Loading...
HomeMy WebLinkAboutAIA Agreement with Butte Fence for Storey Park Development - Bid Package No. 3: Fencing and GatesAIA DocumentA132"' - 2009 Standard Form ofAgreement Between Owner and Contractor,Construction Manageras Adviser Edition Bid Package No. 3 — Fencing and Gates - ADDITIONS AND DELETIONS: AGREEMENT made as of the Twenty-second day of December in the year Two Thousand The author of this document has Fourteen added Information needed for Its ;(/n words, Indicate day,; month and year:) completion. The author may also have revised the text of the original BETWEEN the Owner: AIA standard form. An Additions and (Name, legal status, address: and other information) -Deletions Report that notes added Information as well as revisions to the City of Meridian standard form text Is available from 33 East Broadway Avenue the author and should be reviewed. A Meridian, Idaho 83642 vertical line in the left margin of this -. document indicates where the author and the Contractor: has added necessary Information' (Name, legal status, address and other information) and where the author has added to or deleted from the original AIA text. Butte Fence This document has Important legal 2049 East Wilson Lane - consequences. Consultation with an '-Meridian, Idaho 83642 attorney Is encouraged with respect: Telephone Number: 208-884-0203 to its completion or modification. Fax Number: 208-884-8929 This document Is Intended to be used In conjunction with AIA Documents for the following Project: A232w-2009, General Conditions of (Name, location and detailed description) the Contract for construction, Construction Manager as Adviser .Storey Park Development Edition;. 8132w-2009, Standard 430 East Watertower Lane Form of Agreement Between Owner Meridian, Idaho 83642: and Architect, Construction Manager as: Adviser Edition: and The Construction Manager: C132--2009, Standard Form of (Name, legal stairs, address and other information) Agreement Between Owner and Construction Manager. as Adviser. Kreizenbeck, LLC DBA Kreizenbeck Constructor s� AIA Document A232"^-20091s '-11724 West Executive Drive adopted In this document by _ - Boise, Idaho 83713 reference. Do not use with other Telephone Number: (208) 336-9500 general conditions unless this r-Fax Number: (208) 336-7444 document is modified. The Architect: (Name, legal status, address and other information): - - ..Insight Architects, P.A. 2238 South Broadway Avenue Boise, Idaho 83706 Telephone Number: (208) 338-9080 The Owner and Contractor agree as follows. AIA Document A132TM — 2009 /1formerly Af 0l TMCMe —1992). Copyright 01975,1980, 1992 and 2009 by The American Institute of Architects, All rights Init.reserved. WARNING: This AIAs Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of thisAhe Document. or any portion of It may result In severe civil and criminal penaltles, and will be prosecuted to the maximum extent possible under f: ' .the law. This document was produced by AIA software at 09:22:05 on 12/3112014 under Order No,65275953851 which expires on 0110712015, and is not for resale. Deer Notes: (1657506671):: TABLE OF ARTICLES 1 THE CONTRACT DOCUMENTS 2 THE WORK OF THIS CONTRACT 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION 4 CONTRACT SUM 5 PAYMENTS 6 DISPUTE RESOLUTION 7 TERMINATION OR SUSPENSION a MISCELLANEOUS PROVISIONS 9 ENUMERATION OF CONTRACT DOCUMENTS 10 INSURANCE AND BONDS ARTICLE 1 THE CONTRACT DOCUMENTS .The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed - -in this Agreement and Modifications issued after execution of this Agreement, all of which form the Contract, and are .as fully a part of the. Contract as if attached to this. Agreement or repealed herein. The Contract, together with the performance bond and payment bond, if any, represent the entire and integrated agreement between the parties hereto `and supersedes prior negotiations, representations or agreements, either written or oral. An enumeration of the '.Contract Documents, other than Modifications, appears inArticle 9. - -. ARTICLE 2 THE WORK OF THIS CONTRACT ..The Contractor shall fully execute the Work described in the Contract Documents, except as specifically indicated in the Contract Documents to be the responsibility of others Contract Requirements: Provide all labor, material and equipment to complete the installation of all fencing, .'gates, and softball field safety netting systems complete as: noted in the construction documents and per the followings, 'Division I -General Requirements, Complete Section 312000— Earth Moving *' - Section 3231:13— Chain Link Fences & Gates Section 033000—Cast