Loading...
HomeMy WebLinkAboutAIA Agreement with Energy Enterprise for Storey Park Development - Bid Package No. 5: Electrical SystemsGAIADocument A132T" - 2009 Standard Form ofAgreement Between Owner and ContractorConstructionManageras Adviser Edition Bid Package No. 5— Electrical Systems ADDITIONS AND DELETIONS: AGREEMENT made as of the Twenty-second day of December in the year Two Thousand The author of this document has Fourteen added information needed for Its (In words, indicate day, month and year) completion. The author may also have revised the text of the original BETWEEN the Owner:..: AIA standard farm. An Additions and (Name, legal status,' address and other information) Deletions Report that notes added information as well as revisions to the - City of Meridian standard form text Isavailable from 33 East Broadway Avenue the author and should be reviewed. A Meridian, Idaho 83642 vertical line In the left margin of this - document Indicates where the author the Contractor: has added necessary information .and -.(Name, legal stales, address and other information) and where the author has added to or deleted from the odglnal AIA text. `Energy Enterprise Group, LLC This document has Important legal `.150 South Adkins, Suite 140: consequences, Consultation with an Meridian, Idaho 83642 ': attorney Is encouraged with respect ' Telephone. Number: 208-322-2334 to Its completion or modification. Fax Number: 208-321-4800 This document tslntended to be used in conjunction with AIA Documents for the following Project: A232--2009, General Conditions of (Name, location and detailed description) the Contract for Construction, Construction Manager as Adviser Storey Park Development Edition; B1 32'u-2009, Standard 430 East Watertower Lane Form of Agreement Between Owner Meridian, Idaho 83642 and Architect, Construction Manager as Adviser Edition: and The Construction Manager: C132m-2009, Standard Form of - (Name, legal slates, address and other irjformation) Agreement Between owner and Construction Manager as Adviser. - Kreizenbeek, LLC DBA Kreizenbeck Constructors, AIA Document A232TM-20091s '. 11724 West Executive Drive- adopted In this document by Boise, Idaho 83713 reference. Do not use with other Telephone Number: (208) 336-9500 general conditions unless this Fax Number: (208) 336-7444` document Is modified. The Architect: (Name, legal status, address and other information) IosightArchitects, P.A. 2238 South Broadway Avenue Boise, Idaho 83706 Telephone Number: (208) 338-9080 The Owner and Contractor agree as follows. AIA Document A132m—20091Iforinedy A101TMCMa-1992). Copyright m 1975, 1980,1992 and 2009 by The American Institute of Architects. All rights InIL reserved. WARNING: This AIA b Document is protected by U.S. Copyright Law and International Trestles, Unauthorized reproduction or distribution of this AIA`: Document, or any portion of It, may result In severe civil and criminal penaltim, and will be prosecuted to the maximum extent possible under y the law. This document was produced byAlA software a[ 09:28:59 an 12/31/2014 under Order No.65275953115_l which expires on 0110712015, and is not for resale. Nnar Nota.: (1850954099) TABLE OF ARTICLES 1 THE CONTRACT DOCUMENTS 2 THE WORK OF THIS CONTRACT 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION 4 CONTRACT SUM 5 PAYMENTS 6 DISPUTE RESOLUTION 7 TERMINATION OR SUSPENSION S MISCELLANEOUS PROVISIONS 9 ENUMERATION OF CONTRACT DOCUMENTS 10 INSURANCE AND BONDS ARTICLE 1 THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, Addenda issued priorto execution. of this Agreement, other documents listed in this Agreement and Modifications issued after execution of this Agreement, all of which form the Contract, and are as fully a -part of the Contract as if attached to this Agreement or repeated herein. The Contract, together with the performance bond and payment bond, if any, represent the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written or oral. An enumeration of the Contract Documents, other than Modifications, appears in Article 9. ARTICLE 2 THE WORK OF THIS CONTRACT -The Contractor shall fully execute the Work described in the Contract Documents, except as specifically indicated in the Contract Documents to be the responsibility of others. Contract Requirements: