 Edition, the installation and materials of the sewer and domestic water systems are to be warranted against defect by the owner for a period of two-years from the date of this letter. Sinc ely, Warren Stewart, P. City Engineer CC: PW-Water Division City Clerk PW-Wastewater Division File PW-Construction Division DEQ Public Works Department . 33 E Broadway Ave, Suite 20.0, Meridian, ID83642 Phone 208-898-5500 . Fax 208-898-9551 . www.meridiancity.org