In -Place Concrete" - ** As Applicable to this scope of work - :This contract specifically includes: but Is not. limited to: . - • Furnish and install all fences, gates, gate frames, gate posts and applicable hardware in accordance with construction documents. • Furnish and install softball field safety netting,.. poles and hardware for a complete installation. Include excavation, concrete foundations and equipment necessary to. complete work scope.. • Provide all excavation andbackfill as required for this scope of work. • Fumish and install all concrete and accessories as required for completingthe work within this work package. • All Construction shall follow OSHA standards and requirements. I.: • Contractor to verify all dimensions prior to the start of work. AIA Document A132TM — 2009:/formerly AIOIwCMa —1992). Copyright O 1975,1980, 1992 and 2009 by The Amedcan Institute of Archllecu. All rights Intl reserved. WARNING: This AIADocument Is protected by U.S. Copyright Lbw and International Trestles. Unauthorized reproduction or distribution of 2 -this AIA! Document, or any portion of It may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under - 1 the law. This document was produced by AIA software at 09:2205 on 12/3112014 under Order Nm6627595385 7:whlch expires on 0110712015: and is not for. resale. - User Notes: (1667586671) i ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION § 3.1 The date of commencement of the Work shall be the date of this Agreement unless a different date is stated below orprovision is made for the date to be fixed in a notice to proceed issued by the Owner,- . : (Insert the date ofcommencement, ifit dfersfrom the date ofthis Agreement or, 1fapplicable, state that the: date will be fired in a notice to proceed.) The commencement date Will be fixed in a notice to proceed. If, prior to the commencement of the Work, the Owner requires time to file mortgages, mechanics' liens and other security interests, the Owner's time requirement shall be as follows: § 3.2 The Contract Time ' shall be measured from the date of commencement. § 3.3 The Contractor shall achieve Substantial Completion of the entire Work not later than ( ) days from the date `ofcommencement, .orasfollows: . (Insert number ofcalendar days. Alternatively, a calendar date may be used when coordinated with the date of commencement If oppropriate, Insert requirements for earlier Substantial Completion ofcertain portions: of the" Work.) The work shall be substantially complete by July 2, 2015. (Table deleted) subjeorto adjustments ofthis Contract Time as provided in the Contract Documents. (Insert provisions, ifany, for liquidated damages relating to failure to achieve Substantial Completion on time orfor bonuspaymenlsforearly completion oftheWork) In the event the Contractor, without excuse, fails to achieve Substantial Completion with in the Contract Time, the Contractor shall pay to the Owner as liquidated damages, and not as a penalty, the sum of One Thousand Dollars ($1,000.00) or y40/o ofthe Contract Value (whichever is greater) for each and every calendar day following the end of the Contract Time untilSubstantial Completion is achieved; provided thatthe Contractor shall not be liable for liquidated damages for a day, or days of the excusable delay occurring during such period following the end of the `Contract Time. ARTICLE 4 CONTRACT SUM '§ 4.1 The owner shall pay the Contractor the Contract Sum in current funds for the: Contractor's performance of the :Contract. The Contract Sum shall be one of the following: `.(Check the appropriate box.) -I [ X.] Stipulated Sum, in accordance with Section 4.2 below - [. ] Cost of the Work plus the Contractor's Fee Without a Guaranteed Maximum Price, in accordance - - With. Section 4.3: below [ ] Cost of the Work plus the Contractor's Fee with a Guaranteed Maximum Price,: in. accordance with Section 4.4 below - - :.(Based on the selection above, complete Section 4.2, 4.3 or 4.4 below Based on the selection above,. also complete _ `either Section 5.1.4, 5.1.5 or 5.1.6. below.) § 4.2 Stipulated Sum § 4,2.1 The StipulatedSumshall be One Hundred Six Thousand Five Hundred Dollars and Zero Cents ($ 106,500.00 -. ), subject to additions and deletions as provided in the Contract Documents. Base Bid - $106,500.00 AIA Document At 32TM— 2009 towerly A101TMCMa-1992): Copydght O 1975,1960 1992 and 2009 by The American InslItuta of Architects. All rights IOIL reserved. WARNING: This AIADocument Is protected by U.S. Copyright Law and International Trestles. Unauthorized reproduction or dlstrlbutlon of 3 this Ale Document, or