Provide all labor, material, permits and equipment to complete work of furnishing installing a complete and operable electrical system, as noted in the construction documents and per the `:.following:. Division I - General Requirements, Complete Section U37000 - Cast- 1n - mace. tAncrete" **As'applicable to this scope of work This contract specifically includes but is not limited to: • Furnish and install complete operational electrical systems in accordance with construction documents. • Furnish and install all conduit and outlet boxes fur other trades in accordance with the construction documents. • Furnish and install conduit and boxes for door hardware • Excavation, backfill and compaction for your work. Provide suitable fill for trenching operation as required • Provide and install concrete light pole bases complete with rebar and sack finish. • Provide: and install all light poles and exterior lighting systems and accessories. • Coordinate all work as required with Idaho Power. • Include a $5,000 allowance in the base bid to be used at the sole discretion of the Construction Manager AIA Document A132-- InIL ....-,.A. wne MIMr- rh -1992). Copyright 671975, 1980, 1992 and 2009 by The I ted by U.S. Copyright Law and International Trealles. t In severe civil and criminal penalties, and will be prose of 09:28:59 an 12/31/2014 under Order No.6527595385_1 User Notes: (1850954099) or 2 ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION § 3.1 The date of commencement of the Work shall be the date of this Agreement unless a different date is stated s below or provision is made for the date to be fixed in a notice to proceed issued by the Owner. (Insert the date ofcommencement, ifil differsffnm the date ofthis Agreement or, ifopplicable, stale that the dale will -be fixed in a notice to proceed.) The commencement date will be fixed in a notice to proceed. If, prior to the commencement of the Work, the Owner requires time to file mortgages, mechanics' liens and other security interests, the Owner's time requirement shall be as follows: § 3.2 The Contract Time shall be measured from the date of commencement. § 3.3 The Contractor shall achieve Substantial Completion of the entire Work not later than ( ) days from the date of commencement or as follows: '(Insert number ofcalendar days. Alternatively, a calendar date may be used when coordinated with the date of commencement if appropriate, insert requirements for earlier Substantial Completion ofcerrain portions of the Work) The work shall be substantial ly complete by July 2, 2015. (Table deleted) , subject toadjustments'of this Contract Time as provided in the Contract Documents. (Insert provisions, ifany, for liquidated damages relating to failure to achieve Substantial Completion on time orfor bonus paymentsfor earlly. completion oflhe Work) In the event the Contractor, :without excuse, fails to achieve Substantial Completion within the Contract Time, the Contractorshall payto the Owner as liquidated damages, and not as a penalty, the sum of One Thousand Dollars ($1,000.00) or Ye% of the. Con tract Value (whichever is greater) for each and every calendar day following the end of the Contract Time until: Substantial Completion is achieved; provided that the Contractor shall not be liable for liquidated damages for day, or days of the excusable delay occurring during such period following the end of the Contract Time. ARTICLE 4 CONTRACT SUM § 4.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's performance of the Contract. The Contract Sum shall be one of the following: the appropriate box.) I' [ X ] Stipulated. Sum, in accordance with Section 4.2 below [ ] Cost of the Work plus the Contractor's Fee without a Guaranteed Maximum Price, in accordance with Section 4.3 below ] Cost of the Work plus the Contractor's Fee with a Guaranteed Maximum Price, in accordance with Section 4.4 below (Based on the selection above, complete Section 4.2, 4.3 or 4.4 below. Based on the selection above, also complete - either Section 5.1.4, 5.1.5 or 5.1.6 below.) § 4.2 Stipulated Sum § 4.2.1 The Stipulated Sum shall be Thirty-one Thousand Two Hundred Five Dollars and Zero Cents ($ 31,205.00 ), subject to additions and deletions as provided in the Contract Documents. Base Bid $8,485.00 Alternate No. 1 NOT