HomeMy WebLinkAboutTask Order 10383.A with SPF Water Engineering for Well 29 Interactive DisplayTASK ORDER NO. 10383.A
Under the
MASTER AGREEMENT FOR PROFESSIONAL SERVICES
BETWEEN
CITY OF MERIDIAN (CITY) AND NAME OF CONSULTANT (ENGINEER)
This Task Order is made this 13th day of January, 2015 and entered into by and between the City
of Meridian, a municipal corporation organized under the laws of the State of Idaho, hereinafter
referred to as "City", and accepted by SPF WATER ENGINEERING, INC. hereinafter referred to
as "Engineer" pursuant to the mutual promises, covenant and conditions contained in the Master
Agreement (Category 1 a) between the above mentioned parties dated October 1, 2014. The
Project Name for this Task Order 10383.A is as follows:
CITY OF MERIDIAN
WELL 29 INTERACTIVE DISPLAY, INTERPRETIVE MODELS AND VIDEO
DISPLAY INSTALLATION
PROJECT UNDERSTANDING
This project shall incorporate the following into the new WWTP Administration Building: a digital
interactive display pertaining to "protection of source", an aquifer cross-section interpretive display
model, a well construction interpretive display model that can be attached to the aquifer model,
and a digital video display presenting how wells are drilled and constructed in the Water
Resources section of the City's Wastewater Treatment Plant Interpretive Center.
SCOPE OF SERVICES
Task 1 — Aquifer Cross-section and Well Construction Display Models
Design and construct a static aquifer cross-section display model that describes to laypersons the
City's primary source of drinking water, along with a second model that illustrates how the City
constructs wells to ensure optimum water quality and protection of source.
The scope of work will include the following subtasks.
1.1 Conceptual design of the integrated aquifer cross-section and well construction display
models based on input from the City.
1.2 Design and construction of two acrylic display cases.
1.3 Define aquifer lithology with a 5 to 10 ft resolution based on thorough review of Test Well 29
cuttings and geophysical log.
Task Order 10383.A WELL 29 INTERACTIVE DISPLAY, INTERPRETIVE MODELS, AND VIDEO DISPLAY Page 1 of 4
SPF WATER ENGINEERING, INC.
1.4 Construction of the physical aquifer cross-section interpretive display model includes precise
placement of well cuttings or supplemental geologic materials and incorporation of explanatory
display panels describing and discussing key concepts.
1.5 Well construction interpretive display model that attaches to the aquifer cross-section display.
Includes (1) physical depiction of well casing, screen, filter pack, and surface seal, and (2)
incorporation of explanatory display panels describing and discussing key concepts.
Task 2 — Interactive "Protection of Source" Animated Display
SPF will contract with Scribble Box Marketing to design, produce, and install an interactive and
instructional digital display based on the mantra "protection of source." The interactive display will
include three to six buttons that take the user through a brief (60 to 90 second) tutorial related to
"protection of source." The interactive display will be mounted on the Water Resource Education
Center wall. SPF will provide technical support associated with the digital content including the
identification of the three to six tutorials to be included.
This scope of work will include the following subtasks.
2.1 Provide a detailed storyline covering key concepts associated with up to six tutorials related
to "protection of source." The storyline will include text and example graphics for each
tutorial. Preliminarily, we anticipate that the tutorials will cover the following topics.
• Water cycle, with emphasis on Treasure Valley
• Hydrogeology, with emphasis on Treasure Valley and Meridian
• Groundwater flow systems and paths within Treasure Valley
• City of Meridian drinking water wells, showing how wells are constructed to maximize
delivered water quality and minimize potential for aquifer contamination
• Groundwater contamination mechanisms, with emphasis on methods to prevent
groundwater pollution. Specific contaminant source to be presented and discussed will
likely include
o Abandoned wells or improperly constructed wells
o Fertilizer, pesticide, and herbicide — improper application
o Septic systems — inadequate maintained
o Surface spills of oils or chemicals — direct infiltration to groundwater flow to
surface water through storm drain systems
o Underground storage tanks
2.2 SPF's contractor will design, produce, animate, and install an interactive and instructional
digital display based on the mantra "protection of source." The 70 -inch HDTV display and
interactive control panel will run three to six tutorials.
2.3 SPF will provide technical support during development and integration. We anticipate that the
technical support will include up to 3 meeting with City staff to discuss content.