any portion of It, may result in severe civil and edminal penalties, and will be prosecuted to the maximum extent possible under I the law. This document was produced by AIA software at 09:22:05 on 12/3112014 under Order No 5527595395_1. which expires an 01107/2015; and Is not for " resale. user Notes:. (7657599971) Alternate No, l NOT ACCEPTED Alternate No. 2 $0,00 Alternate No. 3 $0.00 ':.Alternate No. 4 $0.00 Alternate No. S $0.00 Alternate No. 6 _ $0.00 `Total Contract Amount $106,500.00. `. § 4.2.2 The Stipulated Sum is based on the following alternates, if any, which are described in the Contract Documents. and are hereby accepted by the Owner. - '-(State the numbers or other identification of accepted alternates. /f the bidding or proposal documents permit the .Owner to accept other alternates subsequent to the execution of this Agreement, attach a schedule of stick other alternates showing the amount for each and the date when that amount expires.) Alternate No. 2 - Road Connection with Additional Parking: Refer to Sheets L1.3, GD.2.2,GD.3.1, and SO. 1.1. `Alternate No. 3 - Restroom Building: Refer to Sheets Lt. 1, Al. 1, A2.1, A2.2, A2.3, A3.1, A4.1, MG0.0, MOO. 1, M1.0, M2.0 M3.0, EG0.0, 130. 1, EI-.1, E1.2, and E2.0. - Alternate No. 4 - Large Shelters: Refer to Sheet Ll.1 and Spec Section 107300 Shade Shelters. Alternate No. 5 - Synthetic Turf. Refer to Sheet L1.1 and Spec Section 921613 Synthetic Turf Surfacing. Alternate No. 6 — Irrigation Pipeline Replacement: Refer to Sheet GIRR.1. § 4.2.3 Unit, prices, if any: (Idenitry and state the unit price, and state the quantity limitations, if any, to which the unit price will be applicable.) Item Units and Limitations Price per Unit ($0.00) § 424 Allowances included in the Stipulated Sum, if any: (Identify allowance and state exclusions, if any, from the allowance price.) Item Allowance (Paragraphs deleted) (Table deleted) (Paragraphs deleted) (Table deleted) (Paragraphs, deleted) (Table deleted) (Paragraphs deleted) ARTICLE 5 PAYMENTS § 5.1 Progress Payments '§ 5.1.1 Based upon Applications for: Payment properly submitted to the Construction Manager by the Contractor, and upon certification ofthe Project Application and Project Certificate for Payment or Application for Payment and Certificate for Payment by the Construction Manager and Architect and issuance by the Architect, the Owner shall - make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents: § 5.1.2 The period covered by each -Application for Payment shall be one calendar month ending on the last day of the month, or as follows: AIA Document A1132--2008 formedy M01-CMa— 1992). Copyright 01975,1960,1992 and 2009 by The AmedcanlnsOlute of Architects. All rights InIL reserved. WARNING: This AIA` Document Ia protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of 4 ,his AIA*. Document, or any portion of It, may result In severe civil and criminal penalties, and will be pwaecuted to the maximum extent possible under )... the law. This document was produced by AIA software at 09:22:05 on 12101/2014 under Order No.65275963851 which expires on 01/07/2015, and is not for resale. User Notes: -(1667586671) § 5.1.3 Provided that an Application for. Payment is received by the Construction Manager not later than the Twenty-fifth day of a month, the Owner shall make payment of the certified amount in the Application for Payment to -the Contractor not later than the Twenty-fifth day of the following month. If an Application for Payment is received by the Construction Manager afterthe application date fixed above, payment shall be made by the Owner not later than Thirty ( 30 ) days after the Construction Manager receives the Application for Payment (Federal, slate or local laws. may require payment within a certain period of time) - § 5.1.4 Progress Payments Where the Contract Sum Is Based on a Stipulated Sum § 5.1.4.1 Each Application for Payment shall be based on the most recent schedule of values submitted by the :.Contractor and approved in writing by the Construction Manager and Architect in accordance with the Contract Documents.: The schedule of values shall allocate the entire Contract Sum among the various portions ofthe Work and be prepared in such form: and supported by such data to substantiate its accuracy as the Construction Manager and Architect may require. This schedule, when, and onlywhen, approved in writing by the Construction Manager or Architect, shall be used asabasis for reviewing the Contractor's Applications for Payment. § 5.1.4.2 Applications for Payment shall show the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. § 