ACCEPTED Init. reserved. WARNING: This this AIA! or an l the low. This document we, resale. User Notes: at 0426:69 on 1992 and 2009 by The American its of Architecls,All rights oproductiop or distribution of 3 iaximum extent possible under on 0110712015, and Is not for (1960964099). Alternate No. 2 Alternate No. 3 Alternate No. 4 Alternate No. 5 Alternate No. 6 I' Total Contruel Amount $0.00 $21,928.00 $792.00 $0.00 §: 4.2.2 The Stipulated Sum is based on the following alternates, if any, which are described in the Contract Documents and are hereby accepted by the Owner: (State the numbers or other identification of accepted alternates. Ifthe bidding or proposal documents permit the Owner to accept other alternates subsequent to the execution of this Agreement, attach a schedule of such other alternates showing the amount for each and the date when that amount expires) Alternate No. 2 - Road Connection with Additional Parking: Refer to Sheets L1.3, GD.2.2, GD.3.1, and SD.1.1. Alternate No. 3 - Restroom Building: Refer to Sheets L1.1, AM, A2.1, A2.2, A2.3, A3.1, A4.1, MGO.0, MG0.1, M 1.0, M2.0, M3.0 EG0.0, EO.1, E1.1,131.2, and E2.0. Alternate No. 4 - Large Shelters: Refer to Sheet Ll.l and Spec Section 107300 Shade Shelters. Altemate No. 5 -: Synthetic Turf: Refer to Sheet Ll.l and Spec Section 321813 Synthetic Turf Surfacing. Alternate No. 6 - Irrigation Pipeline Replacement: Refer to Sheet GIRR.1. § 4.2.3 Unit prices, if any: (identify andslate the unitprice, andstate the quantity limitations, ifarry, to which the unit price will be applicable) Item Units and Limitations Price per Unit ($0.00) -§ 4.2.4 Allowances included in the Stipulated Sum, if any: (Idents allowance and stale exclusions, ifany, from the allowance price.) Item Allowance As identified in Article 2 (Paragraphs deleted) (Table deleted) (Paragraphs deleted) (Table deleted) (Paragraphs. deleted) (Table deleted) (Paragraphs deleted) ARTICLE 5 - PAYMENTS § 5.1 Progress Payments § 5.1.1 Based upon Applications for Payment properly submitted to the Construction Manager by the Contractor,: and upon certification of the Project Application and Project Certificate for Payment or Application for Payment and Certificate for Payment by the Construction Manager and Architect and issuance by the Architect, the Owner shall make progress_ payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the _.:Contract Documents. -§ 5,1.2 The, period covered by each Application for Payment shall be one calendar month ending on the last day of the month, or as follows: Init AIA Document A132 -- on 1975• Of or distribution of 4 tnl possible under 5. and Isnot for (1850964099) § 5.1.3 Provided that an Application for Payment is received by the Construction Manager not later than the Twenty-fifth day of a month, the Owner shall make payment of the certified amount in the Application for Payment to the Contractor not later than the Twenty-fifth day of the following month. If an Application for Payment is received -. by the Construction Manager after the application date fixed above, payment shall be made by the Owner not laterthan Thirty '('30 ) days after the Construction Manager receives the Application for Payment. (Federal, slate or local latus may require payment within a certain period of time.) § 5.1.4 Progress Payments Where the Contract Sum is Based on a Stipulated Sum §`. 5.1.4.1 Each Application for Payment shall be based on the most recent schedule of values submitted by the f Contractor and approved: in writing by the Construction Manager and Architect in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the various portions ofthe Work and -be prepared in such form and supported by such data to substantiate its accuracy as the Construction Manager and Architect may require: This schedule, when, and only when, approved in writing by the Construction Manager or Architect, shall be used: as a basis for reviewing the Contractor's Applications for Payment. `§ 5.1.4.2 Applications for Payment shall show the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. § 5.1.4.3 Subject to the provisions of the Contract Documents, the amount ofeach progress payment shall be computed as follows: .1 Take that portion of the Contract Sum properly allocable to completed Work as determined by multiplying