Task 3 — Well Drilling Video Technical Support and Installation of Monitor
Provide technical support associated with a video describing well construction, including
identification of noteworthy steps of well construction. SPF will contract with Scribble Box
Marketing to install an HDTV monitor at the City's Water Resource Education Center to run an
Task Order 10383.A WELL 29 INTERACTIVE DISPLAY, INTERPRETIVE MODELS, AND VIDEO DISPLAY Page 2 of 4
SPF WATER ENGINEERING, INC.
informational video describing well construction. The City has a separate contract with Scribble
Box Marking to shoot, edit, encode, and deliver the videography content.
This scope of work will include the following subtasks.
3.1 Provide technical support and assist videography contractor during video production; provide
timeline of key moments during well construction for contractor, and edit video text for content
and accuracy.
3.2 Install a 55 -inch to 70 -inch HDTV monitor and all components necessary to play the well
construction video on a continuous loop.
SCHEDULE
SPF is ready to begin this project upon notice to proceed. This work will coincide with, and be
constrained by work associated with design and construction of Test Well 29 and Production Well
29. Tasks 1 and 2 will be completed within 90 days following construction of Test Well 29. Task 3
will also be completed within 90 days following completion of the video.
TIME OF COMPLETION and COMPENSATION SCHEDULE
The following schedule is based on a Notice to Proceed (NTP) from the City by January 2015 and
resulting in Final Design/installation being completed by June 30, 2015. A NTP issued on a
different date will change the schedule accordingly.
1 1 Aquifer Cross-section and Well Construction Display Models $15,528
2 Interactive 'Protection of Source" Animated Display $27,490
$9,740
The Not -To -Exceed amount to complete all services listed above for this Task Order No. 10383.A
is fifty-two thousand, seven hundred fifty-eight dollars ($52,758.00). No compensation will be paid
over the Not -to -Exceed amount without prior written approval by the City in the form of a Change
Order. The hourly rates for services and direct expenses shall be billed per the approved Rate
Schedule and Master Agreement (by this reference made a part hereof) and will be the basis for
any additions and/or deletions in services rendered. Travel and meals are excluded from this Task
Order unless explicitly listed in the Scope of Services AND Payment Schedule.
Task Order 10383.A WELL 29 INTERACTIVE DISPLAY, INTERPRETIVE MODELS, AND VIDEO DISPLAY Page 3 of 4
SPF WATER ENGINEERING, INC.
Dated: / -13 " /S
Approved by
SPF WATER ENGINEERING, INC.
BY:
CATHY CG O ER
Dated: -015
��onuo
m SEAT.
Purchasing Approval /'h° lRtOs' PI
BY: "
KEITH TTS, Purchasing Manager
Dated:
City Project Manager
David Allison
m
Dated: lll/ /6
Task Order 10383.A WELL 29 INTERACTIVE DISPLAY, INTERPRETIVE MODELS, AND VIDEO DISPLAY
SPF WATER ENGINEERING, INC.
Page 4 of 4
IDSOS Viewing Business Entity Page I of I
IDAHO SECRETARY OF STATE
Viewing Business Entity
Lawerence Denney, Secretary of State
[ New Search ] [ Back to Summary ]
[ Get a certificate of existence for SPF WATER ENGINEERING, LLC ]
[ Monitor SPF WATER ENGINEERING, LLC business filings ]
SPF WATER ENGINEERING, LLC
300 E MALLARD DR STE 350
BOISE, ID 83706
Type of Business: LIMITED LIABILITY COMPANY
Status: EXISTING, ANREPT SENT 07 Jan 2015
State of Origin: IDAHO
Date of 02 Mar 2004
Orig i nation /Authorization:
Current Registered Agent: CATHERINE E COOPER
300 E MALLARD DR STE 350
BOISE, ID 83706
File Number: W28961
Date of Last Annual Report: 28 Jan 2014
Original Filing:
[ Help Me Print/View TIFF ]
Filed 02 Mar 2004 ARTICLES OF View Image (PDF format) View
ORGANIZATION Image (TIFF format)
Annual Reports:
[ Help Me Print/View TIFF ]
Report for year 2014
ANNUAL REPORT
View
Document Online
Report for year 2013
ANNUAL REPORT
View
Document Online
Report for year 2012
ANNUAL REPORT
View
Document Online
Report for year 2011
ANNUAL REPORT
View
Document Online
Report for year 2010
ANNUAL REPORT
View
Document Online
Report for year 2009
ANNUAL REPORT
View
Document Online
Report for year 2009
CHNG View Image
(PDF format) View Image
RA/RO
(TIFF format)
Report for year 2008
ANNUAL REPORT
View
Document Online
Report for year 2008
CHANGE View Image
(PDF format) View Image
ADDRESS
(TIFF format)
Report for year 2007
ANNUAL REPORT
View
Document Online
Report for year 2006 ANNUAL View Image (PDF format) View Image
REPORT (TIFF format)
Report for year 2005 ANNUAL View Image (PDF format) View Image
REPORT (TIFF format)
Idaho Secretary of State's Main Page State of Idaho Home Page
Comments, questions or suggestions can be emailed to: sosinfo(a)sos.idaho.gov
htt„•//xxnxnxr arracciAahn nra/r�nhlir/enc/rnm/\V7RQ(xl html 1/7/901 S
.�� SPFWA-1 OP ID: JY
DATE(MWOowm
GERTIFIGAT E OF LIMSILI I Y INSUKAN%.r 1 0 211 312 01 4
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER, THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURERjS), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT: N the certificate holder Is an ADDITIONAL INSURED, the policy(les) must be endorsed. If SUBROGATION 13 WANED, subject to
the Isms and conditions of the policy, certain policies may require an endorsement. A statement on this certificatedoesnal confer rights to the
certificate holder In lieu of such endorsement(s).