5.1.4.3 Subject to the provisions of the Contract Documents, the amount ofeach progress payment shall be computed as follows: - - .1 Take that portion ofthe Contract Sum properly allocable to completed Work as determined by ". multiplying the percentage completion of each portion of the Work by the share of thetotal Contract Sum allocated to that portion of the Work intheapproved schedule ofvalues, :less retainage of Five _ percent ( 5.00%). Pending final determination of cost to the Ownerofchanges in the Work, amounts not in dispute may included as provided in Section 7.3.9 of the General Conditions, as modified; .2 Add thatlportion,of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction (or, if approved in writing in advance by the Owner, suitably stored off the site at a location agreed upon in writing), less retainage of Five percent ( 5.00 0/s); .3" Subtract the aggregate of previous payments made by the Owner; ,4 Subtract amounts, if any, for which the Construction Manager or Architect has withheld or nullified a Certificate for Payment as provided in Section 9.5 of the General Conditions, as modified; and .5 ` Subtract amounts, if any, being withheld by the Owner or Construction Manager as provided in the Contract Documents. 5.1.4.4 The progress payment amount determined in accordance with Section 5.1.4.3 shall be further modified under the following circumstances: .1 Add, upon Substantial Completion of the Work, a sum sufficient to increase the total payments to Ninety-five percent (95.00 %) of the Contract Sum, less such amounts as the Construction Manager recommends and the Architect determines for incomplete or defective Work, or both and unsettled claims; and .2 :` Add, if final completion of the Work is thereafter materially delayed through no fault of the Contractor, any additional amounts payable in accordance with Section 9.10.3 of the General Conditions, as. modified::. § 5.1.4.5 Reduction or limitation of retainage, if any, shall be as follows: (Jfil is intended, prior to Substantial Completion ofthe entire Work to reduce orlimil the retainage restdlingfrom the percentages. inserted in Sections 5.1.4.3.1 and 5.1.4.3.2 above, and this is not explained elsewhere: in the Conti -act `- - Documents„ insert here provisions far such reduction or limitation.) - - No reduction in retainage will be allowed prior tofinal completion without written approval of the. Owner. (Paragraphs deleted) § 5.1.4.6 A condition will be included forbidding more retainage from a contractor or supplier than retained from their portion of the Work...: AIA Document A132-- 2009 Ii fermady A701-CMa— 1992)`. Copyright 01976.1980, 1992 and 2009 by The American Institute or Architects. All rights Init renamed. WARNING: This AIAO Document Is protected by U.S. Copyright Lew and International Trestles. Unauthorized reproduction or dletribullon of 5 this AIA* Document, or any portion of It may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under I the law. This document was produced by AIA saftwers at 09:22:05 an 12/3112014 under Order No,6527595385_7 which expires on 01107/2015, and Is not for resale. User Notes: _ .17867586671) § 5.2 Final Payment § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor's responsibility to correct Work as provided in Section 12.2 of AIA Document A232=2009 as modified, and to satisfy other requirements, if any, which extend beyond final payment; .2 the Contractor has submitted a final accounting for the Cost of the Work; pursuant to Exhibit A, Determination of the Cost of the: Work when payment is on the basis of the Cost of the Work with or without a -.Guaranteed Maximum payment; and _ - 3 a final Certificatefor Payment or Project Certificate for Payment has been issued by the Architect; such final payment shall be made by the Owner not more than 30 days after(1) the Contractor has fully performed the Contract and (2) the issuance of the Certificate for Payment or Project Certificate for Payment, or as follows: ARTICLE 6 DISPUTE RESOLUTION § 6.1 Initial Decision Maker The Architect will serve as Initial Decision Maker pursuant to Section 15.2 of AIA Document A232-2009 as modified, unless the parties appoint below another individual, not a party to this Agreement, to serve as Initial Decision Maker. (If thepartles mutually agree, insert the name, address and other contact Information ofthe Initial Decision Maker, if - other than theArchitect.) § 6.2 Binding Dispute Resolution For any Claim subject to but not resolved by,. mediation pursuant to Section 15.3 of AIA Document A232-2009 as modified, the method of binding dispute resolution shall be as follows: ,(Check the appropriate box. If the Owner and Contractor do not select a method of binding alspute resolution below, or do not subsequently agree in writing to a binding dispute resolution method other than litigation, Claims will be resolved by litigation in a court of compelent jurisdiction) [ ] Arbitration pursuant to Section 15.4 of AIA Document A232-2009. [X] Litigation in a court of competent jurisdiction, -- [.