the percentage completion of each portion of the Work by the share of the total Contract Sum allocated to that portion of the Work in the approved schedule of values, less retainage of Five percent ,('5.00 %). Pending final determination of cost to the Owner of changes in the Work, amounts not in. dispute may be included as provided in Section 7.3.9 of the General Conditions, as modified; .2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction (or, if approved in writing in advance by the Owner, suitably stored off the site at a location agreed upon in writing), less retainage bf Five percent ( 5.00"/o); .3 Subtract the aggregate of previous payments made by the Owner; .4 Subtractamounts, if any, for which the Construction Manager or Architect has withheld or nullified a Certificate for as provided in Section 9.5 of the General Conditions, as modified; and .5 l Subtract amounts, if any, being withheld by the Owner or Construction Manager as provided in the Contract Documents. § 5.1.4.4 The progress payment amount determined in accordance with Section 5.1.4.3 shall be further modified under the following circumstances: .1r Add, upon SubstantialCompletion of the Work, a sum sufficient to increase the total payments to Ninety-five percent ('95.00 %) of the Contract Sum, less such amounts as the Construction Manager recommends and the Architect determines for incomplete or defective Work, or both and unsettled claims; and _ .2 Add, iffinal completion ofthe Work is thereafter materially delayed through no fault ofthe Contractor, any additional' amounts payable in accordance with Section 9.10.3 of the General Conditions, as modified. § 5.1.4.5 Reduction or limitation of retainage, if any, shall be as follows: (Ifit is intended prior to Substantial Completion ofthe entire Work to reduce or limit the retainage resultingfr•om the percentages inserted in Sections 5.1.4.3.1 and 5.1.4.3.2 above, and this is not explained elsewhere in the Conti -act Documents, insert here provislonsfor such reduction or limitation.) No reduction in retainage will be allowed prior to final completion without written approval of the Owner. (Paragraphs deleted) § 5.1.4.6 A condition will be included forbidding more retainage from a contractor or supplier than retained from their portion of the Work. AIA Document A132-- 20091Ifonneriy Al0"CIVIs —1992). Copydght 0 1975, 1960, 1992 and 2009 by The American Insglule of Arohltecb,. All rights Init reserved. WARNING: This AIAb. Document Is protected by U.S. Copyright Lew and International Treaties. Unauthorized reproduction or distribution or. 5 this AIAe Document, or any portion or it, may result In severe civil and cdminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 69; 26;59 on 1213112014 under Order No,5527595365_l which expires on 011071201 S. and Is not for resale. User Notes: (1650954099) § 5.2 Final Payment § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when :1 the Contractor has fully performed the Contract except for the Contractor's responsibility to correct Work as provided in Section 12.2 of AIA Document A232-2009 as modified, and to satisfy other requirements, if any, which extend beyond final payment; .2 the Contractor has submitted a final accounting for the Cost of the Work, pursuant to Exhibit A, Determination of the Cost of the Work when payment is on the basis ofthe Cost of the Work, with or without Guaranteed Maximum payment; and 3 a final Certificate for Payment or Project Certificate for Payment has been issued by the Architect; such final payment shall be made by the Owner not more than 30 days after (1) the Contractor has fully performed the Contract and (2) the issuance of the final Certificate for Payment or Project Certificate for Payment, or as follows: ARTICLE 6 DISPUTE RESOLUTION § 6.1 Initial Decision Maker The Architect will serve as Initial Decision Maker pursuant to Section 15.2 of ATA Document A232-2009 as `.modified, unless the parties appoint below another individual, not a party to this Agreement, to serve as Initial Decision Maker, (Ifthe parties multlally agree, insert the name, address and other contact information ofthe Initial Decision Maker, if other than the Archilect.) § 6.2 Binding Dispute Resolution For any Claim subject to but not resolved by, mediation