PROWCER
The Hartwell Corporation - Cal
PO Sox 400
Caldwell, ID 89606
Jeremy Kroll
Coon
NAME:
PHONE F Ne :
No Er
aooREsa:
INSURERS AFFORDING COVERAGE "of
INSUAERA: Travelers Indemnity Cc of Am. 25658
INSURED 675677
SPF Water Engineering, LLC
300 E Mallard Drive, Suite 350
Boise, ID 83708
INsuRERs: Idaho State Insurance Fund 36129
INSURER C: Travelers Indermilly Co 25666
INauRERD:CaUlninsurance Co
INSURERS:
INSURERF:
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
IYPEOFINWRANCE
POLICYNUMBeR
w
LlMrla
A
GENERAL LIA81Lm'
X COMMERCIALGENERAILIPBILHY
CLAIMS -MADE OX CCCUR
-X CGD391
X
X
80-4798X147
02/192014
0211912015
EACH OCCURRENCE S 1,000,00
PREMISES(Eaaccu o) $ 1,000,00
MED EXP (MY mre M.) $ 1-10,000
PERSONAL 6 ADV INJURY $ 1,000,()0
GENERAL AGGREGATE $ 2,000,00
GEHL AGGREGATE LIMB APPLIES PER:
POLICY X PRO- LOC
PRODUCE-COWMPAGG $ 2,000;00
$
C
AUTOMOBILE LNBILnV
X AHYALHO
ALL OWNEDSCHEOLLED
AIRED A -ROS NM)s ALTO
HOJrNOOS ED
X CAT353
BA4803X475
02/192014
021192015
COMBINED NGLE LIM 1,000,00
Ee maldmt
BODSY IN.URY (Par person) $
BODILY IHUIRY IPer eccitlert) $
PPER PCCIDENr $
$
C
UMBRELLALUB
X EXCESSLAS
X
OCCUR
C1AIMSMADE
CUP -004803X101
021192014
021192015
EACH LJRRENCE $ 2,000,00
AGGREGATE $ 2,000,00
ILED IX IRETEMION 10.0
B
WORIER9 COMPS e
AND EMPLOYERS' LM81LItt
ANY PROPRETORFARTNER,FJ(ECUBVE Y�
OFFICERIMEMBEREXCLIAED9
(Mmo doryIn NH)
Il yes da T,ba urger
DESCRIPTION OF OPERPTIONS W.
NIA
01/012014
011012015
T I ITB E
E.LEACHACCIDENT E 1,()00,00
EL DIREARE-E0. EMPLOYEE $ 1,000,00
E.L. DISEASE POLICY LIMIT t 1,000,00
D
Profes LIS blllty
10,000 deductible
AED99388.0215
021262014
02/26/2015
Ea Clalm 2,000,00
Annl Aggr 2,000,00
DESCRR ONOFOPERATONSILOCAnONBIVEHICLES(Al hACORDIOI.MdNonMRomm16madule,emore FpA anqulnd)
City of Meridian
Department of Public Works
33 E Broadway Ave
Meridian, ID 83642
ACORD 25 (2010/05)
MERID03
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
®1988-2010
The ACORD name and logo are registered marks of ACORD
All rights resonied.
I'm