-:] Other: (Specify) ARTICLE 7 TERMINATION OR SUSPENSION § 7.1 Where the Contract Sum is a Stipulated Sum § 7.1.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of AIA Document A232-2009 as modified. § 7.1.2 The Work may be suspended by the Owner as provided in Article 14 of AIA Document A232-2009 as modified. (Paragraphs. deleted) ARTICLE 8 MISCELLANEOUS PROVISIONS § 8.1 Where reference is made in this Agreement to a provision of AIA Document A232-2009 as modified or another Contract Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. § 8.2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below, or in absence thereof,-. at the legal rate prevailing from time to time at the place where the Project is located. (Insert rate of interest agreed upon,, ifany.) - 3/4 of I% per month § 8.3 The Owner's representative: AIA Document A132--2009formally A1101TMClAa— 1992). Copyright m 1975. 1980.1992 and 2009 by The American Institute of Archllects. All rights Init reserved. WARNING: This AIAt Document Is protected by U.S. Copyright Law and International Trestles. Unauthorized reproduction or distribution of 6 this Ale Document, or any portion of it may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under t the law. This document was produced by AIA software at 09:22:05 on 12/31/2014 under Order No.6527695386_1 which expires on 01101/2015; sod is not for resale User Notes: - (1667506671). (Name, address and other information) ..:Keith Watts, Purchasing Manager I. City ofMeridian . Purchasing Department 33. East Broadway Avenue - Meridian, Idaho 83642 §.8.4The Contractor's representative: - (Name, address and other information) Jared Bell Telephone Number: 208-8640203 :Mobile Number: 208-870-1779 Email Address: jab@buttefence.com § 8.5 Neither the Owner's nor the Contractor's representative shall be changed without ten days written notice to the other party. § 8.6 Other. provisions: r. ARTICLE 9 ENUMERATION OF CONTRACT DOCUMENTS § 9.1 The Contract Documents, except. for Modifications issued after execution of this Agreement, are enumerated in the sections below. § 9.1.1 The Agreement is this executed AIA Document A132-2009 as modified, Standard Form of Agreement Between Owner and Contractor, Construction Manager as Adviser Edition: § 9.1.2 The General Conditions are, AIA Document A232-2009 as modified, General Conditions of the Contract for Construction, Construction Manager as Adviser Edition. ' § 9.1.3The .Supplementary and other .Conditions ofthe Contract: Document Title Date Pages ExhibitA Contract. Document Schedule ` 12/22/2014 2 § 9.1A The Specifications: (Either list the Specifications here or refer to an exhibit attached to this Agreement.) Title of Specifications exhibit:. Contract Document Schedule, Exhibit A, dated December 22, 2014 (Table deleted) § 9.1.5TheDrawings: ;(Either list the Dralvings here or. refer to an exhibit attached to this Agreement.) ;Title of Drawings exhibit: Contract DocumentSchedule, Exhibit A. dated December 22,:2014 (Table deleted) § 9.1.6 The Addenda, if any: Number Date Pages One 12/15/2014 2 Portions of Addenda relating to bidding requirements are not. part of the Contract Documents unless the bidding requirements are also enumerated in this Article 9. AIA Document A132-- 2009IIformady A101 TMCMa —19821-Copydght 01975, 1980, 1992 end 2009 by The American InsgWte of Archlleels. All rights IRIL reserved. WARNING: This AIA k Document Is protected by U.S. Copyright Law and International Treatles. Unauthorized reproduction or disWbution of 7 this AJAe Document, or any portion of It, may result In severe civil and criminal penalties, and will be pmeacuted to the maximum extent possible under: the law. This document was produced by AIA software at oBi22t05 on 12/3112014 under Order No,6527595385_1which expires on 0110712015, and Is not for resale. User Notes (1667586671) § 9.1.7 Additional documents, if any, forming part of the Contract Documents are: .1 AIA Document A132Tm-2009, Exhibit A, Determination of the Cost of the Work, if applicable. .2 AIA Document E201T" 2007, Digital Data Protocol Exhibit, if completed, or the following: N/A .3 ATA Document