pursuant to Section 15.3 of AIA Document A232-2009 as modified, the method of binding dispute resolution shall be as follows; (Check the appropriate box. If the Owner and Contractor do not select a method of binding dispute resohition below, or do not subsequently agreeinwriting to a binding dispute resolution method other than litigation, Claims will be resolved by litigation in'a court of competent jnrisdiction.) I- ] Arbitration. pursuant to Section 15.4 of AIA Document A232-2009. I, [ X ] Litigation in a court of competent jurisdiction. '[ ] Other: (Specify) ARTICLE;7 TERMINATION OR SUSPENSION § 7.1 Where the Contract Sum is a Stipulated Sum § 7.1.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of AIA Document A232-2009 as modified. § 7.1.2 The Work may be suspended by the Owner as provided in Article 14 of AIA Document A232=2009 as modified. (Paragraphs deleted). ARTICLE 8MISCELLANEOUS PROVISIONS § 8.1 Where reference is made in this Agreement to a provision of ATA Document A232—.2009 as modified or another Contract Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. § 8.2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below, or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located. (Insert rate'ofinterest agreed upon, ifany.) 3/4 of l% per month § 8.3 The Owner's representative: AIA Document A132--2009 romierly A101"C61a-1992). CopyrightO 1976,1990,1992 and 2009 by The American Institute of Architecla• IDIL reserved. WARNING: This AIA` Document Is protected by. U.S. Copyright Law and International Treaties. Unauthorized reproduction or (1950954099) of 8 (Name, address and other information) Keith. Watts, Purchasing Manager `:. City of Meridian Purchasing Department 33 East Broadway Avenue Meridian, Idaho 83642 §; 8.4 The Contractor's representative: (Name, address and other information) Chad McKibben Telephone Number: 208-322-2334 Mobile Number: 209-860-0835 -Email Address: chad@eegidaho.com § 8.5 Neither the Owner's nor the Contractor's representative shall be changed without ten days written notice to the ,other party.. § 8.6 Other provisions:. ` ARTICLE 9 ENUMERATION OF CONTRACT DOCUMENTS § 9.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated in .the sections below. '§ 9.1.1 The Agreement is this executed AIA Document A132-2009 as modified, Standard Form of Agreement Between Owner and Contractor, Construction Manager as Adviser Edition. § 9.1.2111e General Conditions are, AIA Document A232-2009 as modified, General Conditions of the Contract for Construction, Construction Manager as Adviser Edition. § 9.1.3 The Supplementary and other Conditions of the Contract: Document Title Date Pages ExhibitA Contract Document Schedule 12/2212014 2 ,§ 9.1.4 The Specifications: (Either list the Specifications here or refer to an exhibit attached to this Agreement.) Title of Specifications' exhibit: Contract Document Schedule, Exhibit A, dated December 22, 2014 (Table deleted) § 9.1.5 The Drawings: (Either list the Drawings here or refer to an exhibit attached to this Agreement.) Title of Drawings exhibit: Contract Document Schedule, Exhibit A, dated December 22, 2014 (Table deleted) § 9.1.6 The Addenda, if any: Number Date Pages One ` 12115/2014 2 Portions of Addenda relating to bidding requirements are not part of the Contract Documents unless the bidding requirements are also enumerated in this Article 9. AIA Document At 32--2008 romrady A101TMCMa-1992). Copyright ®1976,1980, 1992 and 2009 by The American Institute ofArchltecls. All dghte Inst. reserved. WARNING: This AIA Document le protected by U.S.Copyd9ht Law and Inlematlonet Treallea. Uneuthorized reproduction or dletdbution or 7 I the Yaw. This document was produced byAlAseftiera at 09:26:59 on 12/3112014 under Order No.8627695385_1 which expires on (1850954099) § 9.1.7 Additional documents,if any,forming part of the Contract Documents are: .1 AIA Document A132TM 2009,Exhibit A,Determination of the Cost of the Work,if applicable. .2 AIA Document E201TM-2007,Digital Data Protocol Exhibit,if completed,or the following: N/A .3 AIA Document E202TM-2008,Building Information Modeling Protocol Exhibit,if completed,or the following: N/A .4 Other documents,if any,listed below: (List here any additional documents which are intended to form part of the Contract Documents.AIA Document A2322009 provides that bidding requirements such as advertisement or invitation to bid, Instructions to Bidders,sample forms and the Contractor's bid are not part of the Contract Documents unless enumerated in this Agreement. They should be listed here only if intended to be part of the Contract Documents.) All binding documents including the Invitation to Bid,Instructions to Bidders,Supplemental Instructions to Bidders,Bid Proposal Forms,and the Project Schedule are intended to be part of the Contract Documents. AIA Document A232-2009 General Conditions Exhibit A,Contract Document Schedule dated 12/22/2014 ARTICLE 10 INSURANCE AND BONDS The Contractor shall purchase and maintain insurance and provide bonds as set forth in Article 11 of AIA Document A232-2009 as modified Refer to Supplemental Conditions modifying AIA Document A232-2009 for changes and additions to Article 11 "Insurance and Bonds". Contractor is required to provide 100%Payment and Performance Bonds. (State bonding requirements, if any, and limits of liability for insurance required in Article 11 of AIA Document A232-2009.) Type of Insurance or Bond Limit of Liability or Bond Amount($0.00) This A nt=-is ent= -: '- - • _th day and year first written above. 1/4 OWNER(Si:, 'e CONTRACTOR(Signature) I . �, L 15410 d, , ,. Tammy de Weerd ,Mayor _ 1 (Printed name and title) (Printed name and title) AIA Document Al 32TM—2009 formerly A101 TMCMa—1992).Copyright©1975,1980,1992 and 2009 by The American Institute of Architects.All rights Init. reserved.WARNING:This AlA Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of 8 this AlA®Ale Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.This document was produced by AIA software at 09:26:59 on 12/31/2014 under Order No.6527595385_1 which expires on 01/07/2015,and is not for resale. User Notes: (1850954099) CONTRACT DOCUMENT SCHEDULE (EXHIBIT A) City of Meridian Storey Park Development 430 E Watertower Street Meridian, Idaho 83642 KC PROJECT NO. 14-085 December 22, 2014 PROJECT DOCUMENTS as issued by Insight Architects, P.A. and prepared by the following project team: Architect— Insight Architects, P.A. Structural Engineer—AHJ Engineers, PC Civil Engineer — Erickson Civil Landscape Architect— Jensen Belts Associates Mechanical Engineer—Musgrove Engineering, P.A. Electrical Engineer—Musgrove Engineering, P.A. Construction Manager— Kreizenbeck Constructors PROJECT MANUALS Instructions to Bidders, Complete — Dated November 21, 2014 Project Manual, Complete— Dated November 21, 2014 ADDENDUMS Addendum No. One—Dated December 15, 2014 DRAWINGS — Dated November 21, 2014 A.01 Cover Sheet Civil C1.0 Cover Sheet CIA Notes C1.2 Topographic Survey GD.0 Overall Grading Plan & Earthwork Req. GDA Grading & Drainage Plan—Area 1 GD.2.0 Grading & Drainage Plan—Area 2 GD.2.1 Grading & Drainage Plan—Area 2 (All 41) GD.2.2 Grading & Drainage Plan—Area 2 (Alt #2) GD.3.0 Section Views (Base Bid) GD.3.1 Section Views (Alt #1 &' Alt #2) GD.3.2 Internal Pathway Alignments GD.3.3 Internal Pathway Profiles —1 GD.3.4 Internal Pathway Profiles— 2 GDA Roadway Profile & Details -1 GD.5 Details -2 GDA Details -3 SDA Stomp Drain Base Bid & Alt #1) SD.1.1 Storm Drain (Alt #2) SD.2 Storm Drain Details -1 SD.3 Storm Drain Details -2 GIRRA Gravity Irrigation (All #S) UTA Utility Plan SPA SWPPP—Cover Sheet SP.2 SWPPP Plan Sheet SP.3 SWPPP—Details Landscape L1.1 Site Plan — Area 1 1.1.2 Site Plan —Area 2 1.1.3 Site Plan—Area 2 L2.1 Landscape Plan —Area 1 L2.2 Landscape Plan — Area 2 L2.3 Landscape Plan — Area 2 L3.1 Irrigation Plan —Area 1 L3.2 In igatlon Plan —Area 2 L3.3 Irrigation Plan —Area 2 Architectural Al.1 Floor Plan, Roof Plan, Roof Framing Plan, Reflected Gelling Plan, Foundation Plan A2.1 Building Sections, Details A2.2 Details A2.3 Details A3.1 Exterior Elevations, Interior Elevations A4.1 General Structural Notes / Schedules Mechanical MG0.0 Mechanical Cover Sheet MG0.1 Energy Code Compliance M1.0 Mechanical Plans M2.0 Mechanical Details M3.0 Mechanical Schedules Storey Park Development Page 1 of 2 December 22, 2014 Electrical EG0.0 Elecldcal Cover Sheet & Details EG1.0 Lighting Compliance Forms E1.1 Electrical Site Plan—Area 1 E1.2 Electrical Site Plan —Area 2 E2.0 Electrical Plans & Schedules Storey Park Development Page 2 of 2 December 22, 2014