E202Tm 2008, Building Information Modeling Protocol Exhibit, if completed, or the following: N/A .4 Other documents, if any, listed below: (List here any additional documents which are intended to form part of the Contract Documents. AIA Document A232-2009 provides that bidding requirements such as advertisement or invitation to bid, Instructions to Bidders, sample forms and the Contractor's bid are not part of the Contract Documents unless enumerated in this Agreement. They should be listed here only if intended to be part of the Contract Documents.) All binding documents including the Invitation to Bid, Instructions to Bidders, Supplemental Instructions to Bidders, Bid Proposal Forms, and the Project Schedule are intended to be part of the Contract Documents. AIA Document A232-2009 General Conditions Exhibit A, Contract Document Schedule dated 12/22/2014 ARTICLE 10 INSURANCE AND BONDS The Contractor shall purchase and maintain insurance and provide bonds as set forth in Article I 1 of AIA Document A232-2009 as modified Refer to Supplemental Conditions modifying AIA Document A232-2009 for changes and additions to Article 11 "Insurance and Bonds". Contractor is required to provide 100% Payment and Performance Bonds. (State bonding requirements, ifany, and limits ofliabilityfor insurance required in Article II of AIA Document A232-2009) Type of Insurance or Bond Limit of Liability or Bond Amount ($0.00) This AAreen s mer coed it as of the day and year first written above. OWNER ((,Sig/nlT —r COT CTOR (Signature) Tammy de Weerd , Mayor JrA/CJ, B1(t /"✓�S A�v (Printed name and title) (Printed name and tit/l) AIA Document A132T°-2009 formerly A101T'"CMa— 1992). Copyright ®1975,1980, 1992 and 2009 by The American Institute of Architects. All rights [nit. reserved. WARNING: This AIA Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of B this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under t the law. This document was produced by AIA software at 09:22:05 on 12/31/2014 under Order No.6527595385 1 which expires on 01/07/2015, and is not for resale. User Notes: (1667586671) CONTRACT DOCUMENT SCHEDULE (EXHIBIT A) City of Meridian Storey, Park Development 430 E Watertower Street Meridian, Idaho 83642 KC PROJECT NO. 14-085 December 22, 2014 PROJECT DOCUMENTS as issued by Insight Architects, P.A. and prepared by the following project team: Architect - Insight Architects, P.A. Structural Engineer-AHJ Engineers,PC Civil Engineer- Erickson Civil Landscape Architect- Jensen Belts Associates Mechanical Engineer-MusgroveEngineering, P.A. Electrical Engineer- Musgrove Engineering, P.A. Construction Manager -Kralzenbeck Constructors PROJECT MANUALS Instructions to Bidders,Complete - Dated November 21, 2014 Project Manual. Complete- Dated November 21, 2014 ADDENDUMS Addendum No. One -Dated December 15, 2014 DRAWINGS -Dated November 21, 2014 A.01- Cover Sheet Civil C1.0' Cover Sheet C1A Notes C1.2' Topographic Survey GDA Overall Grading Plan & Earthwork Req. - GDA Grading & Drainage Plan -Area 1 GD2.0 Grading & Drainage Plan -Area 2 GD.2.1 Grading &,Drainage Plan - Area .2 (All #1) GD.2.2. Grading & Drainage Plan -Area 2 (Alt #2) GD.3.0 .Section Views (Base Bid) - GD.3.1. Section Views .(Alt #1 VAft #2). GD.3.2 Internal Pathway Alignments GD.3.3 Internal Pathway Profiles -l- GD.3.4 Internal Pathway Profiles- 2 - GDA Roadway Profile & Details- l GD.5 Details -2 GD.S. Details -3 SD.1 - Storm Drain Base Bid & Alt #1) SD.1.1 Storm Drain (Aft #2) SD.2 Store Drain Details - I SD.3 - Slone Drain Details -2 GIRRA `.Gravity Irrigation (Aft #0) - UT.1 Utility Plan SPA SWPPP- Cover Sheet SP.2 SWPPP Plan Sheet SP.3 SWPPP- Details Landscape L1.1 Site .Plan - Area l. L1.2 Site Plan -Area 2. L1.3 Site Plan- .Area 2 . L2.1 Landscape Plan Area l L2.2 Landscape Pian -Area 2 L2.3 Landscape Plan -Area 2 -L3.1 :. Irrigation Plan - Area l L3.2 Irrigation Plan -Area 2 L3.3 irrigation Pian -Area 2 Architectural' A1.1 --Floor Plan, Roof Plan, Roof Framing Pian, Reflected. Ceiling Plan, Foundation Plan A2.1 Building Sections,. Details A2.2 Details' A2.3 Details. A3.1 Exterior Elevations, Interior Elevations A4.1 General Structural Notes/Schedules Mechanical 'MG0.0 - Mechanical Cover Sheet MG0.1 Energy Code Compliance M1.0 .Mechanical Plans M2.0 Mechanical Details -. M3.0 Mechanical Schedules Storey Park Development December 22, 2014 Page l of 2 I Electrical EG0.0 Electrical Cover Sheet & Detalls EG1.0 Lighting Compliance Forms E1.1 Electrical Site Plan — Area 1 E1.2 Electrical Site Plan — Area 2 E2.0 Electrical Plans & Schedules Storey Park Development Page 2 of 2 December 22, 2014